Marco Antonio Nardin França

Marco Antonio Nardin França Email and Phone Number

Diretor de Contrato na Andrade Gutierrez S. A. @ Andrade Gutierrez S.A.
Marco Antonio Nardin França's Location
Salvador, Bahia, Brazil, Brazil
Marco Antonio Nardin França's Contact Details

Marco Antonio Nardin França work email

Marco Antonio Nardin França personal email

n/a
About Marco Antonio Nardin França

35 years of experience in execution of bigs civil projects. Construction Manager.Worked in several infrastructure construction works enclosing: soil and rock excavation, concrete structures, drainage, pavement, urbanization, road bridges, viaducts and roads, tunnels, ports and pipelines.Currently working as Contract Director for a dam in the Dominican Republic. Main numbers:- Contract value: USD 588.0MM- Concrete: 250,000m3- Excavation 11,000,000m3- Landfill: 5,500,000m3- extension: 1.400m- maximum height: 57mExperience:- 196 km of pipeline with diameter of 20 inch in Amazon Forest for PETROBRAS;- 441 km of pipeline with diameter of 26 inch in Brazil Northeast region for PETROBRAS;- 12,500,000 m3 of rock excavation, 380,000 m3 of structural concrete and 2,800 m of tunnel excavation in the Campos Novos Hidro-Power Plant. 880 MW power for ENERCAN;- 1,700,000 m3 of structural concrete (70,000 m3 of concrete in an only month) in the Tucuruí Hidro-Power Plant. 4,350 MW of extended power for ELETRONORTE.Especializações: Elaboration of executive methods for obligator excavation and concrete structures, budgeting elaboration and development of concrete and metallic structures for industrial installations.

Marco Antonio Nardin França's Current Company Details
Andrade Gutierrez S.A.

Andrade Gutierrez S.A.

View
Diretor de Contrato na Andrade Gutierrez S. A.
Marco Antonio Nardin França Work Experience Details
  • Andrade Gutierrez S.A.
    Construction Director
    Andrade Gutierrez S.A. Oct 2017 - Present
    São Paulo, Sp, Br
    Contract Director of the Montegrande Consortium, responsible for executing the Montegrande Dam and the irrigation works of the Yaque del Sur river basin, contracted by INDRHI - National Institute of Water Resources of the Dominican Republic. The Montegrande Dam is a work of high social impact, with the function of storing water for irrigation and human consumption, as well as controlling floods during the annual period of storms and hurricanes.The project consists of an embankment dam with an asphalt core, with 2,200m of length and 5,300,000m3 of landfill. It has control structures composed of a spillway, bottom discharger and water intake representing 245,000m3 of concrete. The river diversion was made through two tunnels of 8m in diameter and 270m in length each.The total value of the contract is US$ 588.00MM and at its peak it had a total of 2,500 direct employees.
  • Andrade Gutierrez S.A.
    Construction Director
    Andrade Gutierrez S.A. Jul 2013 - Sep 2017
    São Paulo, Sp, Br
    Responsible for the Contractual Administration and Control Management, supporting the Presidency Area of the Construction Business Unit, a company linked to Andrade Gutierrez - Engenharia e Construção. The objective of these area is to train and qualify the work teams in good contractual administration practices, aiming at the fulfillment of contracts within the bases agreed with the client, in order to guarantee their economic and financial balance. It is also the function of this area to monitor the performance of the works, preparing result analyzes that efficiently guide decision-making by the Board and the Presidency of Construction.As of August/2015, I accumulated the role of proposal superintendent, coordinating a team of professionals (contract managers, area managers) in several proposal studies, contributing to the development of executive methodologies, risk analysis and cost, verification of planning and schedules, price compositions, etc.
  • Andrade Gutierrez S.A.
    Construction Manager
    Andrade Gutierrez S.A. Sep 2011 - Jun 2013
    São Paulo, Sp, Br
    Acting as Manager of Contract Administration under alliance agreement for implementation of The Port of Rio Colorado Project in Argentina - Bahia Blanca (750km south of Buenos Aires) including: loop railway, wagon unloading system, storage warehouses for potassium, system transfer by conveyors, compaction system for potassium chloride and offshore works for potash shipment produced, including transfer system for loading, mooring, dolphins and ship loader system.The Customer is PRC – Projeto Rio Colorado, a VALE Group Company operating in Argentina, and the contract amount is USD 644.5 Milliones (base October/2010 - USD = 3.957 pesos).
  • Andrade Gutierrez S.A.
    Construction Manager
    Andrade Gutierrez S.A. Mar 2011 - Sep 2011
    São Paulo, Sp, Br
    Acting as Manager of Contract Administration under unit prices with global prices agreement for the Implementation of Projects for RLAM encompassing: executive design, supply of materials and equipment construction, electromechanical assembly, conditioning, testing and support the starting and operation of assisted units U-37 (HDT - Diesel Hydrotreating Unit), U-38 (UGH - Hydrogen Generation Unit), Substation SE-37 and Local Control House (CCL) for The Diesel’s Portfolio of The Landulpho Alves Mataripe Refinary - RLAM. The amount of the contract was R$ 1.4 Billion (base January/2008).
  • Andrade Gutierrez S.A.
    Construction Manager
    Andrade Gutierrez S.A. Mar 2009 - Feb 2011
    São Paulo, Sp, Br
    Acting as Operational Coordinator for Proposals of Industrial Area. Performing proposal elaboration activities for new projects: detailing of planning activities, executive methods and budgets in general.
  • Andrade Gutierrez S.A.
    Planning Manager
    Andrade Gutierrez S.A. Dec 2007 - Feb 2009
    São Paulo, Sp, Br
    Planning Manager of Urucu-Manaus Gas-pipeline – Amazon Forest. Responsible for the management of the planning team including analysis of executive methods, logistic, detailed programming of sites, management of goals and costs, taking the necessary actions for its accomplishment. I was responsible for the management of the budgets and costs team. Direct interface with the representative of the Client. The Urucu-Manaus Gas-pipeline consists in an enterprise with 196km of extension and 20 inch of diameter, incrusted in the Amazon Forest. This Workmanship was a big challenge considering logistic and technical solutions. It presented a peak of more than 3,500 employees distributed in 03 main encampments and 07 temporary encampments, all encampments inside in the forest. As main innovation, it was used load helicopters for pipes transportation to the jobs front and used rafts for assembly floating columns that, after this, they were installed in submerged ditches. 09 directional drillings was executed detaching the Solimões River transposition, with 1,900m of extension of.
  • Andrade Gutierrez S.A.
    Construction Manager
    Andrade Gutierrez S.A. May 2006 - Nov 2007
    São Paulo, Sp, Br
    AG's Representative in the Malha Nordeste II Project. A big pipeline project with participation of big brazilians companies: Camargo Corrêa, Queiroz Galvão, GDK and Toyo Engineering Corporation for the execution of the Gas Pipeline Malha Nordeste II, property of TNT – Nova Transportadora do Nordeste Ltda. The work is constituted of a main line of 441km of extension with diameter of 26" and more two lines with diameter of 14" and an extension of 27km each one.
  • Nedl - Construções De Dutos Do Nordeste Ltda.
    Budget And Costs Coordinator
    Nedl - Construções De Dutos Do Nordeste Ltda. Jul 2004 - May 2006
    NEDL is a company (trust) with participation of Camargo Corrêa, Andrade Gutierrez, Queiroz Galvão, GDK and Toyo Engineering Corporation for the exclusive execution of the Gas Pipeline Malha Nordeste II, property of TNT – Nova Transportadora do Nordeste Ltda.. The work is constituted of a main line of 441km of extension with diameter of 26" and more two lines with diameter of 14" and an extension of 27km each one.My function is to coordinate the budget costs area, including administration of subcontracts, administration of main contract, claims elaboration, cost analysis, economical viability studies and other activities correlate to the commercial area.
  • Camargo Corrêa
    Autonomous Planning Consultant
    Camargo Corrêa May 2003 - Jun 2004
    Sao Paulo, Sp, Br
    Performing Planning and proposal elaboration activities for the following pipeline projects: - Nordeste II Gas Pipeline (BA – SE), A main line with 441km of extension and 26” of diameter and more two secondary lines with 27km and 29km and 14”of diameter. Client: PETROBRÁS S.A. Joint Venture Constructor: Camargo Corrêa / TOYO Engineering Corporation / Queiroz Galvão / Andrade Gutierrez / GDK;- PDET/ORVAP Oil Pipeline (RJ – SP): 604 km of extension with a diameter of 38". Client: PETROBRÁS S.A. Joint Venture Construction: Camargo Corrêa / TOYO Engineering Corporation / Norberto Odebrecht / OAS Etesco;- Nordeste Gas Pipeline (PE): 32 km of extension with a diameter of 16”. Client: PETROBRÁS S.A. Constructor: Construções e Comércio Camargo Corrêa S.A.;- Termo-Pernambuco Gas Pipeline (PE), 10,50km of extension with a diameter of 16”. Client: Petrobrás. Constructor: Construções e Comércio Camargo Corrêa S.A.;
  • Camargo Corrêa
    Project Planning And Coordination:
    Camargo Corrêa May 2002 - Mar 2003
    Sao Paulo, Sp, Br
    Engaged in planning for EPC contracts, from company head-office, for Hydro Power Plant, comprising project conception, civil works, mechanical supply and electromechanical assembly, as well as, financial accompaniment of contracts and its analysis in relation to the executed services:- UHE Campos Novos (SC) - 880MW;- UHE Barra Grande (RS) - 690MW;- UHE Serra do Facão (GO) - 210MW;- UHE CERAN - Complexo Energético Rio das Antas (RS) - 360MW.
  • Camargo Corrêa
    · Planning And Engineering Manager
    Camargo Corrêa Jun 2001 - Apr 2002
    Sao Paulo, Sp, Br
    Coordinated the planning and engineering management in the works of Campos Novos Hydro Power Plant for a group of private clients: CPFL, CBA, CNT CEEE and CELESC. It was a private enterprise, with 201m of maximum height and 880MW of installed power. The main amounts were: 380.000m³ of concrete structural and 12.500.000m³ of rock excavation. Activities included: elaboration of executive methods for obligator excavation and concrete structures, budgeting elaboration and development of concrete and metallic structures for industrial installations.
  • Camargo Corrêa
    · Planning And Engineering Manager
    Camargo Corrêa Feb 1999 - May 2001
    Sao Paulo, Sp, Br
    Coordinated Planning and Engineering Team in development and detailing of excavation and structural concrete services in the Tucuruí Hydro Power Plant - Phase III, with 4.125MW of installed power for ELETRONORTE. The main amounts were: 1.671.100m³ of concrete structural and 6.290.000m³ of rock excavation. Others activities: budgeting elaboration and development of concrete and metallic structures for industrial installations.
  • Camargo Corrêa
    Contract Financial Manager
    Camargo Corrêa Feb 1998 - Jan 1999
    Sao Paulo, Sp, Br
    Was executing The Financial Management of lump-sum contract for construction of Alegria Sewer Treatment System for CEDAE - Companhia Estadual de Águas e Esgotos. Also accumulating The Planning Management.
  • Camargo Corrêa
    Project Manager
    Camargo Corrêa Aug 1997 - Jan 1998
    Sao Paulo, Sp, Br
    Manager of recovery activities, coordinating construction services, engineering, commercial and contract management in The Deposition Residues Area for ALCOA Client in ALUMAR Plant in São Luiz (MA), including construction of a tunnel linner with a diameter of 2,60m and 140 meters of extension.
  • Camargo Corrêa
    Construction Supervisor
    Camargo Corrêa Jan 1993 - Jul 1997
    Sao Paulo, Sp, Br
    Worked in several infrastructure construction works enclosing: soil and rock excavation, concrete structures, drainage, pavement, urbanization, road bridges, viaducts and road tunnels. Road construction works in Rio Grande do Sul state with total extension of more than 220 km for DAER - Departamento Autônomo de Estradas de Rodagem – RS and DNER – Departamento Nacional de Estradas de Rodagem; 1170m of stream canalization works in Pirajussara Stream in São Paulo-SP; Southwest-Downtown Road Corridor in São Paulo-SP, with 2 road tunnels with total extension of 1315 meters and a road bridge with 390 meters.
  • Camargo Corrêa
    Technical Supervisor
    Camargo Corrêa Feb 1989 - Dec 1992
    Sao Paulo, Sp, Br
    Engaged in the enlargement works of Santos Dumont Road, comprising 23km of pavement and 23 units of bridges and viaducts for DERSA - Desenvolvimento Rodoviário S.A. Was in charge of planning, budgeting and project activities. Also participated in works of the implementation of São Paulo Road Ring, with 20km of extension (between São Paulo and São Bernardo do Campo Cities), comprising excavation and compact services, pavement, drainage and urbanizations services. Coordinated the activities of planning, budgeting, measurements and quality control for Companhia do Metropolitano de São Paulo – METRÔ.
  • Camargo Corrêa
    Trainee Engineer
    Camargo Corrêa May 1988 - Jan 1989
    Sao Paulo, Sp, Br
    Worked in the construction of ETA-4 – Water Treatment Station of Campinas with total capacity of 2,4m³/s and a water supplier with 1500mm of diameter and 6.744m of extension, comprising excavation and compact services, pavement, concrete structures, drainage and finishing services, besides electromechanical assembly, tests and pre-operation of system for SANASA - Sociedade de Abastecimento de Água e Saneamento S.A. Was in charge of coordination of topography team, physic measurement, quality control (laboratory), planning, programming and follow-up. Also developed project for concrete structures.
  • Hidroservice - Engenharia De Projetos Ltda.
    Trainee Engineer
    Hidroservice - Engenharia De Projetos Ltda. Jan 1988 - Apr 1988
    Development of draining projects for railroads and highways. Elaboration of studies about vehicles flow for implantation of access ways to the Subway Tucuruvi Station and Integration Terminal Bus/Subway.

Marco Antonio Nardin França Skills

Planejamento De Projetos Primavera P6 Construction Engenharia Civil Civil Engineering Contract Management Engenharia De Projetos Project Planning Autocad Road Epc Estradas Pipelines Setor De Concreto Controle De Projetos Concrete Bridge Project Management Petroleum Highways Project Engineering Gas Factory Contract Negotiation Construction Management Inspection Dutos Planning Power Plants Civil Litigation Budget Proposals Project Control Spanish Water Controle De Custos Contractual Administration Ports Cost Control Mining Commissioning Project Estimation Feasibility Studies Civil Hidrelectric Power Plants Mechanical Assembly

Marco Antonio Nardin França Education Details

  • Universidade Estadual De Campinas
    Universidade Estadual De Campinas
    Civil Engineer

Frequently Asked Questions about Marco Antonio Nardin França

What company does Marco Antonio Nardin França work for?

Marco Antonio Nardin França works for Andrade Gutierrez S.a.

What is Marco Antonio Nardin França's role at the current company?

Marco Antonio Nardin França's current role is Diretor de Contrato na Andrade Gutierrez S. A..

What is Marco Antonio Nardin França's email address?

Marco Antonio Nardin França's email address is na****@****.com.br

What schools did Marco Antonio Nardin França attend?

Marco Antonio Nardin França attended Universidade Estadual De Campinas.

What are some of Marco Antonio Nardin França's interests?

Marco Antonio Nardin França has interest in Primavera Enterprise And Ms Project, Beyond User Knowledge About Sap R3, Windows Explorer, Windows 98, Excel, Windows Xp, Windows 2000, Powerpoint And Outlook, Access.

What skills is Marco Antonio Nardin França known for?

Marco Antonio Nardin França has skills like Planejamento De Projetos, Primavera P6, Construction, Engenharia Civil, Civil Engineering, Contract Management, Engenharia De Projetos, Project Planning, Autocad, Road, Epc, Estradas.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.