Cad & O&M Specialist - Contractor
During my time with the company I attended training courses for the following software packages: -Bentley ProjectwiseBentley Microstation V8iBentley Facilities Planner - FIS (Floorspace Information Systems).These software packages were utilised in my day to day working during my 23 months with BMW.Our department was responsible for all the facilities maintenance and the monitoring and improving of the heating, ventilation and air conditioning (HVAC) systems throughout… Show more During my time with the company I attended training courses for the following software packages: -Bentley ProjectwiseBentley Microstation V8iBentley Facilities Planner - FIS (Floorspace Information Systems).These software packages were utilised in my day to day working during my 23 months with BMW.Our department was responsible for all the facilities maintenance and the monitoring and improving of the heating, ventilation and air conditioning (HVAC) systems throughout the Oxford and Swindon sites.My first six months with the company was designated in creating an Excel index data base for the Oxford site and then the Swindon site encompassing all the Drawings, Technical Specifications, Health & Safety and O&M Manuals for each building. This index data base would aid the engineers in finding the relevant Electrical, Mechanical and Civil information required.To facilitate the above my responsibilities were: - • To navigating through the company’s electronic systems and identifying the available Electrical, Mechanical & Civil information which require registering on the new Index data base(MS Office Excel).• Move available drawings/layouts, O&M Manuals, H&S documents, specifications and schematics etc to the correct location within Projectwise on the main frame server in Munich.• Create new drawings & update existing drawings/layouts using CAD and amend existing data specifications, schematics and O&M’s etc to reflect modifications and additions on site.• Identify, locate and provide drawings/layouts, data specifications, O&M’s to the engineers & managers on request.• Update the (FIS) Floorspace Information Systems data for the buildings within the Oxford and Swindon BMW sites.My contract finished at the end of August 2015. Show less