Mark Zurowski
AeroLeads people directory · profile

Mark Zurowski Email & Phone Number

Design Delivery Manager On HS2 Old Oak Common Station at WSP
Location: Greater London, England, United Kingdom 11 work roles 1 school
1 work email found @wsp.com LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email m****@wsp.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
WSP
Role
Design Delivery Manager On HS2 Old Oak Common Station
Location
Greater London, England, United Kingdom
Company size

Who is Mark Zurowski? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Mark Zurowski is listed as Design Delivery Manager On HS2 Old Oak Common Station at WSP, a with 13 employees, based in Greater London, England, United Kingdom. AeroLeads shows a work email signal at wsp.com and a matched LinkedIn profile for Mark Zurowski.

Mark Zurowski previously worked as Lead Design Manager at Wsp and Senior Structural Engineer at Wood Group Psn. Mark Zurowski holds Bachelor Of Engineering, Civil, First Class Honours from University Of Melbourne.

Company email context

Email format at WSP

This section adds company-level context without repeating Mark Zurowski's masked contact details.

{first}.{last}@wsp.com
86% confidence

AeroLeads found 1 current-domain work email signal for Mark Zurowski. Compare company email patterns before reaching out.

Profile bio

About Mark Zurowski

I am a civil/structural engineer and design manager with 20 years of industry experience and am passionate about effectively managing and co-ordinating the delivery of large scale design projects. In my career, I have completed the design of complex structures, including topside modifications, on-shore processing facilities, wharves, industrial process plants, passenger and heavy haul rail infrastructure, sporting, retail, residential and commercial buildings. I have led the delivery of multi-discipline design projects with medium to large sized teams and conducted studies of large scale infrastructure and materials handling projects. I have gained extensive knowledge in all phases of project delivery, including FEED, concept and detailed design, technical and commercial evaluations of tenders, contract execution and operations in a wide range of sectors. I have sought this broad project exposure to develop an in-depth knowledge of a range of delivery methods and assurance regimes. I thoroughly enjoy working as part of a large team, defining and developing the strategic direction of the project and organisation. I also remain committed on a project until completion.

Listed skills include Structural Engineering, Engineering, Project Engineering, Structural Analysis, and 18 others.

Current workplace

Mark Zurowski's current company

Company context helps verify the profile and gives searchers a useful next step.

WSP
Wsp
Design Delivery Manager On HS2 Old Oak Common Station
London, GB
Website
Employees
13
AeroLeads page
11 roles

Mark Zurowski work experience

A career timeline built from the work history available for this profile.

Design Delivery Manager On Hs2 Old Oak Common Station

Wsp

London, Gb

Design Delivery Manager On Hs2 Old Oak Common Station

Wsp

London, United Kingdom

Lead Design Manager

Wsp

London, United Kingdom

Crossrail C422 Tottenham Court Road - Lead Design Manager• MEP, Architectural, Structural, Acoustic and Fire package co-ordination.• Commercial management, including processing of employer's instructions, communications and reporting, appointment and management of sub-contractors.• Crossrail gate process and change management protocol assurance. • Site support services/snagging revolution to main contractor.• Structural engineering team management.

Jul 2015 - Jan 2018

Senior Structural Engineer

Aberdeen, United Kingdom

Shell Integrated Services, Talisman Sinopec & BG Contracts - Topsides.• Export valve removal/replacement steel support cage/support grillage for up-ending operation. • Mid-life Compressor removal/replacement lifting frame and skidding assessment on main deck. • Caisson strengthening (swage/clamp) installation and full scale on shore mock-up. • On-shore caisson clamp install test frame.• Umbilical & Riser winching systems.• Oil export pump replacement. • Temporary deck strengthening.• Ampelmann gangway support deck. • FPSO Impact Frame Replacement project • Winching design for riser pull on FPSO turret.• Lifeboat heatshield replacement. • Barge landing analysis.• Fuel hose handling station upgrade.• Exhaust structure integrity assessment.• Shell ISC BfD development. • Offshore surveying.• STAAD Pro Analysis • Rigging design.• Study report compilation.• Workpack compilation

Jun 2013 - Jun 2015

Lead Engineer

London, United Kingdom

• £14.8b Crossrail – Paddington New Yard (£50m)• Project leader for a team of 25 staff of civil, structural, geotechnical, mechanical, electrical engineers and draftsman.• Basis of design development.• Detailed construction phasing analysis (4D).• Pumping and piping systems and tank storage.• Drainage and earthworks design.• Power supply and distribution systems.• Instrumentation and monitoring.• Ground movement assessment.• Mechanical process flow development.• Operator collaboration. • Interface management.• Interactive risk assessments.• Bill of quantity and cost estimating.• Stakeholder presentations.• Structural & civil third party approvals.• Assurance gate process and documentation. • Technical and commercial tender evaluation• Resource planning.• Cost management.• 2D and 3D drawings/models in Microstation and Projectwise.• 400 drawings & 150 documents AFC.

Apr 2012 - Jul 2013

Senior Project Engineer

Perth, Australia

• US$8.4b Fortescue Metals Group (FMG) T155:Rail Expansion Project – Kanyirri Fuel Facility and Locomotive Provisioning Facility (AUD$75m).• Compiled FEED report.• Project team leader of 15 staff in lieu of the infrastructure manager during FEED. • Basis of design development for all infrastructure• Benchmarking study and report. • In ground services diversion/protection.• Pumping and piping systems for all fluids.• API 650 tank design.• Hazardous area clarification. • Mechanical process flow development, • Building CFD analysis• Surface water and earthworks design.• HV Power supply and LV distribution systems. • Automation & controls systems. • Potable, fire, waste and oily water treatment systems • Cost estimate compilation.• Stakeholder presentations and collaboration.• Implemented change management procedures.• Facilitated HAZOP workshops. • Operator and financier liaison.• Technical and commercial tender evaluation• Resource planning.• Cost management.• 2D and 3D drawings/models in Microstation.• 300 drawings & 100 documents AFC.• Site support.

Dec 2010 - Mar 2012

Study Manager & Structural Engineer

Perth, Australia

• $1.6b Oakajee Port wharf design and ship loader integration. • $43b Gorgon Project – Infrastructure. • $6b Sino-Iron Project – Cape Preston - Desalination Plant.• $40b Wheatstone Project – Non process infrastructure.I was responsible for engineering elements on Port Landside. I designed the 250m long wharf supporting the iron ore shiploader and the dolphins including the moormaster system. Considerations included; cyclonic winds, wave fatigue, long period waves, marine growth, littoral drift, accidental loading, surface treatment and pile socketing.I worked on 140ML/y esalination plant which included the FEA analysis of steel tanks and modularization/transportation analyses. I lead the design of pipe support modules and foundations. The design considerations included fire, blast and accidental loading and I co-ordinated all elements of the mechanical system with the structure. I lead the structural design for the non-process infrastructure including off-shore loading facilities and designed the structural supports for the on-shore facilities on a component of work on the Gorgon and Wheatstone projects. All structures were designed for cyclonic and blast loading.

Jan 2009 - Dec 2010

Senior Structural Engineer

London, United Kingdom

Projects• £260m London Aquatic Centre - Temporary Stands • £80m 190 Strand RedevelopmentThe dynamic structural analysis, using Arup’s in house software, significantly improved my analytical design skills. The geometric complexities required by Zaha Hadid Architects constantly stretched our engineering boundaries. The re-use of materials on the project was a key driver in design.

May 2007 - Nov 2008

Associate

London, United Kingdom

Projects• £38m Ulster Hospital Theatres – Belfast• £8m Butterfield Offices – Luton• £5m Norwich Theatre Refurbishment• £12m Waldron Health Centre – New Cross SE8• £8m Centro 1 & 2 Refurbishment – Camden NW1• £9m Havant BESD and Woodlands Schools – Havant, HantsI was promoted to Associate level and was responsible for multiple concurrently running projects, cost control, resource planning and was also involved in graduate development. The pioneering Butterfield office development utilising 85m earth ducts for ventilation and the Ulster Hospital development are two outstanding projects I worked on at P&M. My communication skills were also enhanced during this enjoyable period of employment along with the ability to work independently from my superiors.

May 2004 - May 2007

Senior Structural Engineer

London

Projects• £10b CrossRail – Liverpool St Station • £1b Thameslink 2000 – Farringdon Station• US$250m Delhi Metro – Ancillary Buildings• Camden Station RedevelopmentI moved to the UK in 2002 and was exposed to major rail infrastructure projects in London and India whilst working for Mott MacDonald. The site role in New Delhi was extremely challenging as it involved weaving engineering information together that was produced in offices from all over the world.

Oct 2002 - May 2004

Graduate Structural Engineer To Senior Structural Engineer

Melbourne, Sydney

I started my career at Connell Wagner in Melbourne and worked on major projects in Melbourne, Sydney and the iconic Wembley stadium roof. Projects include. • £750m Wembley Stadium – South roof design of 15m deep cable trusses and 100 thick top chord plates.• $300m Victoria stadium.• $280m Hisense Arena.• $40m Victoria Racing Club Grandstand.• $150m Hanoi Stadium.

Feb 1998 - Oct 2002
1 education record

Mark Zurowski education

FAQ

Frequently asked questions about Mark Zurowski

Quick answers generated from the profile data available on this page.

What company does Mark Zurowski work for?

Mark Zurowski works for WSP.

What is Mark Zurowski's role at WSP?

Mark Zurowski is listed as Design Delivery Manager On HS2 Old Oak Common Station at WSP.

What is Mark Zurowski's email address?

AeroLeads has found 1 work email signal at @wsp.com for Mark Zurowski at WSP.

Where is Mark Zurowski based?

Mark Zurowski is based in Greater London, England, United Kingdom while working with WSP.

What companies has Mark Zurowski worked for?

Mark Zurowski has worked for Wsp, Wood Group Psn, Capita Symonds, Calibre Global, and Aecom.

How can I contact Mark Zurowski?

You can use AeroLeads to view verified contact signals for Mark Zurowski at WSP, including work email, phone, and LinkedIn data when available.

What schools did Mark Zurowski attend?

Mark Zurowski holds Bachelor Of Engineering, Civil, First Class Honours from University Of Melbourne.

What skills is Mark Zurowski known for?

Mark Zurowski is listed with skills including Structural Engineering, Engineering, Project Engineering, Structural Analysis, Civil Engineering, Steel Structures, Feasibility Studies, and Steel.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Mark Zurowski you were looking for.

View similar profiles