Sr It Infrastructure Project Manager Data Center Build
- Gigafactory Texas Data Center build for 400 gig backbone AI related. Worked with and managed a team of 200 fiber and copper install techs. A data center pm specializing in fiber optics managed troubleshooting existing.
- Planned and executed new fiber optic cable runs based on network diagrams
- Thorough testing of newly installed fiber links to verify performance against specifications.
- Dressing Team:Dressed and groomed cables into cabinets so the Fiber Terminators can complete terminations
- TERMINATION OF FIBER: manage the termination of fiber optic connectors using appropriate tools and techniques to ensure optimal signal transmission both MMF and SMF Connections.
- Cable Management (Dressing):Managed the routing fiber optic cables within cable trays and pathways to maintain proper airflow and prevent damage.Labeling of Cables Implemented standardized cable labeling systems for.