Tonnage Oxygen Test Plant Manager
Allentown, Pennsylvania, Us
I managed and influenced all facets of a $60 million, developmental, government-funded (U.S. Dept. of Energy - DOE), novel technology oxygen-separation and power-generation test plant from construction through start-up. The plant delivered first-ever tonnage oxygen production (an extreme feat) by employing ion transport ceramic membranes (ITMs) and generated data for commercial plant design and operation. My key responsibilities and accomplishments were:- Manage stakeholder priorities: Balanced Project Engineering, ITM R&D Engineering, and Operations needs to achieve Company and DOE goals.- Commission and start-up plant safely while meeting DOE-contract goals: I created and executed commissioning plans involving 20+ mechanical/electrical/controls engineers and field technicians. I met DOE timing constraints for an incident-free start-up, and recognized and solved several safety and engineering challenges associated with equipment unique to ITM process.- Operate the plant to produce oxygen and power through use of ITM technology: I streamlined operating philosophy, and devised innovative process control improvements for robust, reliable tonnage oxygen/power production. I mentored and managed a 12-member staff over multiple runs, and I improved campaign turnaround time and cost by 35%.- Become the Company expert in starting up ITM plants: I achieved mastery in operation and maintenance of large compressors, gas burners generating wide-ranging flue gas temperatures (300-1800°F), one-of-a-kind high-temperature heat exchangers (>1600°F), specialty ceramic membranes, steam boilers, and gas-fired turbine/expander/generator.- Supervise the construction: Addressed and organized the resolution of critical engineering and safety issues. I coordinated work for 75 contractors to prepare for staged commissioning sequence.- Develop plant commissioning and operating budgets: Held expenses within DOE-contract budget.