Mark Warburton - Pmp
AeroLeads people directory · profile

Mark Warburton - Pmp Email & Phone Number

PMC Construction Head at Qatargas
Location: Ban Chang, Rayong, Thailand 15 work roles 5 schools
LinkedIn matched
✓ Verified May 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
PMC Construction Head
Location
Ban Chang, Rayong, Thailand
Company size

Who is Mark Warburton - Pmp? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Mark Warburton - Pmp is listed as PMC Construction Head at Qatargas, a company with 7860 employees, based in Ban Chang, Rayong, Thailand. AeroLeads shows a matched LinkedIn profile for Mark Warburton - Pmp.

Mark Warburton - Pmp previously worked as Construction Manager at Gasmeth and Construction Manager, Site EPC Execution at Saipem. Mark Warburton - Pmp holds Civil And Structural Engineering from Engineering Institute Of Technology.

Company email context

Email format at Qatargas

This section adds company-level context without repeating Mark Warburton - Pmp's masked contact details.

Qatargas

Review company-level records connected to Mark Warburton - Pmp before choosing the right outreach path.

Profile bio

About Mark Warburton - Pmp

Accomplished professional with 36 years of multidiscipline construction and project management experience within the oil & gas, energy and resource sectors. Experienced in the overall project and site management of Engineering, Construction, HSE, Quality Control and Project Control and that can successfully manage the development, planning, execution and close out of major complex projects, with particular attention to oil and gas project development.Civil & Structural Engineer and certified Project Management Professional (PMP) with the Project Management Institute. Comfortable working in an engineering and project management office environment as well as remote site construction locations. Open to relocation and rotational roles

Current workplace

Mark Warburton - Pmp's current company

Company context helps verify the profile and gives searchers a useful next step.

Qatargas
Qatargas
PMC Construction Head
Rayong, Thailand
Website
Employees
7860
AeroLeads page
15 roles

Mark Warburton - Pmp work experience

A career timeline built from the work history available for this profile.

Pmc Construction Head

Rayong, Thailand

Construction Manager

Current
Gasmeth
  • Owners site manager during the pre-FEED, FEED, detailed design and construction phases of a gas extraction, processing and compression project at Lake Kivu, Rwanda.
  • Preparation of the EPC contract, SOW and annexes
  • Verification of the project FEED documentation and detailing engineering changes
  • Preparation of the project and execution management plans
  • Preparation of the project cost estimate and the budget schedule
  • Establish the manpower estimates, mobilization plan, transport and accommodation plans.
Jan 2024 - Present

Pmc Construction Head

Ras Laffan, QA

Managing the EPC Contractor for all off plots and corridor works associated with the QatarGas North Field Expansion (NFE) project in Ras Laffan, Qatar. Site works included LNG Storage facilities, 170km of underground high pressure gas and above ground product line installation, micro-tunneling /thrust boring, open cut/culverts for road crossings, pig.

Jul 2022 - Dec 2023

Construction Manager, Site Epc Execution

Milan, Lombardy, IT

  • EPC Construction Manager in charge of Saipem scope of work for the Petrofac / Samsung / Saipem Joint Venture on the Thai Oil CFP (Clean Fuels Project) refinery in Siracha, Thailand.Scope of works includes all execution.
  • Overhauled based line schedules and introduced a system of Superintendent derived, and accountable, schedules that increased activity start and completion by 30% over a 4 month duration.
  • Devised a Civil Subcontractor financial incentive scheme that targeted key areas / buildings / equipment which allowed earlier mobilization of mechanical contractor increasing overall weekly productivity by 0.5%.
  • Introduced 3 additional subcontractors, allowing primary Subcontractors to complete key scheduled activities of the base scope with the limited manpower during Covid restrictions.
  • Finalized the heavy lifting of 9 vessels (7 x reactors, 1 x Vacuum Tower, 1 x Product Separator) total of 14,600 tons, with the heaviest reactor weighing 2,200 tons.
  • Targeted project metrics - Civil Concrete 126,000m3 - Structural Steel 24,000 tons - Pipe Welding 334,000DI.
Jun 2020 - Oct 2021

Construction Manager, Site Project Early Works Execution

Sharjah, AE

  • Construction Manager and Client representative for all early works associated with the greenfield, 2 train expansion of the existing Khor Mor Gas Facility in Kurdistan. Initial engineering and subcontract works include;
  • UXO Clearance of the area and Site surveys
  • Grub, cut & fill the construction area, consisting of approx. 1.2 mil m3
  • Relocation of existing above ground power & underground existing services corridors and roads
  • Water drainage and erosion control consisting of V-ditches, culverts, rip raps and geotextiles.
  • New water well drilling, pumps, storage and distribution system
Sep 2019 - Jun 2020

Pmc Construction Lead, Site Project Execution

US

  • Construction Lead and Client representative during the execution of the DS6, DS7 & DS8 Major Tie-Ins Projects, West Qurna 1, Basra, Iraq. Each of the Major Tie-In projects consists of new pipe rack corridors, wash.
  • Initiated Contractor mobilization and overseen temporary support facility installation
  • Facilitated construction execution between EPC Contractors, Field Operations and BOC in the brownfield areas
  • Implemented HSE, QA/QC, Project Control procedures, Work Control Procedures and Risk Assessments with subcontractors, and ensured owner team received and approved all documentation
  • Review and approval of construction documentation including Method Statements and JSA’s to facilitate the start of works
  • Managed field MOC processes and evaluations, and provided recommendations and path forward to facilitate approval and implementation of change as required.
Aug 2018 - Apr 2019

Construction Manager, Engineering Constructability And Field Verification

Dubai, AE

  • Construction Manager during the FEED, detailed design and Contract award of 3 major brownfield degassing station upgrade projects located at DS6, DS7 & DS8, West Qurna 1, Basra, Iraq. Each of the Major Tie-In projects.
  • Consultation, review, constructability and optimization during the design phase.
  • Design and constructability verification within the existing operational fields including clash identification and resolution.
  • Presentation and participation of Design, Constructability and Optimization reviews to the Client, Operations and BOC teams and providing feedback and oversight to Engineering disciplines.
  • Development input to the contract ITT SOW and conduct tenderer technical bid evaluation prior to contract award including preamble and construction input
  • Transition of works from design phase to construction execution
Sep 2016 - Aug 2018

Pmc Construction Manager, Company Site Representative

Omv

Vienna, AT

  • Clients Construction and Site Representative during the installation of a Central Processing Facility (CPF), Tank farm and Early Production Facilities (EPF) and general field construction activities, reporting to the.
  • Completed construction of an early production facility 3 weeks ahead of a 16-week schedule and within budget.
  • Developed and implemented a site safety incentive program reducing CPF project incident rate by 70%.
  • Served as Project Incident Management Team Leader and key member of the company IMT with involvement in all security and IMT drills, drill assessments, and remedial action implementation.
May 2013 - Jul 2015

Epc Construction Manager, Accommodation Camp Installation

Dubai, AE

  • Managed the daily site operations of a Construction Camp project, reporting to the Project Director in Australia. Reviewed and reported on construction progress and productivity, modifying construction activities as.
  • Ensured a safe worksite with a zero incident policy.
  • Planned a phase execution and completion of the camp construction, from an initial fly camp, to allow mobilize more personnel into new accommodation while maintaining schedule.
  • Identified issues with unskilled labor on the project and rectified by establishing a skills assessment program, creating an onsite training workshop, and training personnel in the basic craft requirements.
Apr 2011 - Jan 2013

Epc Site Manager, Project Construction Works

Dubai, AE

  • Reporting directly to Project Manager in overseeing site operations of an oil Central Processing Facility (CPF) construction project and ensuring subcontractors and all associated personnel followed HSE policies and.
  • 32,000m3 of Concrete, OPC and SRPC
  • 14,500 tons Structural Steel and Pipe Racks
  • All piping site spooled, total 22,000db
  • 8 Storage tanks for crude and condensate totaling 2,750k barrels
  • Above and below ground electrical and instrument cable installation totaling 62km
Nov 2009 - Apr 2011

Area Construction Superintendent, Pmc

US

  • Seconded to Exxon Mobil to coordinated construction activities of one largest condensate refineries in the world with a processing capacity of 146K barrels per stream day (BPSD), supervising activities of contractors.
  • Cultivated and maintained a strong, trusting open, relationship with EPC Contractors, Secondary Contractors & Vendors.
  • Identified, reviewed, and resolved problems and engineering issues to allow construction activities to continue unimpeded.
  • Closely liaised with Planning, Commissioning and Start Up to prioritise critical path activities.
Jun 2008 - Jul 2009

Auditing Consultant, Refinery Project

US

  • Team member during a 1 month 3rd Party Cold Eye Review on the Laffan Refinery construction project. Verified actual progress completed by contractor (GS Daewoo) and subcontractors against reported progress. Evaluated.
  • Assessed strengths and weaknesses of contractors and subcontractors’ manpower, skill base, supervision ratios and support staff.
  • Ensured MTO accuracy and short fall of materials identified.
  • Reevaluation of construction schedule base line and metrics, to provide a realistic schedule for project completion.
May 2008 - Jun 2008

Construction Manager, E&I Installation Works

Dubai, AE

Site based role responsible for the E&I works associated with Condensate Storage PH 1 & 2, LPG Storage and Loading, LNG Storage, Corridor Works and Berth Loading Facilities in 5 separate site work areas, based on a unit rate contract.

Mar 2007 - Jan 2008

Construction Superintendent, Workshop Fabrication And Site Installation Of E&I Equipment

Dubai, AE

Contract consisted of the installation of Electrical, Instrument & Communication works on the Dolphin Energy onshore processing facility in Ras Laffan, Qatar. The processing facility was comprised of two processing streams, each containing five independent trains and subsequent ancillary facilities.

Sep 2005 - Feb 2007

Additional Professional Experience, Australia

Various

E&I Installation Supervisor, O’Donnell Griffin, Western Australia, 2004-2005;E&I Installation Supervisor, Southern Cross Electrical Engineering, Western Australia, 2002-2003; Foreman Boilermaking / Welding / Rigging, JR Engineering Services, 2000-2002Boilermaker / Welder, Hydraulics, 2000; Boilermaker / Welder / Rigging, Foundry & Engineering Maintenance.

Nov 1985 - Mar 2005
5 education records

Mark Warburton - Pmp education

Civil And Structural Engineering

Engineering Institute Of Technology

Certification, Primavera Risk Analysis

Ccms

Pmp Certification, Pmp

Project Management Institute Chennai Chapter

Trade Certification, Welding And Steel Fabrication

Australian Apprenticeship Board

Certificate Of Trade Studies. (Australian Hnc Equivalent), Welding & Steel Fabrication

South Metropolitan Tafe
FAQ

Frequently asked questions about Mark Warburton - Pmp

Quick answers generated from the profile data available on this page.

What company does Mark Warburton - Pmp work for?

Mark Warburton - Pmp works for Qatargas.

What is Mark Warburton - Pmp's role at Qatargas?

Mark Warburton - Pmp is listed as PMC Construction Head at Qatargas.

Where is Mark Warburton - Pmp based?

Mark Warburton - Pmp is based in Ban Chang, Rayong, Thailand while working with Qatargas.

What companies has Mark Warburton - Pmp worked for?

Mark Warburton - Pmp has worked for Qatargas, Gasmeth, Saipem, Crescent Petroleum, and Exxonmobil.

How can I contact Mark Warburton - Pmp?

You can use AeroLeads to view verified contact signals for Mark Warburton - Pmp at Qatargas, including work email, phone, and LinkedIn data when available.

What schools did Mark Warburton - Pmp attend?

Mark Warburton - Pmp holds Civil And Structural Engineering from Engineering Institute Of Technology.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.