Max Mclean work email
- Valid
Max Mclean personal email
Deepwater Drilling and Completions Manager with 36 years of international experience on land rigs, jackups, semi-submersibles and drillships. Comfortable leading teams and managing all aspects of well delivery including rig contracting, inspection and assurance, budget management, well design, service contracting, materials and procurement, drilling and completion operations.Chartered Engineer with the Institute of Engineers Australia.Specialities: Deepwater Offshore Drilling, Remote Land Drilling, Project Management, Performance Delivery, ERD Well Design and Operations.
Perth
View- Website:
- rmarineperth.com.au
- Employees:
- 224
-
Semi RetiredPerthAustralia -
Career BreakPerth Apr 2023 - Present
-
Head, Well OperationsPetronas Mar 2019 - Apr 2023Kuala Lumpur, Kuala Lumpur, My -
DirectorMcl Services Pty Ltd. Jan 2017 - Mar 2019
-
Drilling ManagerNew Age (African Global Energy) Limited Dec 2017 - Dec 2018London, GbDrilling Manager leading an in country team to deliver two HTHP wells in the Etinde field, in 55m of water, using the Vantage Topaz Driller (BM-375 jack-up unit). Technically challenging campaign with borderline HTHP and very narrow pore pressure – fracture pressure window (< 1ppg) requiring the use of MPD in the reservoir sections. There was a requirement also for minimal discharge <1% so the TWMA thermal desorption system was employed. The team was assembled at short notice and the first well was spudded within 6 months. The scope was to prove up additional reservoir extent in preparation for a potential development campaign. The second well was successfully tested at a flow rate of 17.1 mmscft/d and 8780 bopd on a 56/64’’ inch choke.The campaign was delivered with no lost time injuries and the workscope was completed well within budget. The second well was drilled at 50% of the offset well cost. -
Drilling ManagerNew Age (African Global Energy) Limited Aug 2017 - Oct 2017London, GbShort workover campaign in the Shewashan field. The campaign involved working as Drilling Manager/ Supt. in a very small team with two land rigs (DQE 30 and 32). The scope was to conduct workovers on the wells including sidetracks, coiled tubing interventions and acid squeezes to improve well productivity. -
Drilling AdvisorNew Age (African Global Energy) Limited Feb 2017 - May 2017London, GbShort campaign in the AJE field performing one workover, two sidetracks and one subsea completion using the DP Drillship Pacific Bora in 300m of water. -
Well Engineering Contracts CoordinatorTullow Oil Dec 2015 - Dec 2016Chiswick, GbFamily residential position in Ghana. Position was responsible for the coordination of contractual negotiations and re-tendering as part of the Well Engineering Team. -
Well Delivery Manager (Ghana)Tullow Oil Dec 2012 - Nov 2015Chiswick, GbOverall in country accountability for Drilling and Completions in Ghana. This included all EHS and Operational Performance for the Deepwater Jubilee and TEN Developments and Ghana near field exploration. The team had two deep water dynamically positioned rigs running almost continuously. Initially the Transocean Sedco Energy and the Seadrill West Leo. Latterly the Stena DrillMax drillship replaced the Sedco Energy. The water depths for the fields varied from approximately 1600m to 2000m.The workscope was varied with the drilling of medium step out (up to 4km) development wells at +/- 3400m TVD and one 300m horizontal section (J-19). The completions side was equally interesting with Jubilee and TEN development multi-zone intelligent well completions as well as a rigless acid stimulation campaign using coiled tubing with a service vessel (BOA Deep C). The performance of the team was benchmarked first quartile year on year. The EHS performance improved over the period (West Leo achieved over 3 years LTI free).Represented Tullow Ghana Management team at TCM’s with governmental agencies and JV partners (EPA, GNPC, Kosmos, Anadarko and Petro SA). -
Drilling Manager (Ghana)Hess Corporation Feb 2010 - Dec 2012New York, Ny, UsDeepwater Exploration (1900m+ water depth). Set up the team and conducted the well planning from Houston intially prior to transition to Ghana (Takoradi) for detailed planning and operations with the Maersk Deliverer (6th Gen dual activity semi- sub).The team reformed in August 2011 to drill a further three exploration and appraisal wells using the 6th Generation drillship Stena DrillMax. All three wells were drilled with first quartile performance. A key driver for the team success was the development of an enabling environment culture with the Hess and Service Partner team. -
Drilling Manager (Libya)Hess Corporation 2009 - 2010New York, Ny, UsDeepwater Exploration (1000m water depth). Drilled with the Stena Forth (first well from the shipyard). Conducted two well tests with the Stena Forth (first Drillmax series rig to conduct a welltest). -
Drilling Superintendent (Gulf Of Mexico)Hess Corporation 2007 - 2009New York, Ny, UsDrilling Superintendent for Pony deepwater exploration in GOM (Green Canyon - 3200ft water). TD 33,000ft TVD.Drilling Superintendent for Conger 15K subsea development workovers (2000ft). -
Drilling Superintendent (Denmark)Hess Corporation Jan 2006 - Oct 2007New York, Ny, UsJack up operations over South Arne to drill and complete two horizontal underbalanced wells. -
Drilling Manager (Algeria)Hess Corporation Feb 2005 - Jan 2006New York, Ny, UsDrilling, Completions and Workover responsibility for exploration, appraisal and development wells in the Gassi El Agreb complex. Team had 2 drilling rigs and a snubbing (workover unit). -
Senior Drilling Engineer (Algeria)Hess Corporation Feb 2004 - Feb 2005New York, Ny, UsSDE/ Drilling Supt for TP129. Drilling and completing primarily Gassi and El Agreb exploration, appraisal and development wells. -
Australia/ Asia Engineering Supervisor, Drilling Co-Ordinator (Australia, Uk And Algeria)Bhp 1998 - 2004Melbourne, Victoria, Au -
Senior Well Engineer (Netherlands)Shell 1996 - 1998London, England, Gb -
Senior Drilling Engineer (Paris)Schlumberger Feb 1996 - Dec 1996Houston, Texas, Us -
Sde, Senior Dsv, Team Leader Goodwyn Erd (Australia)Woodside Energy 1992 - 1996Perth, Western Australia, Au -
Trainee De, Ops Eng, Sde, Night Supervisor (Central/ Southern North Sea And Wytch Farm)Bp 1987 - 1992London, England, Gb
Max Mclean Skills
Max Mclean Education Details
-
Strathclyde UniversityPetroleum Eng. -
Robert Gordons Institute Of TechnologyEngineering Technology
Frequently Asked Questions about Max Mclean
What company does Max Mclean work for?
Max Mclean works for Perth
What is Max Mclean's role at the current company?
Max Mclean's current role is Semi Retired.
What is Max Mclean's email address?
Max Mclean's email address is ma****@****ess.com
What schools did Max Mclean attend?
Max Mclean attended Strathclyde University, Robert Gordons Institute Of Technology.
What skills is Max Mclean known for?
Max Mclean has skills like Drilling, Deepwater, Offshore Drilling, Petroleum Engineering, Completions, Upstream, Subsea Engineering, Petroleum, Completion, Workover, Oil And Gas, Drilling Engineering.
Who are Max Mclean's colleagues?
Max Mclean's colleagues are Aspen Anderson, Melissa Ostle, Hamse Luke, Colleen Smith, Pamela Crawshaw, Tuli Kalobo, やまひろ.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial