Senior Project Engineer
1. PVC De-bottlenecking Project: Increase production capacity of PVC trains A/B by 40%. A new compressor, tank and pumps were added besides several equipment's were upgraded.2. Petrokemya polyethylene project: 800,000 tons per annum capacity new plant consisting of two trains.3. Construction of SPS/EPS warehouses (Zamil steel pre-engineered building): 6000 sq. meter new SPS and 2400 sq meter expansion of Class-I. Division-II air-conditioned EPS warehouse.4. New Maintenance Building… Show more 1. PVC De-bottlenecking Project: Increase production capacity of PVC trains A/B by 40%. A new compressor, tank and pumps were added besides several equipment's were upgraded.2. Petrokemya polyethylene project: 800,000 tons per annum capacity new plant consisting of two trains.3. Construction of SPS/EPS warehouses (Zamil steel pre-engineered building): 6000 sq. meter new SPS and 2400 sq meter expansion of Class-I. Division-II air-conditioned EPS warehouse.4. New Maintenance Building (1000 sq meter): Double storey building for managerial & supervisory staff.5. Petrokemya beach camp: 10,000 sq. meters facility comprising of meeting hall, sitting hall, dining hall, guard house and open area landscaping.6. Butane-I sphere: 3000 metric tones new sphere added for Number-2 Butene-I storage.7. Laying of 2.5 Km Sea Water Line (2m dia. FRP pipeline).8. Firewater pipeline in PK around 4Km.9. SFTC Building 1500 sq.m. Double storey framed building.10. Conveyor system at SADAF Salt Plant. 11. Ar-Razi Plant-I revamp project.12. Benzene mitigation project at Kemya.13. Security system upgrade at Ibn-sina.14. GAS – PHASE 5 Refurbishment.15. GAN/GOX pipeline to various SABIC Affiliates.16. Geo-technical investigations, survey & site development works for expansion projects.17. Cathodic Protection to Tanks & Underground Pipelines and Yanpet.18. Platforms for Packaging units, Utilities and Offsite at Yanpet.19. Blast resistance Maintenance building 20. Various Shut-down projects at SABIC Affiliates. Show less