Marcelo Donnard Santos B.E. Email & Phone Number
Who is Marcelo Donnard Santos B.E.? Overview
A concise factual answer block for searchers comparing this professional profile.
Marcelo Donnard Santos B.E. is listed as Project Manager at Phillips & Jordan, Inc., a with 60 employees, based in Winter Garden, Florida, United States. AeroLeads shows a matched LinkedIn profile for Marcelo Donnard Santos B.E..
Marcelo Donnard Santos B.E. previously worked as Project Manager at Comanco and Key Achievements at Comanco. Marcelo Donnard Santos B.E. holds Bachelor Of Engineering (B.E.), Civil Engineering Technology/Technician from Ufmg - Universidade Federal De Minas Gerais.
Email format at Phillips & Jordan, Inc.
This section adds company-level context without repeating Marcelo Donnard Santos B.E.'s masked contact details.
Review company-level records connected to Marcelo Donnard Santos B.E. before choosing the right outreach path.
About Marcelo Donnard Santos B.E.
ππππ ππππππππ πππππππ ππ ππππππ ππππππππβ’ Senior Operations & Engineering Management β’ P&L | Budget | Cost Control Management β’ Project & Construction Managementβ’ Strategy & Roadmap Planning | Execution β’ Leader | Team | Contractor Management β’ Procurement Management β’ Customer & Supplier Relationship Management β’ Constructability & Value Management β’ Project Plan | Blueprint Interpretationβ’ Unwarranted Cost Claim Management β’ Change Order Management | Prevention β’ Quality Assurance & Controlβ’ Pricing & Contract Negotiations | RFI | SOWs β’ Worksite Safety Management | Awareness β’ Risk Management | Mitigation πππππππ ππππ πππππ5S | ABC Curve | Balanced Scorecard | Bottleneck Analysis | Brainstorming Basics | C&E | Change Analysis Method | Check Sheet | Correlation | COV | Fault Tree Analysis | Fishbone Diagram | HAZOP | ISO 9001 | ISO 14001 | ISO 50001 | Lead Time | Pareto Chart | PDCA | Planned Maintenance | Predictive Maintenance | Preventive Maintenance | Process Mapping | Quality Maintenance | Reaction Plan | Risk Tree | Root Cause | Safety and Environment | Safe Start | Scatter Plot | Stakeholder Analysis | Stratification | Surveys Methods | Tagging Process | Task Training | TPM | Trainingπππππππππ ππππππAdobe Creative Cloud | ADP | Advanced Excel (Data Tables) | AgTek | Ariba | AutoCAD | AutoDesk Viewer | Bitdefender | CenterCard | ComCard | Coupa | Dropbox | DWG TrueView | GeoCaab | Google (Docs / Drive / Earth / Maps / Meet / Sheets / Translate) | HCSS (Dispatcher / Field / Forms / HeavyBid / HeavyJob / myField / Plans / Safety) | Lighting Alarm | Loom | MaaS360 | MS Office Suite | MS Project | MS Teams | New Holland FleetForce | Nitro Pro PDF | NOAA | OneDrive | Opera | Photoshop | PhotScan | Pixlr | Primavera | RingCentral | SAP Fieldglass | Sigem | Skype | StellarRepair | SurveyMonkey | Symantec | TeamViewer | Trainual | Trimble Viewpoint | TSYS Merchant Protection EZ | VPN | WebEx | ZipWhip | Zoom
Listed skills include Pdca, Ms Project, Dos, Autocad, and 9 others.
Marcelo Donnard Santos B.E.'s current company
Company context helps verify the profile and gives searchers a useful next step.
Marcelo Donnard Santos B.E. work experience
A career timeline built from the work history available for this profile.
Project Manager
πΆπππ π‘ππ’ππ‘πππ ππππππππππ‘ πΆππππππ¦ π ππππππππ§πππ ππ πππ£ππππππππ‘ππ πππ πππ£ππ ππππ π‘ππ’ππ‘πππβ’ Responsible for managing environmental construction and geosynthetics installation projects throughout Florida, working with clients in fertilizer, waste containment and management, energy generation, and water treatment facilities, including key clients Mosaic, OUC, Waste Management, and EcoSouth.β’ Manage the project development and execution for 44+ projects (6 projects concurrently), including landfill cell construction, cell closure, reject water pond liner replacement, and liner containment repairs at water treatment facilities, consistently meeting gross margins and completing projects on schedule.β’ Provide supervision, coaching and mentoring to a team comprised of (2) Assistant Project Managers, (2) Project Engineers, (2) General Superintendents, (4-5) Superintendents, and ~5 contractors per project mainly for surveying, stormwater containment measures, sodding and concrete structures.β’ Accountable for the project management from bid award to completion of environmental construction projects, including geosynthetics installation for properly isolating waste, processing and rejecting water, fuel, from the environment, and protecting the subgrade, air, and underground water.β’ Guide team on specification review estimations, set-up scheduling, materials take-offs, materials quote requests, procurement of materials, and subcontractor quotes.β’ Create and maintain a document control system, which included logging, tracking, and reporting for shop drawings and RFIs, and assisted with project buy-out and preparation of purchase orders and subcontracts.β’ Work with the superintendents on each project close-out, including compiling and reviewing project close-out specifications, warranty and waiver agreements, quality control documentation, as-built documentation, bond requirements, and operations manuals
Key Achievements
β’ Spearheaded project management for $26M worth of contract revenues and $10M on the current backlog, with positive gross margins and on-schedule completions β’ Achieved 161K hours (1 year and 8 months) without lost-time accidents in 40+ projects spread through (8) different counties in central Florida, involving a group of 120 employeesβ’ Waterproofed an area of 18.4M+square-feet with the installation of a geomembrane liner to protect the underground aquifer, the equivalent of 321 football fields and more than Disneyβs Magic Kingdom and Epcot areas combined
Site Operations Director
ππππππππππ‘ πππ βπππππππ ππ ππππ’π π‘ππππ πππ ππππππ πππππ’ππ‘π β’ Managed two operations within a 24/7 Mosaic Fertilizer plant with 500 employees, including the management of material movement and execution of 4 capital/construction projects valued at $50M total.β’ Directed a team comprised of (1) Site Superintendent, (1) Production Manager, (1) Planning Engineer, and (8) Field Foreman responsible for leading the plantβs total bulk material handling operations for fertilizer production processes and loading of finished products, and overseeing all residue generated by the production process ensuring it was stacked and loaded on client trucks.β’ Led project execution from inception to completion, including phosphogypsum stack construction projects: West Side Compartment C/D and West Slope of Compartment A/B Reactivation, East Side Compartment C/D and South Slope of Compartment A/B Reactivation, and East Slope of Compartment A-B Reactivation.β’ Guided and ensured using 5S throughout the operation, reducing operational and safety risks and preventing any accidents or recordable. β’ Implemented predictive and preventive maintenance processes to maintain the fleet of end loaders, excavators, and haul trucks, resulting in lower maintenance costs and increased overall equipment effectiveness.β’ Implemented KPIs for each area of management focused on safety, productivity, and cost controls, resulting in improved truck turn times, cost reductions, productivity, and safety performance.β’ Led continuous improvement initiatives with leading metrics, increasing effective communications during the project management process.β’ Collaborated with site leadership to manage employee performance, establish workplace standards, drive accountability, and uphold corporate core values amongst the team.
Key Achievements
β’ Oversaw 2 operations successfully handling an average of 700K tons of bulk material for fertilizer production and expedition, generating more than $2M/month of revenue on the (2) five-year agreements, totaling more than $130Mβ’ Implemented health/safety protocols during the Covid-19 outbreak, leading the (2) operations non-stop, maintaining a 0-transmission rate within the workplaceβ’ Developed stack design change that reduced the CapEx investment expenditure, increased the gypsum mining stock by 4.5M tons and, therefore, $62M of clientβs revenue in 2 years
Contractual Administration Manager - (1099) | 2014-2016 And (F/T) | 2013-2014
ππππππ π πππππ πππππππππππ π πππ£ππππ ππππππ‘πππ ππ π‘βπ βπππ£π¦ ππππ π‘ππ’ππ‘πππ, ππππππ, πππ πππ & πππ ππππ’π π‘ππππ β’ Led the negotiations and contract administration process for 6 EPC Oil & Gas projects (ranging from $72M to $220M), overseeing the cost performance, change orders, and claims throughout the design, supply, construction, and commission.β’ Prepared and analyzed contract FIDIC EPC requirements, contract deviations (time and cost), risk, special provisions, contract changes, and claims to ensure compliance with the project objectives.β’ Oversaw internal team resolution on changes related to labor/construction contracts, change orders, schedule changes, lack of performance, negotiation strategies, and contractor correspondence, which identified opportunities for better contract terms and improved relations with stakeholders.β’ Responsible for the closure of complex claims formulation, negotiations, and final settlements of major contract changes to improve the projectβs productivity and coordinated contract close-outs and managed audits of final contract deliverables to assess contractorsβ relationship with the project.β’ Managed and negotiated with EPC contractors and suppliers during the tender process to meet objectives related to scope, safety, cost, planning, delivery time, and quality, always maintaining contracts and administration of purchase orders.β’ Organized timely and frequent engagement with key cross-functional teams of engineers to ensure the projectβs schedules, budgets, and KPIs were met and reported teamsβ progress to the leadership.β’ Reviewed incurred charges on projects for missed changeovers and termination costs, including evaluating the original bid budget against deviations that occurred.
Key Achievements
β’ Coordinated with 2 Project Engineers and 2 Lawyers on the negotiation of contract closures with equipment and material vendors, including a lawsuit against a client for $201M and an arbitration procedure worth $172Mβ’ Spearheaded 6 projects in 2 major Oil & Gas processing plants that together were able to process 230K+ Crude Oil Barrels per day and 740M cubic feet of natural gas per dayβ’ Contractual and technical accompaniment of contractual administration processes for ongoing Energy projects $760M worth
Engineering & Procurement Manager
πΆπππ π‘ππ’ππ‘πππ πππ πππππ‘ππππππ π πππ£ππππ πππ πππ βπππ/ππππ βπππ πππππππππ , πππ πππ πππ ππππ‘πππππ , πππ πππ‘πππβππππππ πππππ‘π β’ Managed industrial construction contracts and procurement for EPC construction and assembly projects ranging from $100K to $178M for clients in the Oil & Gas, Energy and Mining public and private industries.β’ Responsible for leading cross-functional teams of full-time and contract employees, including Project Engineers, Designers, Surveyors, and Expeditors in the supplier shops, on various aspects of the project, including procurement and selection of suppliers and materials, logistics, issuance of licenses, analysis of engineering and construction solutions, contracting detail and basic engineering.β’ Accountable for contract administration, board implementation, and execution of multiple projects, including Ammonium Sulphate Plant Construction for a Nitrogen Fertilizer Factory (FAFEN-SE), Compression Stations of Juaruna and Coari for the Urucu-Manaus Gas Pipeline, and Caraguatatuba-TaubatΓ© Gas Pipeline GASTAU Section II.β’ Oversaw the design, bid, and management of projects for the company, acting as a management and technical interface to the client, identifying and selecting suppliers, monitoring project cash flow, and performing the consistency analysis of Design of Engineering.β’ Established expectations for engineers providing operational directives and monthly performance reports to monitor project and operational performance.β’ Worked closely with the client team to ensure the proper selection of vendors and EPC contractors to deliver the process design, mechanical and piping layouts, equipment package reviews, and instrumentation and control strategies.
Key Achievements
β’ Created and implemented a Project Cost Control System at a job site, providing expedited advice to the Board on projected income and expenses in more than 20 simultaneous projects, leading to $500K in cost savings initiativesβ’ Implemented and followed up on customer demands, resulting in Additive signatures averaging a 23% increase in contract valueβ’ Led the engineering management of an Ammonium Sulphate plant capable of producing up to 303K tons per year, coordinating 2 design teams in the US and Brazil and procurement of material and equipment in 4 different countries
Expediting Coordinator - Contracted Through Ecovap
β’ Expedited rotating equipment, all overseas manufactured equipment and instrumentation vendors for a delayed coker and a naphtha HDT plantsβ’ Oversaw process from detailed design up to site delivery, managing to maintain scheduleβ’ Project: Petrobras REVAP projects EPC2 - Delayed Coker Plant / EPC3 - Naphtha HDT Plant - SP - Brazil
Project Coordinator
β’ Coordinated engineering and procurement process on gas pipeline EPC contracts (+1.400km), interfacing with client and construction contractors and controlling and expedited vendors at shop and siteβ’ Coordinated custom clearance and inland logistics from ports to sites.β’ Project: Petrobras Malha Gas Pipeline: MPS1 (Campinas-Rio 28β/500km) β SP/RJ, MPN1 (Termopernambuco 16β/12km and Gasfor II 14β/400km) β PE/RN/CE, and MPN2 (CatΓΊ-Pilar 26β/440km, Aratu-CamaΓ§ari 14β/42km and Atalaia-Itaporanga 14β/29km) β BA/SE/AL β Brazil
Field Engineer
Project: Petrobras Guandu-Reduc II Water Supply Pipeline 32β/48km - RJ β BrazilMobilization team, designing site layouts, preparing sites and pipe distribution logistics, organizing and training C&A teams, including selection of personnel, sub-contractors, equipment and material suppliers. Project: Petrobras UPGN Pilar - Natural Gas Processing Plant - AL β Brazilβ’ Fieldwork for gas plant construction and assembly, supervising all disciplines, interfacing with client and the gas processing equipment supplier, Petrofac.β’ Project: Central Officeβ’ Proposal assembling works, including technical site visits, and design development control.Project: Imerys Rio Capim Caulin Slurry Pipeline 14β/159km - PA β Brazilβ’ Fieldwork for a pipeline on schedule construction and assembly in the Amazon Forest, leading a team of 100 workers on various fronts, along performing social interaction with local and indigenous community.
Trainne Engineer
β’ Planning and viability studies for improvement, reform and extension construction of SP-330 (Rodovia Anhanguera) and SP-348 (Rodovia dos Bandeirantes) highways pavement and infrastructure in SΓ£o Paulo state.
Marcelo Donnard Santos B.E. education
Frequently asked questions about Marcelo Donnard Santos B.E.
Quick answers generated from the profile data available on this page.
What company does Marcelo Donnard Santos B.E. work for?
Marcelo Donnard Santos B.E. works for Phillips & Jordan, Inc..
What is Marcelo Donnard Santos B.E.'s role at Phillips & Jordan, Inc.?
Marcelo Donnard Santos B.E. is listed as Project Manager at Phillips & Jordan, Inc..
Where is Marcelo Donnard Santos B.E. based?
Marcelo Donnard Santos B.E. is based in Winter Garden, Florida, United States while working with Phillips & Jordan, Inc..
What companies has Marcelo Donnard Santos B.E. worked for?
Marcelo Donnard Santos B.E. has worked for Phillips & Jordan, Inc., Comanco, Mgm Engineering & Industrial Operations, Fidens, and Gdk S/A.
How can I contact Marcelo Donnard Santos B.E.?
You can use AeroLeads to view verified contact signals for Marcelo Donnard Santos B.E. at Phillips & Jordan, Inc., including work email, phone, and LinkedIn data when available.
What schools did Marcelo Donnard Santos B.E. attend?
Marcelo Donnard Santos B.E. holds Bachelor Of Engineering (B.E.), Civil Engineering Technology/Technician from Ufmg - Universidade Federal De Minas Gerais.
What skills is Marcelo Donnard Santos B.E. known for?
Marcelo Donnard Santos B.E. is listed with skills including Pdca, Ms Project, Dos, Autocad, Project Engineering, Microsoft Excel, Petroleum, and English.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial