Mel Dow Email and Phone Number
Mel Dow work email
- Valid
- Valid
Mel Dow personal email
Oil & Gas professional with 33+ years industry senior management, project & technical experience working in offshore and onshore global Oil & Gas operations: conceptual feasibility, FEED, detailed design, commissioning, start-up, operations support, subsea, wells, production chemistry, offshore trouble-shooting, plant optimisation and de-bottlenecking.Mel is a Chartered Process Engineer & Fellow of the IChemE and has worked with Oil Operators, Engineering Consultants & Engineering Contractors on Projects and Assets around the World.Key Strengths1. Ability to provide Companies, Greenfield projects and existing Mature Assets with a full range of senior management, project, technical expertise and services to ensure safe, environmentally sound and economically viable production of hydrocarbons.2. Holistic approach to solving process problems, ensuring all potential root causes are identified/ explored rather than simply treating the symptoms. This leads to optimal project execution and more permanent solutions to operational difficulties and inherent inefficiencies.3. Ability to lead and drive management, technical & operations personnel in the pursuit of project completion and process optimisation. Expertise in the technical evaluation/ranking of potential ideas to enable screening of the best solution[s] for individual Companies/Assets.4. Extensive technical and practical hands-on knowledge of the key systems within the offshore/onshore Oil and Gas industry. This includes subsea processing and flow assurance, fluid separation, heavy oil, gas treatment/compression, PW treatment and LOF management strategies, seawater injection and PWRI.Key Areas Of experienceIn sequential order of the oil and gas offshore production cycle:1. Reservoir souring, PVT modeling & well test analysis.2. Subsea tie-back modelling, definition and Host platform topsides/facilities impact assessment.3. Project Design of onshore, fixed/floating Assets, from conceptual feasibility studies through FEED and into detailed engineering.4. PEER Review of Greenfield process flowschemes, equipment selection & design to ensure LOF Operations Assurance.5. Commissioning of subsea/topsides facilities.6. Operations support, plant optimization, process troubleshooting and de-bottlenecking7. Production Chemistry awareness, Safety, HAZOP studies and Environmental awareness.8. Field Development options evaluation & planning.9. Company Operation: Financial Budgets & Controls, Business Strategy, Project Management, Administration, Personnel supervision/mentoring and Technical Quality.
-
Founding Director And Co-Owner, Process ConsultantComamo LtdHillside, Gb -
Founding Director/Co-Owner, Process ConsultantComamo Ltd Feb 2016 - PresentHillside, Scotland, United KingdomTypical Projects in progress or already completed;• Provision of Technical Assurance services for BP Clair ESP project at the Shetland SVT MEOR plant and pipeline crossover into the SIRGE gas pipeline. LT Flare Impact Evaluation & Flow Assurance advisory activities.• Provision of Technical, Engineering & Environmental Advisory services for EnQuest Bressay & Bentley very heavy oil field developments. Evaluating options to convert EnQuest Producer FPSO and subsea tie-back to Kraken FPSO, ES & FDP preparations, carbon intensity minimisation & NSTA liaison.• Provision of Wells / Subsea Production Optimisation services for NEO Energy’s recently acquired North Sea Operated Assets; GP3 and Flyndre.• Provision of Technical Assurance services for Ancala Midstream Nitrogen Injection Facility upgrade project at the SAGE plant, St. Fergus.• Provision of Engineering Assurance services for Decipher Energy Orlando tie-back to CNRI NCP platform in UKCS.• Provision of process consultancy design services during NOV bid phases for various Petrobras FPSO Field Developments in Brazil.• Provision of Operations Process Technical Authority services to Bumi Armada’s Kraken FPSO.• Provision of Engineering Assurance services during conceptual & Select phases of Solsort / Hejre tie-backs to Hess South Arne platform in Denmark.• Provision of Heavy Oil design and operations experience during Design Review of Apache’s Corona tie-back to Beryl Alpha platform in UKCS.• Provision of Engineering Assurance services during design phase of DeNovo Energy’s Iguana gas project in Trinidad.• Provision of Concept and Basic Design phase process consultancy services for NOV’s HoneyBee TM650 Industrialised FPSO concept. -
Co-Founding Director/Co-Owner, Ceo, Engineering Manager, Process Ta, Principal ConsultantMaxoil Solutions Nov 2004 - Jan 2016Aberdeen, United Kingdom• Developed global multidiscipline technical consultancy providing specialist areas of expertise across the full lifecycle of a project/asset, in operations assurance, flow assurance, fluids separation, heavy oil, produced water management, sand and solids management, gas treatment and transport, production chemistry consultancy, chemical treatments and contaminants, process troubleshooting, advanced diagnostics, de-bottlenecking, technical awareness training and decommissioning.• Development and delivery of Business strategy for the Maxoil Group of Global companies.• Achieved global cumulative revenues across 11+ years of operation; split between UK - £22million, US - $17million, Norway – NOK14million.• Business Development of Maxoil companies to secure and build Client relationships to enable growth of Maxoil. Built up a global Client base of 94; split between Major Operators, Independent Operators, NOC’s and Engineering Contractors.• Engineering Manager, Project delivery and Process Technical Authority functions. Over 620 technical projects successfully delivered globally; ranging from £10,000 to £1million in scope and value.• Supervision, mentoring and personnel career development of Maxoil technical team in the UK. Technical consultant global head count of 45 at peak; split 50/50 between Process Engineers and Production Chemists.• Supervision of Maxoil Business Support functions dealing with Financial, Administration and HR responsibilities. Achieved ISO9001 for global companies. -
Principal ConsultantPrimas Oil & Gas Consultancy Ltd Jun 2001 - Oct 2004Ellon, Scotland, United KingdomTypical Projects completed;• Ops support for PGS/ Petrofac operated Northern Producer FPF and participation as HAZOP chairman for platform modifications and improvements.• Feasibility study for the upgrade of water injection facilities on the Northern Producer FPF. Offshore trials to assess Deaerator performance leading to specification of new injection pump.• Evaluation of underperformance in the BHP Billiton Douglas platform Nitrogen system. Extensive review of system documentation and P&ID’s with offshore trial to assess Nitrogen system performance.• Reservoir souring study performed for BP Kuwait/ KOC to evaluate the timing and level of souring in the North Kuwait oil fields and hence determine the impact on surface processing equipment and pipework.• Investigation and evaluation of existing poor performance and reliability in BP ETAP platform produced water re-injection system. Review of alternative technologies in conjunction with LOF produced water profiles to provide the optimum pumping configuration for reliable disposal of produced water.• Offshore health-check for BP ETAP to improve oil/ water separation and system stability. Review of separation and hydrocyclone performance highlighted several areas for improvement.• Flow assurance studies for various flowline configurations, cross-overs and subsea hot taps within the TFE operated Frigg UK-NOR gas lines and Oseberg/ Huldra flowline networks. • Review of CDS proposed inlet devices for separators on Woodside’s Goodwyn and North Rankine platforms to ensure satisfactory performance with higher gas throughput and a depressured operating scenario [Goodwyn]. Objective to either sanction proposed CDS devices, propose modifications or advise alternative separation devices.• Review of oil/water separation performance for processing flowschemes of Phases 1, 2 & 3 of the BP Azeri development.• Evaluation of subsea tie-back options to various Host platforms for a Confidential UKCS Client.
-
Consultant Process EngineerIgl Oil & Gas Consultants Jul 2003 - Apr 2004Aberdeen, Scotland, United KingdomTypical Projects completed;• Project underway to rank outstanding ChevronTexaco Captain engineering change proposals using IGL proprietary software, ProRank. This approach assesses the ‘value’ of each change proposal by evaluating any change in risk to personnel, environment and operations and a ranked list is produced to allow forward planning for technical resource and Asset CAPEX budget.• Feasibility studies performed to consider the impact of topsides de-sanding, cleaning and disposal equipment on the ChevronTexaco Erskine NUI and the Captain WPP platform.• Generic system capacity evaluation and de-bottlenecking study carried out to realise topsides processing ullage for future subsea tie-backs to BP Andrew.• Feasibility study carried out for the installation of lift gas compression facilities on Talisman’s Gyda platform.• Offshore review performed of the ConocoPhillips Viking IP air system with the evaluation of upgrade options to improve system reliability and availability. -
Principal Process EngineerAmerada Hess Energy Ltd Apr 2000 - Jul 2003Aberdeen, Scotland, United KingdomTypical Projects completed;• Ongoing study to rewheel Scott compressor(s) to primarily remove the current gas handling bottle-neck but also to check the economic feasibility of designing the rewheel for lower separator operating pressures. • Ongoing study into the potential for redeployment of AH001 and tieback of remaining reserves to existing infrastructure. Production benefits associated with subsea boosting options currently being evaluated.• Operations support and engineering development for Amerada Hess fixed and floating assets: Scott, AH001, Uisge Gorm FPSO and Hudson.• Implementation of Honeywell Robust Multi-variable Predictive Control Technology [RMPCT] to optimise Scott gas compression plant to minimise separator pressures during dips in SAGE pipeline pressure.• Engineering support to fast track Angus & East Telford subsea tiebacks from initial feasibility through detailed design to formulation of start-up procedures and offshore commissioning.• Tern/Hudson Gas Balance review to investigate the reasons for high intermittent flaring, fluctuating lift gas supply pressures and consequent instability in Hudson subsea production. • Participation in Tern/Hudson H2S workgroup to study the effects of Hudson reservoir souring and its potential impact on topsides equipment specification and platform zoning requirements.• AH001 produced water system review, in conjunction with Naremco.• PEER review of Brovig’s Crystal Ocean vessel to ensure vessel design and processing capability was suitable for EWT operations on the Chestnut field. -
Lead Process EngineerAker Oil & Gas Technology (Uk) Jul 1995 - Apr 2000Aberdeen, Scotland, United Kingdom(& McDermott Marine Construction Ltd. - Takeover by Aker)Typical Projects completed;• Front End Definition study of topside facilities for a proposed Navion FPSO located offshore Newfoundland on the Husky Oil South White Rose prospect.• Familiarisation of and Operations Support to PPC’s Pierce FPSO to ensure smooth operation and optimisation post commissioning.• Process technical input to an EPIC bid for a Seawater Injection platform for Occidental’s PS-1 Complex in Qatar.• HAZOP of existing systems on Occidental’s PS-1 Complex in Qatar.• Evaluation and detailed process design of major modifications to the Statoil Gullfaks C platform HP flare system to allow tie-back of subsea wells.• Detailed process design of the Kyle subsea tie-back to the Conoco/PGS Banff FPSO for Ranger Oil.• Process design and supervision of Gas Compression and TEG Regeneration Seller packages for the Conoco/PGS Banff FPSO.• Process evaluation of Esso Balder FPSO Marine systems.• Operations support to Occidental’s PS-1 Complex in Qatar.• Detailed process design of a Separation/Compression/Produced water facilities platform and process design/PIPESIM simulations for tie-in of gas lifted production flowlines to Occidental’s PS-1 Complex in Qatar.• Formulation of FRDs for Shell’s Tern platform, defining the operating envelope for equipment systems.• PIPESIM simulations for the detailed design of Shell’s Kingfisher subsea tie-back to Marathon’s North Brae platform.• Project Manager/Lead Discipline Engineer for a multi-discipline engineering team on a FEED Study for MEG Desalination facilities at the Amoco Bacton Terminal, including evaluation of MEG Desalination technologies.• Conceptual design of topside facilities for deep water SPAR buoy development off Sulawesi. Included process optimisation, PFD/UFD preparation, equipment sizing, weight/cost estimates.• Flare/blowdown studies on Amoco’s North Everest/Lomond platforms w.r.t. delayed depressurisation and equipment cooldown.
-
Process EngineerAmec Process And Energy Ltd Sep 1993 - Jul 1995Aberdeen, Scotland, United KingdomTypical Projects completed;• Review to check Beryl Bravo flare system capacity, including blowdown, tailpipe modelling, development of an hydraulic flare network model and evaluation of staged blowdown/relief flare cases.• Evaluation and design of topsides equipment modifications for Mobil's Nevis and Katrine subsea tie-backs to Beryl Alpha.• Workscope definition and equipment design of Mobil projects, e.g. Produced water handling and Drill cuttings injection systems.• Process engineering conceptual evaluation of Mobil's Eastern Area Development and BP's Western Area Development. -
Process EngineerBp Oil Grangemouth Refinery Ltd Apr 1993 - Sep 1993Grangemouth, Scotland, United Kingdom• Preparation of Pressure Systems study in accordance with HSE legislation.• Engineering support to BP Refinery operations, troubleshooting and investigative studies.
-
Process EngineerAltra Consultants Limited Oct 1992 - Apr 1993Aberdeen, Scotland, United KingdomTypical Projects completed;• Process calculations and Basis of Design preparation for processing Froy gas through Total's St. Fergus gas plant.• Reservoir fluid PVT modelling and flowline/topside simulations for various Lasmo subsea tie-backs to Marathon’s Brae infrastructure.• HP/LP interface reviews of Conoco's Theddlethorpe gas complex, including Viking, LOGGS, Pickerill and Caister terminals.• Review of and response to HAZID actions on Methanol and Condensate systems on Hamilton's Ravenspurn North platform. -
Reservoir Engineer / Offshore Process Engineer - Brae Bravo / Process EngineerMarathon Oil Exploration (U.K.) Ltd Jun 1990 - Oct 1992Aberdeen, Scotland, United KingdomReservoir Engineer• Study to best utilise North and East Brae platform compression capacity and Brae reservoir production to meet gas sales contracts.• Determination of spare field-wide system capacity to allow future third party tie-ins to the Brae infrastructure.• Extensive review and update of the PVT model describing East Brae gas condensate fluid behaviour.Process Engineer• Platform troubleshooting, optimisation, equipment selection and heat and mass balance studies. Process Engineering calculations.• HAZOP studies and Project Economics for equipment retrofits.• Monitoring and troubleshooting of glycol regeneration skid.• Freon inventory evaluation and monitoring. Offshore Process Engineer - Brae Bravo• Field Engineer assignment covering wellheads, separation, NGL, glycol, gas injection, power generation, utilities and the CCR.• Planned Maintenance Shutdown co-ordination of leak testing, purging and start up procedures.• Commissioning glycol/hydrocarbon separator to minimise glycol losses and improve hydrocarbon removal from TEG contactor.• Monitoring cooling medium system performance under design duty conditions, i.e. 4 x 25 MW injection compressor operation.• Plant trials to operate the glycol regeneration skid in solvent stripping mode (DRIZO process) as opposed to fuel gas stripping. -
Graduate StudentBp Chemicals Oct 1987 - Apr 1988Grangemouth, Scotland, United KingdomFinal year University project to design in detail a Butadiene Hydrogenation plant specified by and for intended use by BP.
-
Graduate StudentExxon Chemical Olefins Inc Jul 1987 - Sep 1987Mossmorran, FifeStudent Engineer carrying out a Cooling Tower Modification project at Exxon's Fife Ethylene Plant to improve Cooling Tower/Plant efficiency.
Mel Dow Skills
Mel Dow Education Details
-
Chemical Engineering
Frequently Asked Questions about Mel Dow
What company does Mel Dow work for?
Mel Dow works for Comamo Ltd
What is Mel Dow's role at the current company?
Mel Dow's current role is Founding Director and Co-Owner, Process Consultant.
What is Mel Dow's email address?
Mel Dow's email address is me****@****ons.com
What schools did Mel Dow attend?
Mel Dow attended Heriot-Watt University.
What skills is Mel Dow known for?
Mel Dow has skills like Upstream.
Not the Mel Dow you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial