Electrical Engineer
Current- Site Preperation, Erection, Install and Commisioning Genset KTA50G3, QSK45, KTA50G3+,Transformer 3.15 MVA,Switchgear 20KV, NET, HV cable, Control Cable at 45 MW Pesanggaran Site, 40 MW Paya Pasir site, 4.5MW Tembang site,12.5 MW Site Wetar, 8MW Tenau1 Site, 10MW Lombok Site, 12MW Bolok Site, 10MW Tenau2 Site, 5 MW site Tarakan, 2.5MW site Kaimana and 4.2MW site Saipem, 7 MW site Maumere- Start Up Genset,Switchgear and Transformer- Preventive Maintenance, Trouble Shooting Genset Gempac System control and PCC 3100 and Transformer.