Phase Iv Inspector, Shell Uslng Project
Current• Visually inspect modules, structures, spools and ship loose materials removed from the modules prior to shipment. • Confirm with Shell Quality Team Lead all ship loose materials are removed from the module, ensure ICP’s, Ship loose valves/PRV’s are properly packaged according to packaging specifications, for scope assigned to subcontractor and in accordance to design drawings. • Confirm all strapping and securement is completed per design securement drawings and in accordance with established safety standards. • Ensure that any cosmetic paint touchup or securement issues are correctly addressed prior to shipment. Perform final safety check and sign-off of load before shipment.