Michael Regan, P. Eng

Michael Regan, P. Eng Email and Phone Number

Engineering Chief, ARM - AESA Redpath Mining. Minera Yanacocha, Cajamarca, Peru @ Aesa Redpath Mining
Michael Regan, P. Eng's Location
Kirkland Lake, Ontario, Canada, Canada
About Michael Regan, P. Eng

Michael Regan, P. Eng is a Engineering Chief, ARM - AESA Redpath Mining. Minera Yanacocha, Cajamarca, Peru at Aesa Redpath Mining.

Michael Regan, P. Eng's Current Company Details
Aesa Redpath Mining

Aesa Redpath Mining

View
Engineering Chief, ARM - AESA Redpath Mining. Minera Yanacocha, Cajamarca, Peru
Michael Regan, P. Eng Work Experience Details
  • Aesa Redpath Mining
    Engineering Chief
    Aesa Redpath Mining Jan 2022 - Present
  • Redpath Mining
    Senior Engineer, Indonesia
    Redpath Mining Nov 2020 - Dec 2021
    North Bay, Ontario, Ca
  • Kirkland Lake Gold (Kl)
    Sr Mine Engineer
    Kirkland Lake Gold (Kl) Jun 2019 - Jul 2020
    Toronto, On, Ca
    -Reopening Holloway Mine from care and maintenance; remnant mining-Short term planning -Long term planning-Ventilation-Budget and schedule for 2020
  • Kirkland Lake Gold (Kl)
    Sr Mine Engineer
    Kirkland Lake Gold (Kl) Jan 2019 - May 2019
    Toronto, On, Ca
  • Kirkland Lake Gold (Kl)
    Senior Mine Engineer
    Kirkland Lake Gold (Kl) Nov 2017 - Dec 2018
    Toronto, On, Ca
  • Kirkland Lake Gold (Kl)
    Mine Engineer
    Kirkland Lake Gold (Kl) Dec 2013 - Nov 2017
    Toronto, On, Ca
    Mine Engineer December 2013-Present Long Term Ventilation Planning• Involved in future shaft ventilation• Developed concepts for different stages of shaft sinking tying into Macassa mine • Developed concepts for new vent raises in conjunction with a new production shaft• Looking a large scale blue sky ideas• Working with consultants for developing cooling plantsVentilation Increase • Increased ventilation underground to the physical limits of the openings (Ventsim)• Created a high pressure (up to 22” wg) system• Sought approval by management for budgeting ventilation increase Vent Reversal • Studied the entire mine ventilation system in detail; our ventilation intakes are not fully known or understood due to drawing from old workings • Performed tests to understand the natural ventilation pressure of the mine • Selected new boosting fans based on estimated natural ventilation pressure • Scheduled manpower and fan relocation • Led post-commissioning process after ventilation reversal was successfully completed Acting Chief Engineer October 2015-March 2016  Managed 22 employees within the engineering department  Stamped or signed all drive layouts and drill programs  Reviewed and signed month end report for both survey and accounting  Attended manager meetings & production meetings  Reviewed geology reserve packages  Involved with pre-feasibility project
  • Kirkland Lake Gold (Kl)
    Eit
    Kirkland Lake Gold (Kl) May 2010 - Dec 2013
    Toronto, On, Ca
    Short Term Mine Planner September 2013-September 2014  Designed mining layouts in both Promine and Amine  Optimized mining layouts to minimize waste development.  Designed construction plans and paste fill letter based on future mining Ventilation Lead: September 2012-September 2013  Calculated optimized blade angle on boosting fans  Performed vent changes throughout the mine (selected appropriate fans based on pressure and volume)  Designed vent schematic of the mine  Procurement of ventilation capital equipment  Dealt and addressed any vent issues underground January 2012-August 2012  Performed daily heat stress and volume readings underground  Issued vent directives when a problem would arise  Inspected all fan systems once week Shaft Services May 2011-December 2011  Created schedule for new conveyance  Organized and prioritized shaft related issues  Performed hands on work in the shaft Ground Control May 2010-April 2011  Monitored Seismic Activity using ESG software  Analyzed Micro seismic data with MS-RAP  Constructed 3D stress models with MAP 3D  Performed underground Inspections
  • Kirkland Lake Gold
    Summer Student (Underground Surveyor)
    Kirkland Lake Gold May 2008 - Aug 2008
    Toronto, On, Ca
    *Operated Leica Total Station*Operated CMS (Cavity Monitoring System)*3D Modeling using ProMine *Produced daily survey issues

Michael Regan, P. Eng Education Details

  • Laurentian University/Université Laurentienne
    Laurentian University/Université Laurentienne
    Mining
  • Laurentian University/Université Laurentienne
    Laurentian University/Université Laurentienne
    Mining

Frequently Asked Questions about Michael Regan, P. Eng

What company does Michael Regan, P. Eng work for?

Michael Regan, P. Eng works for Aesa Redpath Mining

What is Michael Regan, P. Eng's role at the current company?

Michael Regan, P. Eng's current role is Engineering Chief, ARM - AESA Redpath Mining. Minera Yanacocha, Cajamarca, Peru.

What schools did Michael Regan, P. Eng attend?

Michael Regan, P. Eng attended Laurentian University/université Laurentienne, Laurentian University/université Laurentienne.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.