Project Engineer-Highways
CurrentProject 1 : Sheik Zayed Highway improvement phase 1 -grade widening to three lane dual carriageway : Lift station construction works Project Value : 23.4 Million BHDClient : Ministry Of works Salmabad By pass and sheikh Zayed highway (urban Highway): Project Involves widening in the inner median and Outer section of 2 lane dual Carriage way to 3 lane dual carriage way spanning a length of 9.4 km Together where Live traffic is running Existing Road surface will be milled and regulated to The FDL with reconstruction done on outer and inner median .Median is refurbished with double sided Concrete barriers with Crash barriers on outer sides. It involves demolition of 4 Round abouts and transform it into signalised Junction with New traffic signal system. It also involves 14 kms of HDPE Drainage lane with gully’s catch pits and manholes ,4 kms ITS and scoots system for Traffic signal works, Road crossing ducts. Sign gantry, Signages ,Crash barriers ,asphalting Construction of lift station Project 2 : Proposed Janabiyah Highway (On going)Project Value :10 million BHDClient : Ministry of WorksConsultant :KEO International ConsultantJanabiya Highway Project(Urban Highway)-Ongoing : Project Involves Full Reconstruction of 4.5 km of existing 2 lane dual carriage way to 3 lanes Dual carriage way .Reconstruction includes Removal of existing asphalt , Laying of capillary layer, subgrade subbase road base and 3 layers of asphlat ,5 signalised junctions and 9 kms of drainage lane,All utilty Relocation and reinstatements, along with all required elements of highway