Mohammad Imtiyaz Email and Phone Number
hello Gentleman's"""my name is mohmmad Imtiyaz i have 8 years experience as a Document Controller Aramco & Non Aramco in Saudi Arabia.
China Petroleum Pipeline Engineering Co.,Ltd.
View- Employees:
- 475
-
Welding Inspector Aramco ApprovedChina Petroleum Pipeline Engineering Co.,Ltd. Oct 2024 - PresentEastern, Saudi Arabia -
Ndt CoordinatorChina Petroleum Pipeline Engineering Co.,Ltd. Dec 2023 - Dec 2024Dammam, Eastern, Saudi Arabia Knowledge of NDT Coordinator ( Welding QC Inspector Assistant) Thorough Knowledge of Quality Documentation Thorough knowledge of EPM (RFI, LBE NCR) operation. Coordination of Weld Repair & location marking from RT films Co-ordinating NDT work. Witnessed Procedure and Welder Qualification Witnessed validation of Welding Equipment inspection Knowledge of NDT Coordinator ( Welding QC Inspector Assistant) Thorough Knowledge of Quality Documentation Thorough knowledge of EPM (RFI, LBE NCR) operation. Coordination of Weld Repair & location marking from RT films Co-ordinating NDT work. Witnessed Procedure and Welder Qualification Witnessed validation of Welding Equipment inspection -
Qc Document ControllerChina Petroleum Pipeline Engineering Co.,Ltd. Aug 2021 - Dec 2024Saudi Arabia Project: North Gas Compression Pipeline Project (NGCP) Client: Saudi Aramco. Company: China Petroleum Pipeline Engineering Company Limited Job: Quality Document Controller From: 25th/August/2021 till Present.During my working period I am responsible to Prepare, Maintain & Handling allQA/QC-related documents (i.e. different work procedures, welding reports, NCR’sinternal & external, Monthly Quality Management reports, Weekly Quality Statusreports, RFI, and different certificates also as per necessary. Coordinate with QCDepartment RIFs and update Log Also Weekly Report and Monthly Report. During my working period, I am responsible to update all Engineering Drawingsincluding RED Line Drawings / As-Built Drawings (i.e. General Arrangement,Isometric, Civil, Electrical & Instrumentation) by maintaining different Logs. I am alsoresponsible to Prepare outgoing transmittal and outgoing letters all the departmentrelateddocuments submit to SAPMT & maintained all the incoming and outgoing All INCR raise, close, scan, and filling, and INCR & LBE Log update QTBM Log Update scan and filling Daily FIELD & SHOP Summery update Mechanical, Civil, Welding, Cp, Electrical, Coating, Electrical Mage All RFI, sUpload to Log Sheet and Close in EPM System. Weekly Report and Monthly Report for RFI, S LBE, INCR, Total. Electrical Loop instrument package ALL QC Record for SAP NUMBER AND SUBMIT TO ARAMCO GATE PASS ACCESS APPLY TO ARAMCO RTFI Assessments Update in Welding Summary PMI reports update and filling Welding Summary PT, MT, UT Reports update scan and filling Welding Summary Every day all EPM notification gives a reply, and all proactive and LBE sharein the group/supervisor & update in log CALIBRATION Log update and filling Coordinate with QC Department RIW, MTS, MIR Coordinator site and send the material to the site Maintain all documents & data entries about Coordinate the activities of Document Control, -
Project Document ControllerChina Petroleum Pipeline Engineering Co.,Ltd. Aug 2021 - Jun 2023Saudi Arabia Project: Onshore Maintain Potential Program (OMPP) -NA1&NA2 ZONE Client: Saudi Aramco. Company: China Petroleum Pipeline Engineering Company Limited Job: Project Document Controller From: 19th/August/2019 to 20th/July/2021During my working period I am responsible to Prepare, Maintain & Handling allQA/QC-related documents (i.e. different work procedures, welding reports, NCR’sinternal & external, Monthly Quality Management reports, Weekly Quality Statusreports, RFI, and different certificates also as per necessary. Coordinate with QCDepartment RIFs and update Log Also Weekly Report and Monthly Report. During my working period, I am responsible to update all Engineering Drawingsincluding RED Line Drawings / As-Built Drawings (i.e. General Arrangement,Isometric, Civil, Electrical & Instrumentation) by maintaining different Logs. I am alsoresponsible to Prepare outgoing transmittal and outgoing letters all the departmentrelateddocuments submit to SAPMT & maintained all the incoming and outgoing All INCR raise, close, scan, and filling, and INCR & LBE Log update QTBM Log Update scan and filling Daily FIELD & SHOP Summery update Mechanical, Civil, Welding, Cp, Electrical, Coating, Electrical Mage All RFI, sUpload to Log Sheet and Close in EPM System. Weekly Report and Monthly Report for RFI, S LBE, INCR, Total. Electrical Loop instrument package ALL QC Record for SAP NUMBER AND SUBMIT TO ARAMCO GATE PASS ACCESS APPLY TO ARAMCO RTFI Assessments Update in Welding Summary PMI reports update and filling Welding Summary PT, MT, UT Reports update scan and filling Welding Summary Every day all EPM notification gives a reply, and all proactive and LBE sharein the group/supervisor & update in log CALIBRATION Log update and filling Coordinate with QC Department RIW, MTS, MIR Coordinator site and send the material to the site Maintain all documents & data entries about -
Qc Document ControllerSaudi Binladin Group (Sbg) Jul 2017 - Jul 2019Jeddah, Makkah, Saudi ArabiaCoordinate with QC Department RIW, MTS, MIR Coordinator site and send the material to the site Maintain all documents & data entries about Coordinate the activities of Document Control, including distribution of documents,tracking, and reporting on document review progress. Maintain records of engineering documents and drawings in hard copies andelectronic files and monitor the revisions and approval status thereof. To maintain the record of all controlled documentation – issue, status, and location. Registering of internal and external documents. Maintenance of controlled documents registers Control all Manpower and take Daily Update from the site report
Frequently Asked Questions about Mohammad Imtiyaz
What company does Mohammad Imtiyaz work for?
Mohammad Imtiyaz works for China Petroleum Pipeline Engineering Co.,ltd.
What is Mohammad Imtiyaz's role at the current company?
Mohammad Imtiyaz's current role is welding inspector Aramco Approved at China Petroleum Pipeline Engineering Co.,Ltd./ Cswip 3.1 Saudi Aramco Approved.
Not the Mohammad Imtiyaz you were looking for?
-
1kadasa.com.sa
-
-
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial