Site Civil Engineer
Involves Earthworks, Internal Roads & Utility Lines.
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
Mohammad Jamil is listed as Site Civil Engineer at Dorsch International Consultants GmbH. From May 2012 to September 2018 based in Pakistan. AeroLeads shows a matched LinkedIn profile for Mohammad Jamil.
Mohammad Jamil previously worked as Site Civil Engineer at Dorsch International Consultants Gmbh and Site Civil Engineer at Dorsch International Consultants Gmbh. Mohammad Jamil holds Dae Civil, Civil Engineering from Gpi Haripur Hazara Pakistan.
Having over 30 years { 20 years in UAE & Qatar } working experience in construction of Civil works of Road highway and Bridge works,Earth work,Aggregate base course and Asphalt work including all ancillary works,Concrete,work,Surface water drainage,,Site development works,Water line,Sewerage line,Landscaping and Bridge work.
Listed skills include Civil Engineering, Road, Concrete, Bridge, and 17 others.
A career timeline built from the work history available for this profile.
Qatar Economic Zone 1 (Qez-1)
Involves Earthworks, Internal Roads & Utility Lines.
Cp-01/Cp-16
Involves Earthworks, Internal Roads & Utility Lines.
Lusail Development Primary Infrastructure Package Cp5B
ROAD TOTAL= 11.5 KMA1 & A2 4 LANE EACH WAYD2 & D3 2 LANE EACH WAYINTER SECTION 14 NOSUNDERPASS WAY 1018 M & 440 MUTILITY TUNNEL (1 CELL) 1800 M & (2 CELL) 1400 MUTILITY PIPE (POTABLE) 16583 MFOUL SEWER (5,010 MSTORM WATER 34,761 MIRRIGATION 17,085 MCABLE AND DUCT CABLE,ROAD LIGHTING,TRAFFIC SIGNAL,ELV & Q-TEL
Lusail Development Primary Infrastructure Package 3A Phase 2
6 BRIDGES : TOTAL LENGTH 951.5MCONCRETE BRIDGE: 4 NOS (561.5M)SUSPENSION BRIDGE : 2 NOS. (390M)BORED PIPE :384 EA (800MM DIA > 1,000MMREBAR : 7,300 TONS, STEEL :5,879 TONS( CONCRETE BRIDGES)1)BR#3: 3 SPANS (33.75M + 45M + 33.75M = 112.5M)2)BR#4 : 3 SPANS(33.75M + 45 M + 33.75M = 112.5M)3)BR#5 : 3 SPANS(37M + 45M + 37M = 119M)4)BR#7 : 5 SPANS(41.25M + 45M + 45M + 45M + 41.25M = 217.5M)(SUSPENSION BRIDGES)1)BR#8 : 3 SPANS(60M + 30M + 114M = 204M)2BR#9 : 3 SPANS(54M + 30M + 102M = 186M)
Abu Dhabi
Client : Department of Transport (DOT) Abu Dhabi, UAE. Duration : From 18 OCT 2011 to 17 may 2012Designation : Site Inspector.Project : Sheik Khalifa Interchange- (KPIZ)Cost : 600 million AED The work consists of Construction of 4nosBridges (post Tension Box Girder); 1. BridgeD0.1: Total Length-98m (2 span- Dual way ) (4 cell Box Girder) Max.span -49m Width -18.60m 2. BridgeD1.2: Total Length-139.6m (4 span-Dual way ) (8 cell Box Girder) Max.span -39.8m Width -33.25m 3. BridgeD1.3: Total Length-139.6m (4 span-single) (4 cell Box Girder) Max.span -39.8m Width -18.30m 4.BridgeD.1.4: Total Length-76.80m (2 span- Dual way ) (3 cell Box Girder) Max.span -39.70m Width -11.60m Underpass-D1.1: (single cell Box Type Voided slab) Total Length-62.40m Width -19.70m Construction of new 4 lane dual carriage way -4.5Km Widening of Existing 4 lane carriage way -7.8Km Alignments of Collector Distributor Roads (Service Road) Utility works like Electrical, surface drainage,Box culvert, Provisional works like land scaping, water, irrigation works Precast and Erection for MSE walls, concrete Crass barrier
Fujairah
Client : Ministry of Public Works (Dubai)Duration : From 15 July 2006 – 30 sep.2011Designation : Site Inspector.Project : Dubai – Fujairah Freeway, Contract No. 2Cost : 1,000,000,000.00 DhsThe project consists of the construction of a new east/west 3 lane per direction freeway linking Fujairah with the Northern Emirates and Abu Dhabi. The total length of Dubai – Fujairah Free way is approximately 45.40 Km.The work consists of Construction of new pipe and 4x4 box culverts (90,000cu.m concrete and 10,000 tons steel rebars), Camel underpasses channels, 3 nos Bridges (1 no 2-span 90m total length,1 no. single span 36m length and 1 no. 4 span 180m total length), Reinforced earth retaining walls, 13,000,000 cu.m of cutting (75% blasting gabro rock), 11,500,000 cu.m filling works, extensive drainage network of ditches and chutes, stone pitching works for side ditches and slope protection , gabion retaining walls, roadway lighting network, 20 km concrete barriers and guardrails, 130,000 cu.m of sub-base, 90,000 cu.m of wet mix macadam road base and 200,000 tons of bituminous macadam asphalt courses etc.
Qatar
Client : Ministry Of Municipal Affairs & Agriculture, State of QatarDuration : From 15th Feb.2003 to 31 July 2004Designation : QA / QC Engineer.Project : SALWA INTERCHANGEThis prestigious project worth of 164 million QR. Comprised a length of 1.4 km Interchange and Underpass along with a Round About at ground level.I was responsible for all civil works including earth works, pavements, utilities, waterlines 150 to 1200 mm dia. DI pipes, TSE irrigation line, HDPE pipes 150 to 560 mm dia, Surface water drainage 150 to 1000 mm dia. Clay pipes, Sewerage line 200 to 600 mm dia., Pressure testing & Backfilling manhole construction etc.
Al Ain Uae
Quick answers generated from the profile data available on this page.
Mohammad Jamil is listed as Site Civil Engineer at Dorsch International Consultants GmbH. From May 2012 to September 2018.
Mohammad Jamil is based in Pakistan.
Mohammad Jamil has worked for Dorsch International Consultants Gmbh, Dorsch Qatar, Mouchel, Dorsch Holding Gmbh - Abu Dhabi, and High-Point Rendel Limited.
You can use AeroLeads to view verified contact signals for Mohammad Jamil, including work email, phone, and LinkedIn data when available.
Mohammad Jamil holds Dae Civil, Civil Engineering from Gpi Haripur Hazara Pakistan.
Mohammad Jamil is listed with skills including Civil Engineering, Road, Concrete, Bridge, Drainage, Highways, Earthworks, and Construction.