Country-wide more then 16 years of telecommunication site Engineer experience in installation, testing and maintenance for Switching and Power equipment with Fixed and Mobile networks. Installation and supervision according to given standards, NSS/BSS Switching and Power equipment installation and troubleshooting Rectifier and UPS installation, making of battery bank, Power connection DC/AC, , Provide first level on call technical support to customer to maintain smooth and fault free functioning of commissioned network element. Dedicated, loyal, customer oriented person, Strong ability to initiate and accomplish results, Carry out multiple assignments concurrently and MS office skills.
-
Project EngineerUltra Electronics (Waseela - Integrated Ict Solutions & Services ) Apr 2014 - Mar 2015OmanInvolved in Tetra ISS GSR system implementation -
Quality Control SupervisorWajda International, Aug 2008 - Dec 2008Kuwait• Installation of BTS & MW• Pre-ATP of sites• Provide DT Support.• Commercially launch the sites with no service effecting alarms• Sites Survey.• Make sure delivery of equipment on sites before start of swap activity.• Timely escalate access issue if exists.• Check Pre & Post alarms of sites.• Get backup of TI equipment.• Installation & Commissioning of new BTS.• Cutover the site.• ATP with zero snag.• Make RN of dismantled equipment• Technical Site Survey Report (TSSR).• Installation & Commissioning of MW link.• Link alignment within required RSL.• Cutover• PAT
-
Project SupervisorWajda International Apr 2007 - Aug 2008DubaiTo provide Radio In-Building Network Planning Engineering Service to customers in 2G GSM / 3G W-CDMA implementation & assuring customer satisfaction with, but not limited to, the following work details:• Preparing Distributed Antenna System (DAS) Plan & Design for GSM/WCDMA Network, link & power budget calculation & Bill of Quantity arrangement• Active (LGC) / Passive DAS designs for large scale buildings• IBS (In Building Solution) Active and Passive sites Implementation and acceptance• Nokia Ultra BTS/NODE B , Node B(3812) & Microwave Radio/Transmission Implementation• Power One system (rectifier) Installation• Site Acquisition, Validation 2G/3G (Greenfield, Rooftop and IBS)• Sites Quality and Standards Assurance• Site’s documentation (TSSR/FSSR) and BOQ preparation• VSWR Testing (RF Cables)• Technical Teams management• Acceptance visits with vendor / Operator representatives. • Co-ordination with Project manager and Client
-
Team LeaderWajda International, Pakistan Nov 2006 - Mar 2007Pakistan• Nokia Ultra Site BTS (2G) Configuration and Troubleshooting• Nokia Microwave Radio Link Commissioning and Integration• Expansion of network (installation of DCS 1800)• Media clearance for O&M link from BSC/Hub site to end sites• Patching on exchange terminals, making cross connections on each hop• Capacity up gradation for RRI cards on hub sites• Power one rectifier installation, alarm patching and testing• Acceptance visits with vendor / Operator representatives• Co-ordination with Project Manager• Trouble shooting for quality alarms• VSWR Testing (RF Cables)
-
Team LeaderWajda International, Kuwait Feb 2005 - Oct 2006Kuwait• IBS (In Building Solution) Passive sites Implementation and acceptance.• Nokia Ultra BTS/NODE B, Node B (3812) & Microwave Radio/Transmission Implementation.• Power one system (rectifier) Installation.• Site Acquisition, Validation 2G/3G (Greenfield, Rooftop and IBS)• Sites Quality and Standards Assurance• Site’s documentation (TSSR/FSSR) and BOQ preparation• VSWR Testing (RF Cables)• Technical Teams management• Acceptance visits with vendor / Operator representatives. • Co-ordination with Project manager and Client
-
Team LeaderWajda International, Bahrain Apr 2004 - Feb 2005Bahrain• IBS (In Building Solution) Passive sites Implementation and acceptance.• Nokia Ultra BTS/NODE B, Node B (3812) & Microwave Radio/Transmission Implementation.• Power one system (rectifier) Installation.• Site Acquisition, Validation 2G/3G (Greenfield, Rooftop and IBS)• Sites Quality and Standards Assurance• Site’s documentation (TSSR/FSSR) and BOQ preparation• VSWR Testing (RF Cables)• Technical Teams management• Acceptance visits with vendor / Operator representatives. • Co-ordination with Project manager and Client
-
Senior TechnicianWajda International, Kuwait Mar 2003 - Apr 2004Kuwait• Checking and tracing the fault in different types of electronics equipment.• Resolves the problems in such circuits like ATS panels, AMF Panels.• Installation and commissioning of fire alarm system.
Frequently Asked Questions about Muhammad Akram Muhammad
What is Muhammad Akram Muhammad's role at the current company?
Muhammad Akram Muhammad's current role is Senior IBS Implemention Engineer FTK Project at Inteltec Emirates.
Not the Muhammad Akram Muhammad you were looking for?
-
Muhammad Farooq Muhammad akram
Owner At Green Bangla Mobile ShopAbu Dhabi Emirate, United Arab Emirates -
-
-
Muhammad Imran Muhammad Akram
Sr. Civil Design Engineer | Structural Engineer | Dewa Approved Civil Design Engineer/Coordinator | Hv SubstationsDubai, United Arab Emirates
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial