Structural Engineer-In-Training
Current• Working as a structural consultant at North Tarrant Infrastructure at Fort Worth, TX. Assisting Senior Structural and Transportation Project Engineers in North Tarrant Express project-3A construction of 6.5 miles of I-35W from north of I-30 to north of I-820 main lanes, general purpose lane, managed toll lanes and frontage lane, it is a $1.6 Billion project.• It includes construction of 16 major bridges, 665000 SY of the deck, 75, 00 LF of Beams and 22 Steel girders.• Performed structural analysis of the superstructure of the bridge and designed the horizontal layout and vertical deducts using TxDOT BGS software and spreadsheets. Prepared bridge engineering drawings using Microstation and GEOPAK.• Performed Bridge structural analysis and design using AASHTO LRFD specifications, TxDOT Bridge Design Manual, TxDOT Bridge Detailing Manual, TxDOT Bridge Standard Drawings. • Conducted site visits and performed Design Change’s for construction issue and performed analysis, design, hand calculations, and detailing of bridge elements. Prepared Notice of Design Change, Design Change Request, RFI documents/package, and coordinated with document control manager, construction manager, and project engineers.• Responded to the TxDOT comment’s and designed retaining wall for global stability and local stability, performed calculations and checks for sliding, overturning, bearing, and designed stem, heel and toe of retaining wall.