Sis Engineer
Current● Worked on various types of control cabinets: Managed power-up procedures and conductedloop checks for hardware components to ensure functionality and reliability. Review ofwork procedures and product specifications.● Collaborated with customers, internal teams, and stakeholders: Led the design,implementation, and execution of FAT, Integrated Factory Acceptance Test (IFAT), andSite Acceptance Test (SAT) for DCS/ESD projects.● Report progress and technical problems to Lead Engineers / Engineering Manager.● Performing detailed System and Application Software engineering, design, assembly andtesting of the control system as per the Customer requirements.● Coordination with Document Controller for Control of Project documentation and QCEngineer for Inspection and Testing related activities.● Coordination with Lead Project Engineer for technical interface.● Created detailed project documentation: Developed Bill of Materials (BOM), SystemControl Specifications (SCS), Wiring Diagrams (WD), and acceptance test documents(FAT, SAT).● Managed project communications and stakeholder engagement: Prepared comprehensiveproject status reports for both internal and external use to maintain transparency andalignment.● Aramco Projects I worked on:1- Marjan package 12&14.2- Jafurah Package-1 , PWIS and GCP’s.