Muhammad A. Email and Phone Number
Analytical, resourceful and result-oriented Petroleum Engineer with 9 years of experience in Field Development Plan, Reservoir Management and Surveillance, Production Enhancement, Production Optimization and Well Intervention.
Ping Petroleum Limited
View- Website:
- pingpetroleum.com
- Employees:
- 19
-
New Ventures Team LeadPing Petroleum Limited Nov 2021 - Present• Performed well-by-well review for 18 wells for a mature asset Offshore Thailand. Performed well modelling to evaluate ESP performance and estimate reliability by comparing with theoretical pump curves. Proposed OPEX forecast to replace ESP and identified 3 optimization opportunities with potential gain of 400 bopd.• Prepared Hall plot and OIW trend to evaluate water injection and water separation system performance.• Developed reactivation proposal for 6 oil wells for a 7-years idle platform. Identified new technology to rectify CCP-SCP communication issues and 4 optimization opportunities with potential gain of 330 bopd.• Led submission of successful bid proposals for 2 Small Field Assets PSC in Malaysia. Performed multi-disciplinary roles (subsurface, wells, facilities, commercial) to develop techno-commercial bid proposal. Developed well models for oil producers, gas producers, gas injectors and generate production profile for commercial evaluation. Proposed suitable production system to process crude, extract condensate and re-inject lean gas. -
Senior Petroleum EngineerPing Petroleum Limited Nov 2021 - Present• Performed Gas Lift design with PROSPER for Avalon development subsea wells to meet target rate of 15,000 blpd per well while considering changing parameters during well life-cycle and gas supply limitation.• Performed ESP design with PROSPER as alternative artificial lift for Avalon subsea wells to maintain 9,000 bopd per well throughout field life. Both gas lift and ESP designed were included in Avalon FDP submission.• Participated in Anasuria Cluster subsea Gas Lift Valve Change shareholder’s review and Intervene Well on Paper exercise (IWOP). Project approved and successfully implemented. -
Guntong Asset Reservoir Surveillance Engineer Team LeadExxonmobil Jan 2021 - Nov 2021• Directly monitored performance of 30 oil producers, 3 gas producers and 4 gas injectors wells from 2 fields (Guntong West and Palas) with primary (gas cap and aquifer drive) and secondary recovery (gas injections).• Lead 2 reservoir surveillance engineers to monitor performance of 60 oil producers, 20 gas producers, 10 water injectors and 4 WAG injectors wells from 3 fields (Guntong East, Tabu, Telok) with combination of primary (aquifer and depletion drive), secondary (waterflood) and tertiary recovery (WAG).• Performed reserves assessment for Year-End-Reserves reporting and ARPR to host government. Justified additional reserves of 0.94 MMSTB and Reserves Replacement Ratio (RRR) of 171% for Proved Reserves.• Performed detail Asset Opportunity Workshop (AOW) review and identified 20+ opportunities with potential incremental reserves of 2.0 MMSTB and build-up of 2,900 bopd.• Increased field gas sales by 5% at $0 (FOC) by optimizing Reservoir Management Plan (RMP) operation.• Analyzed well test results, surface pressure, Gas injection to production ratio, Voidage Replacement Ratio (VRR), downhole pressure trend, multi-rate test and diagnostic plots to optimize withdrawals and oil recovery.• Collaborated with Petrophysicist to interpret cased-hole log for reservoir surveillance and monitoring.• Performed simple economic evaluation using break-even time, UEC and AVP to prioritize quick gain projects.• Developed and executed Guntong West and Palas 2021 production enhancement campaign (9 wells with gas lift optimization, thru-tubing perforation, cased-hole log) and delivered 50% higher than expected oil volume.• Developed cement packer proposals to add-perf and increase oil production for 2022 Wellwork Campaign.• Performed PROSPER well modelling using Karakas-Tariq and Cinco / Martin Bronz skin model to determine benefits of increasing perf efficiency via re-perf and add-perf to reduce partial penetration skin. -
Asset & Production Engineering Support For Gas Cap Blow Down FdpExxonmobil Dec 2020 - Aug 2021• Collaborated with Wells Engineer to determine sand control strategy based on field historical sand production, critical drawdown pressure plot and predicted well operating envelope.• Engaged with Global Material SME and determined corrosion rate based on CO2 partial pressure, water chemistry and well operating temperature. Proposed 13Cr for tubing material due to significant wall loss.• Accelerated 1st Gas of Guntong Gas Cap Blow Down at minimal cost by tying temporary CS flowline to header of donor wells (idle). Initiative also delivered cost savings by optimizing design of permanent flowline. -
Long Term Gas PlannerExxonmobil Nov 2019 - Jan 2021• Generate ExxonMobil Malaysia long-term gas production forecast to meet market demand, contractual obligation and maximize economic value while acquiring management, partner and government approval.• Prioritized various capex-intensive projects based on PVP/PVI, PVP/PVS, PV8, DCFR and AVP.• Optimized gas production by prioritizing high condensate reservoirs and strong aquifer drive reservoirs to maximize near-term value while maximizing gas recovery.• Collaborated with gas fields Production Engineer and reviewed the tanks, wells (VLP-IPR, well test matching, well uptime) and pipeline-facilities models prior to integrating it into ExxonMobil Malaysia gas network model. -
Jerneh Redevelopment Fdp Team Lead (Cum. Reservoir & Production Engineer)Exxonmobil May 2019 - Jan 2021Kuala Lumpur, Federal Territory Of Kuala Lumpur, Malaysia• Led Jerneh Redevelopment FDP team (5 engineers) for maturation of 5 workover and 2 infill wells program.• Led North Gas Opportunity Generation group (2 engineers) managing 4 gas fields and ~50 gas producers.• Performed reserves assessment for Year-End-Reserves reporting. Justified to technical authority additional reserves of 100 BSCF with Reserves Replacement Ratio (RRR) of 200%.• Performed multi-tank model analysis with static model support from Geologist to justify reservoir connectivity, deliver cost saving by suspending infill wells proposals and migrate 60 BSCF recoverable gas from Contingent Resources to Developed Reserves.• Evaluated project commerciality and wells incremental value using standard economic parameters: PVP/PVI, PV8, DCFR, UDC and AVP.• Collaborated with Petrophysicist to interpret cased-hole log for reservoir surveillance and monitoring.• Interpreted pressure build-up and multi-rate test.• Performed well modelling to determine well deliverability and suitable gun size and charge type to perforate cement packer via thru-tubing. Justified to management to perform double-perf and successfully delivered double than expected production rate despite producing with skin through a thru-tubing gravel pack.• Developed Jerneh 2020 production enhancement campaign (8 wells with sand clean-out, cement packer, thru-tubing gravel pack, cased-hole log) and delivered 20% higher than expected gas rate.• Optimized 4 workover wells to non-rig program by leveraging cost-effective technology and reduced 80% of workover program cost while successfully increased field production by 25%.• Performed mini full-field review and identified 20+ opportunities comprised of cement packer, thru-tubing gravel pack, add-perf, water shut-off, sand clean-out and others with potential gas build-up of 250 MMscfd.• Delivered 10 mscfd by restoring a 10-years idle well at $0 (FOC) by analyzing echometer results and trend. -
Petroleum EngineerDialog Group Berhad May 2016 - Apr 2019Kuala Lumpur, Malaysia• Directly monitored performance of 20 oil producer, 2 gas producer, 1 dumpflood and 1 gas injector wells from 3 sub-fields with combination of gas cap drive, aquifer drive and natural depletion.• Performed reserves assessment as part of host government Annual Reporting of Petroleum Resource (ARPR).• Proposed and implemented 2 highly profitable secondary recovery projects with minimal investment.(1) First natural water dump-flood in Malaysia with incremental Recovery Factor of 10%.(2) Gas lift conversion to Gas injection project with incremental Recovery Factor of 15%• Increased reservoir recovery by 6% by perforating the original gas cap to chase the migrated oil column.• Delivered 1,000 bopd at $0 (FOC) through pressure transient analysis and optimized well interference effect.• Performed material balance forecast to acquire host government approval to revise and waive the RMP limit.• Generated long-term production forecast for annual AFE and WP&B approval exercise.• Performed economic evaluation using P/I, NPV and IRR to determine incremental value of quick gain jobs. -
Production TechnologistDialog Group Berhad May 2013 - Apr 2016Kuala Lumpur, Malaysia• Designed 2 horizontal wells completions with dual string Oil Producer and Gas Producer function (OP/GP) and with Open-hole Stand-alone Screen (SAS), Inflow Control Device (ICD) completion.• Design 4 wells completion for gas FDP project and 3 wells completion for oil FDP project.• Matured and acquired host government approvals for 13 production enhancement, idle well restoration and logging proposals comprised of chemical and mechanical water shut-off, add-perf and cement packer.• Proposed and acquired host government approval for stimulation proposals in 3 wells with different methods: re-perf, gas gun and hydraulic pulsing. Stimulation successfully implemented and improved well performance.• Performed well and network modelling to monitor well performance and generate optimization proposal.• Led offshore infill well unloading and testing program with 300 bopd incremental oil. -
Process EngineerAudubon Malaysia Sdn. Bhd. Sep 2012 - May 2013Provide conceptual processing system and estimated cost for project management. Prepare project proposals, technical reports, design basis memorandum and project execution plan.
Muhammad A. Education Details
-
2Nd Class Upper -
1St Class
Frequently Asked Questions about Muhammad A.
What company does Muhammad A. work for?
Muhammad A. works for Ping Petroleum Limited
What is Muhammad A.'s role at the current company?
Muhammad A.'s current role is Lead Petroleum Engineer and New Ventures Team Lead.
What schools did Muhammad A. attend?
Muhammad A. attended Universiti Teknologi Petronas, Universiti Teknologi Malaysia.
Who are Muhammad A.'s colleagues?
Muhammad A.'s colleagues are Charles Taylor, Mathias Varming, Euan Duncan Mrics, Michael Barrett, Logan Yeo, Roy Phillips, Ahmad Hafeez Hazizi Uzer.
Not the Muhammad A. you were looking for?
-
Muhammad A
Software Engineer (Full Stack) | React Typescript & JavaFederal Territory Of Kuala Lumpur, Malaysia -
Muhammad Sollehhuddin
Bandar Baru Bangi -
Muhammad Harith A Kadir
Wp. Kuala Lumpur -
-
Muhammad Hafiz A Rashid
Chartered Accountant Enterpreneur, Trainer And Business CoachTerengganu, Malaysia1gmail.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial