Muhammad Azim

Muhammad Azim Email and Phone Number

Senior Technician at Axis Technology @ Axis Technology
nashik, maharashtra, india
Muhammad Azim's Location
Kuantan, Pahang, Malaysia, Malaysia
About Muhammad Azim

Active and hardworking and punctual in my work and activities. Committed and responsible in handling any task at hand. An active team player and also reliable to lead. More than 4 years EPCIC/EPC experiences in design and construction management for various Oil & Gas telecommunication projects with Local/International Clients.Actively Involved in Telecommunications EPC/EPCIC projects with Main Contractor MMHE, Technip FMC, Sapura Energy, Brooke Dockyard Engineering Works and successfully delivered Projects to end user Petronas Cari Gali, Murphy Oil, Cari Gali Hess and Shell (M). My strength performing project implementation during the Project phase which includes acceptance test (FAT, SAT) to deliver successfully to Clients. Familiar with Petronas carigali standards and compliance

Muhammad Azim's Current Company Details
Axis Technology

Axis Technology

View
Senior Technician at Axis Technology
nashik, maharashtra, india
Employees:
3
Muhammad Azim Work Experience Details
  • Axis Technology
    Technician
    Axis Technology Aug 2018 - Present
    Bandar Baru Bangi, Selangor, Malaysia
    1.Project: Lemongrass Project (BASF PETRONAS)- EPCC for Telecom Package (CCTV, Radio, Access Card, Lan & Pa System)a)Supervise and responsible to coordinate sub-contractor work progress.b)Prepare Permit-To-Work (PTW) and Coordinate reports for Construction Supervisor. c)Responsible for PTW Permits status (open and closed).d)Conduct Quality control of the installation for the telecommunication equipment. e)Prepare Checklist according to project equipment and record Punch-list… Show more 1.Project: Lemongrass Project (BASF PETRONAS)- EPCC for Telecom Package (CCTV, Radio, Access Card, Lan & Pa System)a)Supervise and responsible to coordinate sub-contractor work progress.b)Prepare Permit-To-Work (PTW) and Coordinate reports for Construction Supervisor. c)Responsible for PTW Permits status (open and closed).d)Conduct Quality control of the installation for the telecommunication equipment. e)Prepare Checklist according to project equipment and record Punch-list item.2.EPCC of Pengerang Deepwater Terminal 2 (PDT2) (Tank Terminal – petroleum) For Dialog Plant Services Snd Bhd. (Hotline System)a)Perform Installation including internal termination and cable laying.b)Perform Installation including internal termination and fiber laying.c)Perform Pre-Commissioning and Troubleshooting.d)Perform site acceptant test according to client requirement. e)Conduct punch clearance activities within specific time. Show less
  • Axis Technology
    Senior Technician
    Axis Technology Aug 2018 - Present
    Bandar Baru Bangi, Selangor, Malaysia
    1.Maintenance for telecom System at Carigali Hessa)Arrange and coordinate with the Service & Maintenance Manager the timely mobilization (and de-mobilization) of personnel, tools, and material to project sites.b)Co-ordinate and delegate the servicing and repairs process.c)Prepare time sheets for engineer and technician for client’s representative approval.d)Involves in projects, preventive / corrective maintenance, & in-house upgrade projects experiences.2.Rectification Work… Show more 1.Maintenance for telecom System at Carigali Hessa)Arrange and coordinate with the Service & Maintenance Manager the timely mobilization (and de-mobilization) of personnel, tools, and material to project sites.b)Co-ordinate and delegate the servicing and repairs process.c)Prepare time sheets for engineer and technician for client’s representative approval.d)Involves in projects, preventive / corrective maintenance, & in-house upgrade projects experiences.2.Rectification Work for DMR, Beacon, Time Server For PTTEPa)Perform Installation including internal termination and cable laying.b)Perform Pre-Commissioning and Troubleshooting.c)Perform site acceptant test according to client requirement.d)Prepare Checklist according to project equipment and record Punch-list item.Conduct punch clearance activities within specific time. 3.Project: Solar Photovoltaic Energy Power Plant – Gurun, Jasin, Merchang (Scada Hardware, Network System, CCTV and Weather Monitoring System)a)Perform Installation including internal termination and cable laying.b)Perform Pre-Commissioning and Troubleshooting.c)Perform site acceptant test according to client requirement. d)Conduct Quality control of the installation for the telecommunication equipment. e)Prepare Checklist according to project equipment and record Punch-list item.f)Conduct punch clearance activities within specific time. Show less
  • Aworldtec Engineering Sdn. Bhd.
    Warehouse Operator
    Aworldtec Engineering Sdn. Bhd. Jun 2022 - May 2023
    Kuantan, Pahang, Malaysia
    a)Perform visual inspection and quality check for ISO tank /Road Tanker prior to loading / unloading, ensure safety requirement following as per the loading checklistb)Perform post loading / unloading activities prior to release the ISO tank / Road Tankerc)Support pre-filling activities i.e. preparation of empty drums / IBCs, removal of plastic drum cover, removal of strap, de-dusting of empty drums, empty drum quality checks, pallet condition physical check, labels preparation and… Show more a)Perform visual inspection and quality check for ISO tank /Road Tanker prior to loading / unloading, ensure safety requirement following as per the loading checklistb)Perform post loading / unloading activities prior to release the ISO tank / Road Tankerc)Support pre-filling activities i.e. preparation of empty drums / IBCs, removal of plastic drum cover, removal of strap, de-dusting of empty drums, empty drum quality checks, pallet condition physical check, labels preparation and printing, labels pasting and ensure the right position of the empty drums on the conveyor.d)Perform quality check for box container readiness and final packaging condition before stuffing. The requirements stated on the stuffing checklist must be followed including strict adherence to assigned batches and labelling guidelines. No defect of packaging such as torn labels, dented drums etc. and report immediately for any non-compliance.e)Perform stuffing filled drums / IBCs into containers/conventional trucks with ensuring proper cargo securing. Fill up all checklist associated to operational activities for quality compliances and traceabilityf)Handle loading and unloading of packed raw materials and auxiliary chemicals from a truck / box container using a forklift or other lifting equipment.g)Storage of the packed raw materials and auxiliary chemicals to the designated storage area (racking / floor storage) based on the standard operating procedure and strict adherence to the product segregation rule and stacking guidelines. Show less

Muhammad Azim Education Details

  • Politeknik Sultan Haji Ahmad Shah Pahang
    Politeknik Sultan Haji Ahmad Shah Pahang
    Mechanical Engineering

Frequently Asked Questions about Muhammad Azim

What company does Muhammad Azim work for?

Muhammad Azim works for Axis Technology

What is Muhammad Azim's role at the current company?

Muhammad Azim's current role is Senior Technician at Axis Technology.

What schools did Muhammad Azim attend?

Muhammad Azim attended Politeknik Sultan Haji Ahmad Shah Pahang.

Who are Muhammad Azim's colleagues?

Muhammad Azim's colleagues are Adithya Gourla, Jignesh Dole.

Not the Muhammad Azim you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.