Chief Surveyor
Current380/132 KV Samtah PV & 380/132KV Al Derb PV Substation for 600 MW Soler Energy System & 380KV Overhead Transmission Line .
Please complete the CAPTCHA to continue
@alfanar.com
✓
LinkedIn matched
A concise factual answer block for searchers comparing this professional profile.
Muhammad Haroon Awan is listed as CHIEF SURVEYOR at Alfanar Projects, based in Jazan Region, Saudi Arabia. AeroLeads shows a work email signal at alfanar.com and a matched LinkedIn profile for Muhammad Haroon Awan.
Muhammad Haroon Awan previously worked as Land Surveyor at Alfanar Projects and Land Surveyor at Alfanar Construction. Muhammad Haroon Awan holds Bachelor Of Arts (Ba), Economics & Political Science, A from University Of Sargodha.
This section adds company-level context without repeating Muhammad Haroon Awan's masked contact details.
AeroLeads found 1 current-domain work email signal for Muhammad Haroon Awan. Compare company email patterns before reaching out.
worked 3years in terna sa engineering company, Sharja,United Arab Emirates.Since Dec2011 I am working alfanar construction.Recent i am working PE-237 380/132KV BSP Substation,PE-222 380kv DRPC Substation ,PE-230 380kv extention project ,wadi al dawasir Previous worked as a senior surveyor at the project hhr 3,hhr 4 and GIL and 380KV Under Ground Cable in Jeddah.The Haramain High Speed Rail project is a 444 kilometers (276 mi) high speed inter-city Rail transport system under construction in Saudi Arabia. It will link the Muslim holy cities of Medina and Mecca via King Abdullah Economic City, Rabigh, Jeddah and King Abdulaziz International Airport. It will connect with the national network at Jeddah. The rail line is planned to provide a safe and comfortable transport in 320 kilometers per hour (200 mph) electric trains. Construction started in March 2009 and planned to be finished in 2013 for phase1 package 1(Civil Works). The railway is expected to carry three million passengers a year, including many Hajj and Umrah pilgrims, helping to relieve traffic congestion on the roads. The double-track line will be electrified and the design speed is 320 kilometers per hour (200 mph). Trains will run in service at 320 kilometers per hour (200 mph), and travelling the 78 kilometers (48 mi) between Jeddah and Mecca will take less than half an hour, while the 410 kilometers (250 mi) between Jeddah and Medina will take about 2 hours. The track, rolling stock and stations are designed to handle the temperatures ranging from 0 °C (32 °F) to 50 °C (122 °F). The 6•79 billion riyal (US$ 1.8 billion) design and construction contract for Phase I Package 1 – Civil Works for the project was awarded in March 2009 to Al Rajhi Alliance, which comprises Al Swailem Company (MASCO), China Railway Construction Corporation (CRCC), Al Arrab Contracting Company Ltd,. Client: Saudi Railway Organization (SRO) Consultants: Dar Al Handasa Consultants, Scott Wilson Co Ltd (Project Management
Listed skills include Civil Engineering, Construction Management, Construction, Microsoft Office, and 23 others.
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
Jizan, Saudi Arabia
380/132 KV Samtah PV & 380/132KV Al Derb PV Substation for 600 MW Soler Energy System & 380KV Overhead Transmission Line .
Najran, Saudi Arabia
DRPC STATION NAJRAN UNIVERSITY ,380/132 KV SUBSTATION ALBAHA & INSTALLATION OF REACTORS & HYBRID GIS WADI DAWASIR
Ahsa, Eastern, Saudi Arabia
115 & 13.8kv Substations & Infrastructure work . GOSP 7,8,9,10, UTHMANIA, SOUTH GHAWAR FIELD.Clinet: Saudi Aramco
Abha, Asir Region, Saudi Arabia
Asir power plant, Abha & sharurah power plant( Project Crude Oil Conversion from Distillate Oil of Existing GT Units).
Al-’Awali, Makkah Region, Saudi Arabia
Govt.compound 110 / 13.8 KV substation
Jizan, Saudi Arabia
(1)132 / 13.8 KV JIZAN CITY CENTER SUBSTAION (2)EXTENSION OF AL HISMA 132 KV SUBTATION (3) 132 KV AL NIMAS SUBSTATION
Rabigh, Makkah, Saudi Arabia
(1) 380 & 110 KV PETRO RABIGH SUBSTATION
Rabigh, Makkah, Saudi Arabia
6 Substation of 380KV & 33 KV for Harmain HighSpeed Rail between 2 Holly City Makkah & Madina .
Sharjah Emirate, United Arab Emirates
Al Rayyan complex(High Rise Buildings)Al Nahda SharjaMaterial Recycle Factory (Sajja Industrial Area)
Activities and Societies: APPLIED MATHEMATICS , APPLIED PYSICS ,APPLIED CHEMISTRY ,APPLIED CONSTRUCTION , SURVEYING ,CIVIL DRAFTING.
Quick answers generated from the profile data available on this page.
Muhammad Haroon Awan works for Alfanar Projects.
Muhammad Haroon Awan is listed as CHIEF SURVEYOR at Alfanar Projects.
AeroLeads has found 1 work email signal at @alfanar.com for Muhammad Haroon Awan at Alfanar Projects.
Muhammad Haroon Awan is based in Jazan Region, Saudi Arabia while working with Alfanar Projects.
Muhammad Haroon Awan has worked for Alfanar Projects, Alfanar Construction, and Terna S.A..
You can use AeroLeads to view verified contact signals for Muhammad Haroon Awan at Alfanar Projects, including work email, phone, and LinkedIn data when available.
Muhammad Haroon Awan holds Bachelor Of Arts (Ba), Economics & Political Science, A from University Of Sargodha.
Muhammad Haroon Awan is listed with skills including Civil Engineering, Construction Management, Construction, Microsoft Office, Project Planning, Negotiation, Contract Management, and Road.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial Search contactsCheck these profiles if this is not the Muhammad Haroon Awan you were looking for.