Assistant Manager (500 & 220Kv Transmission Line Construction)
CurrentThe initial step involves proposing a route for the transmission line, a process that demands meticulous evaluation to ensure optimal efficiency and minimal environmental impact. Subsequently, detailed surveys are conducted using Total Station and RTK equipment to assess the terrain and address potential challenges along the way. Following the survey, a.