Assistant Project Manager
• Managed operation of RO Plants and EDI Units, ensuring optimal performance.• Proficiently oversaw projects valued between 0.75-1.2 million USD, ensuring cost-effectiveness and high quality.• Expedited production of 5 wells within a record duration of 48 hours each.• Monitored system performance, identifying and rectifying equipment deficiencies to support operations.• Maintained and updated Existing Operation and Lab SOPs, alongside regular and troubleshooting reports.• Planned, managed, and controlled a maintenance budget of 0.55 million USD across multiple plants.• Executed modification and automation of RO Plant, installation, and commissioning of Water and Lab equipment.• Conducted CIP of 4 RO Plants and replacement of Filter media and Rubber Lining of 2 Sand Filters.• Performed technical reviews, prepared preventive and corrective maintenance plans for instrumentation equipment.• Tracked timely completion of maintenance work orders, reducing backlogs from 30% to 5%.• Managed engineering changes, maintenance workflow, and equipment documentation using MAXIMO.• Received Spot Recognition Award for successfully managing and leading Covid-19 vaccination campaign.• Led the designing and construction of a 2.5 Million USD UNICEF project, resulting in cost-saving.• Developed control and process philosophies for projects, ensuring compliance with international standards.• Conducted water lab testing and chemical dosage control, including calibration of lab equipment.• Implemented optimized benchmarks for man-hours per drawings, reducing engineering cost from 5% to 3%.