Senior Mechanical Engineer
Abha, 'Asir Saudi Arabia
SHAROURAH (PM-193), JAZAN AND ASEER ( PM194) and Power Plants – Sharourah, Abha & Jazan (Southern Region)CONVERSION CRUDE OIL OPERATION FROM DISTILLATE OIL OF EXISTING GAS TURBINES UNITS GE MS5001PA (Sharourah PP) GE MS7001EA AT JAZAN & ASEER POWER PLANTThis Scope of Work is on LSTK (Lump Sum Turn Key) basis and the Technical Specifications have been developed to establish the criteria on which the engineering design, its review, procurement, quality and project management, manufacturing, inspection & acceptance, supply and transportation of materials and equipment; installation, erection and construction, site inspection & acceptance, testing and commissioning; on-load testing; start-up, and reliability testing, and putting into service.• The objective of the PROJECT is to Convert Sharourah PP, Jazan Power Plant and Aseer Power Plant existing GE MS7001EA Gas Turbines Units to operate on Light Arabian Crude Oil as Main operating fuel from Distillate fuel oil, however distillate fuel oil operation will remain for startup and shutdown. • Modification work for Fuel unloading Stations, • Modification work of existing Fuel Oil Tanks and piping arrangement system• Installation work for Fuel Additive Bulk, transfer & Forwarding pumps, Supply pipeline system etc.• Installation work of main equipment like Crude Oil Transfer pump (COTP), Crude forwarding pumps, Crude transfer pumps, crude forwarding heaters, Fuel selection skids.• Compressor and turbine water wash skids for crude oil operation.• Taking care of HVAC ducting fabrication, installation and erection along with PACU installation.• Installation of Fire-Fighting systems including Hydrants, Water deluge and foam system, water Sprinklers system, installation of Fire Alarm & FM200 Fire Suppression systems.• Installation of Plumbing system, Smoke purging fans, Supply & Ventilation fans, pumps etc.• Monitoring project BOQ, Design approval, equipment selection, procurement and balance work to complete.