Additional Assistant Engineer
India
• Prepared more than 75 designs of check dam, including AutoCAD drawings, and estimates as a team member.• Prepared specifications and reports for contract documents/tenders, And records of drawings as team member.• Prepared and sent more than 100 contract documents/tenders for approval to higher office.• Prepared more than 700 estimates of canals, structures, roads, and buildings for public works and supervised work progress, and prepared bills of works. • Prepared more than 1000 bills of construction work done by the contractors and submitted to higher office for approval.• Planned and supervised works related to the construction and rehabilitation of roads, canals, hydraulic structures, and buildings.• Evaluated the performance of the multidisciplinary contractor’s team and reviewed deadline requirements for the completion of the project.• Coordinated with contractors and subordinate field staff for execution of works and seeing that projects were completed on time and as per specifications of work.• Attended meetings and discussed project details with clients, contractors, asset owners, and stakeholders• Worked closely with process engineers for follow-up and evaluation, and presented reports on trial materials according to designated schedules• Performed drafting according to specifications; ensured compliance with all project QA procedures and requirements• Submitted nos of bills of work done by the contractor and maintained accounts of works.• Surveyed, Investigated, planned, and submitted 2 Minor irrigation dams proposal.• Controlled and maintained the Dakor Distributary canal network and achieved more than 75% area covered under irrigation.