I am a highly motivated person with a good technical background willing to assume responsibilities, complete assignments in a timely manner and be held accountable for results. Major paths of my performance are safety, quality and schedule. Have a good ability for adoption, training and learning. Able to work in a multicultural environment.Experienced in LV & HV cables’ pulling, dressing, and glanding termination & testing. Heat tracing, ladder racks & cable trays installation, switchboards, distribution board, junction box inspection, maintenance & troubleshooting of excitation system, synchronization circuits, electrical protection, UPS, Static Frequency Converter, control circuits of SF6 & vacuum circuit breakers.
Scandens Pharmaceutical Industries
-
Electrical EngineerScandens Pharmaceutical Industries Jul 2024 - PresentBaku
-
Electrical & Instrumentation SupervisorIntertek. Socar Haor Modernization & Reconstruction Project Jan 2023 - Jul 2024
-
Qa/Qc Electrical & Instrument InspectorTecnicas Reunidas, Socar Haor Modernization & Reconstruction Project Feb 2021 - Dec 2022Baku, Azerbaijan -
Electrical EngineerSiemens. Energy Management Division, Siemens Ag Austria Sep 2018 - Feb 2021 -
Qc Senior Electrical InspectorSocar Haor Modernization & Reconstruction Project Apr 2018 - Sep 2018Control the work activities in accordance with approved drawing plans, work procedure and project’s specifications requirements.Review of all electrical & instrumentation drawings related to scope of project work.Perform routine inspection as per RFI, ITP, Project specifications & approved drawings.Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures.Ensuring “Safety Permit” while working on energized area prior for inspection.Handled the Inspections of installation, testing & commissioning of various capacities of 6/0.4 KV power transformers, switchgears, current transformer, voltage transformer. Inspections of installation, testing & commissioning of LV Motors and Bus ductInspections of MV/LV power, control and communication cables installation, testing and commissioning. Inspections of installation, testing & commissioning of small power distribution, lighting system, battery bank & UPS.Inspections of installation, testing plant earthing & lightning protection system.Perform inspection of cable trench before laying the cables and back-filling after laying the cables.Inspection of various types of cable trays and conduit system.Inspection of electrical equipment to be used at site; after delivery; and after installationCertification of electrical instruments, cables, equipment’sHVAC system Motor Run Tests and certification.Ensured that all calibrated equipment used within calibration validity dates.
-
Qa/Qc Senior Electrical & Instrument InspectorAmec-Tekfen-Azfen Consortium (Operated By Bp) Shah Deniz 2 Project Jan 2015 - Sep 2017Baku, Azerbaijan• Control the work activities in accordance with approved drawing plans, work procedure and project’s specifications requirements.• Review of all electrical & instrumentation drawings related to scope of project work.• Perform routine inspection as per RFI, ITP, Project specifications & approved drawings.• Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures.• Raising NCR violated against specification. Suggested for correct action follow up closely and closing the NCR.• Inspection of Enclosures (IP, Ex, Temp & Gas group) • Ensuring “Safety Permit” while working on energized area prior for inspection.• Handled the Inspections of installation, testing & commissioning of various capacities of 11/3 KV, 11/0.4 KV power transformers, switchgears, current transformer, voltage transformer. • Inspections of installation, testing & commissioning of MV/LV Motors and Bus duct• Inspections of HV/MV/LV power, control and communication cables installation, testing and commissioning. • Inspections of installation, testing & commissioning of small power distribution, lighting system, battery bank & UPS.• Inspection of instruments like pressure transmitters, flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid valves.• Inspection of plant fire & gas alarm system(flame, gas, heat, smoke detectors) , instrument local panels, control panels and junction boxes• Inspection of communication (PAGA) system• Inspections of installation, testing of earthing & lightning protection system.• Inspection of electrical, instrument and telecommunication equipment to be used at site; after delivery; and after installation.• Certification of electrical instruments, cables, equipments.• Completion of system check before punching• Ensured that all calibrated equipment used within calibration validity dates.
-
Qa/Qc Electrical & Instrument InspectorAzfen J.V. Production Yard Upgrade Project Dec 2013 - Dec 2014Baku, AzerbaijanControl the work activities in accordance with approved drawing plans, work procedure and project’s specifications requirements.Review of all electrical & instrumentation drawings related to scope of project work.Perform routine inspection as per RFI, ITP, Project specifications & approved drawings.Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures.Ensuring “Safety Permit” while working on energized area prior for inspection.Handled the Inspections of installation, testing & commissioning of various capacities of 35/11 KV, 35/6 KV, 11/0.4 KV, 6/0.4 KV power transformers, switchgears, current transformer, voltage transformer. Inspections of installation, testing & commissioning of MV/LV Motors and Bus ductInspections of HV/MV/LV power, control and communication cables installation, testing and commissioning. Inspections of installation, testing & commissioning of small power distribution, lighting system, battery bank & UPS.Inspections of installation, testing plant earthing & lightning protection system.Perform inspection of cable trench before laying the cables and back-filling after laying the cables.Inspection of various types of cable trays and conduit system.Inspection of electrical equipment to be used at site; after delivery; and after installationCertification of electrical instruments, cables, equipmentsHVAC system Motor Run Tests and certification.Ensured that all calibrated equipment used within calibration validity dates.
-
Qa/Qc Electrical & Instrument InspectorAmec-Tekfen-Azfen Consortium (Operated By Bp) Cop Project May 2011 - Oct 2013Baku, AzerbaijanControl the work activities in accordance with approved drawing plans, work procedure and project’s specifications requirements.Review of all electrical & instrumentation drawings related to scope of project work.Perform routine inspection as per RFI, ITP, Project specifications & approved drawings.Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures.Raising NCR violated against specification. Suggested for correct action follow up closely and closing the NCR.Inspection of Enclosures (IP, Ex, Temp & Gas group) Ensuring “Safety Permit” while working on energized area prior for inspection.Handled the Inspections of installation, testing & commissioning of various capacities of 11/3 KV, 11/0.4 KV, 11/0.72 KV, power transformers, switchgears, current transformer, voltage transformer. Inspections of installation, testing & commissioning of MV/LV Motors and Bus ductInspections of HV/MV/LV power, control and communication cables installation, testing and commissioning. Inspections of installation, testing & commissioning of small power distribution, lighting system, battery bank & UPS.Inspection of instruments like pressure transmitters, flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid valves, pressure control valves.Inspection of plant fire & gas alarm system(flame, gas, heat, smoke detectors) , instrument local panels, control panels, cabinets, and junction boxesInspection of communication (PAGA) systemInspections of installation, testing of earthing & lightning protection system.Certification of electrical instruments, cables, equipmentsHVAC system Motor Run Tests and certification.Completion of system check before punchingEnsured that all calibrated equipment used within calibration validity dates.
-
Chief Power EngineerAzmeco Azerbaijan Methanol Company Aug 2009 - May 2011Baku, AzerbaijanControl the work activities in accordance with approved drawing plans, work procedure and project’s specifications requirements.Review of all electrical & instrumentation drawings related to scope of project work.Review and check reports from ECP contractorWitness equipment installations on siteProgress reportingInstallation, testing & commissioning of various capacities of 35/6 KV, 6/0.4 KV power transformers, switchgears, current transformer, voltage transformer. Installation, testing & commissioning of MV/LV Motors and Bus ductInstallation, testing and commissioning of HV/MV/LV power, control and communication cables. Installation, testing & commissioning of small power distribution, lighting system, battery bank & UPS.Installation, testing of plant earthing & lightning protection system.Perform inspection of cable trench before laying the cables and back-filling after laying the cables.Installation of various types of cable trays and conduit system.Installation, testing of Cathodic Protection for Tanks, Pipes, Vessels.Inspection and control of electrical equipment to be used at site; after delivery; and after installationCertification of electrical instruments, cables, equipmentsResponsibility for electrical maintenance at site -
Chief Power EngineerGeneral Construction Company, Kazakh Cement Plant Project (Client) Feb 2009 - Aug 2009Baku, AzerbaijanReview project documentationReview and check reports from ECP contractorWitness equipment installations on siteProgress reporting -
Electrical EngineerAkkord Inshaat-Sanaye Ojsc, Kazakh Cement Plant Project (Contractor) Aug 2008 - Feb 2009Baku, AzerbaijanReview project documentationReview and check reports from ECP contractorWitness equipment installations on siteProgress reporting -
Electrical SupervisorAmec-Tekfen-Azfen Consortium (Operated By Bp) Dwg Project, Offshore Aug 2007 - Feb 2008Deep Water Gunashli Platform, AzerbaijanMaterial control & Electrical installation ( LV & HV cables pulling, dressing and to gland, termination & testing. Heat tracing, ladder racks & cable trays installation) during Hook Up & Commissioning Phase Of the Deep Water Gunashli Platform
-
Electrical InspectorAmec-Tekfen-Azfen Consortium (Operated By Bp) Dwg Project Feb 2007 - Aug 2007Baku, AzerbaijanDocument control according to AIOC QA/QC proceduresInspection and control of electrical work at siteInspection and control of electrical equipment to be used at site; after delivery; and after installationInspection and testing of cables that are installed at siteCertification of electrical instruments, cables, equipmentsHVAC system Motor Run Tests and certification.Completion of system check before punching
-
Electrical ForemanAmec-Tekfen-Azfen Consortium (Operated By Bp) Dwg Project Aug 2006 - Feb 2007Baku, AzerbaijanResponsible for group of Electricians & leadermen for glanding & termination in construction department. LV & HV cables’ pulling, dressing, and glanding termination & testing. Heat tracing, ladder racks & cable trays installation
-
Electrical Protection & Automation EngineerAzerenerji Jsc Jan 2000 - Aug 2006Baku, AzerbaijanBaku Power PlantMaintenance & troubleshooting of excitation system, synchronization circuits, electrical protection, UPS, Static Frequency converter & control circuits of SF6 & vacuum circuit breakers.Running analysis on the system after major faults using software (REG 216) to identify cause.
Mushviq Rafiyev Skills
Mushviq Rafiyev Education Details
-
Azerbaijan State Oil AcademyElectro Mechanics Engineer
Frequently Asked Questions about Mushviq Rafiyev
What company does Mushviq Rafiyev work for?
Mushviq Rafiyev works for Scandens Pharmaceutical Industries
What is Mushviq Rafiyev's role at the current company?
Mushviq Rafiyev's current role is Electrical & Instrumentation Supervisor at Intertek.
What schools did Mushviq Rafiyev attend?
Mushviq Rafiyev attended Azerbaijan State Oil Academy.
What skills is Mushviq Rafiyev known for?
Mushviq Rafiyev has skills like Electrical Engineering, Power Plants, Electrical Protection And Automation, Oil/gas, Petrochemical, Cement Plant, Inspection, Hazardous Areas, Offshore Construction, Electricity, Completion, Refinery.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial