Electrical Engineer
Current Identifying the project requirements and constraints Taking part in the project planning and scheduling Preparing of the construction Plan, defining the construction procedures, the logistics, the scheduling of activities, the tools and methodology for the control of activities Taking part in the project review meetings, to make sure that the construction requirements have been duly complied with Taking part of responsible with PM in the preparation of the execution plan Ensuring the preparation and verification of the Purchase Requisitions and of the Technical Evaluations Keeping both cost estimates and works schedules Apply and follow-up on permits as required Defining personnel mobilization Do the billings and other related documentsSummary of Major Projects:1.Project: PR#3007-MM Phase 02aClient: QNBNDuration: Ongoing, Dec 2023 to July 2024Position: Project Engineer/ RO coordinator (PTW) Description: laying new ducts, building JRC and cable pulling.2.Project: GTC/930/2019 – Pilot cable repair workClient: KahramaaDuration: Feb-2021 to Feb-2024Position: Project EngineerDescription: Repaired faulty pilot cables along with 11 kV network, including surveying, marking locations, applying for permits, reinstating as per standards, and submitting as-built drawings for updating in GIS.3.Project: Lusail Light Railway Transport System (LRT)Main Contractor: ALSTOMDuration: June 2017 to Dec 2020Position: Site EngineerDescription: Managed pulling and termination of 33kV, pilot, and control cables (fiber and copper) spanning around 200km. Also, supervised installation of raised floors and cable trays/supports in LPS and TPS rooms across 23 stations.