Nafis M Email and Phone Number
Motivated and dynamic person with analytical thinking, problem solving and strong communication skill. Experienced in leadership and organization.Able to work in team as well as individually. Consistently delivers results that meet or exceed expectation. Always keen on learning new things, developing self and others.
Pt Patra Badak Arun Solusi
View- Website:
- pbasolusi.com
- Employees:
- 267
-
Terminal Bahan Bakar Minyak (Tbbm) ProjectPt Patra Badak Arun Solusi Feb 2020 - PresentBau-Bau, Southeast Sulawesi, IndonesiaBau-Bau TBBM Project is gasoline handling and distribution project, this project is held by Directorate Logistic, Supply Chain & Infrastructure and VP Reliability & Project Development , as a Mitra Kerja (MK) in Project Management Fuel Facilities (PMFF) I have responsibility to review process engineering and commissioning deliverable document from contractor/EPC to ensure the design is meet with project specification.RESPONSIBILITY :1. Review Basic Engineering Design Data (BEDD).2. Review Process Flow Diagram (PFD) and Heat Mass Balance (HMB).3. Review Piping & Instrument Diagram (P&ID).4. Review Process Data Sheet, i.e., PSV Sizing, Tank Sizing, Pump Sizing, PT, TT, FT, etc.5. Review Cause/Effect Diagram & Hydraulic simulation.6. Hazardous & Operability Study/Workshop. -
Refinery Development Master Plan (Rdmp) Balikpapan ProjectPt. Rekayasa Industri Mar 2019 - Jan 2020Balikpapan, East Kalimantan, IndonesiaAs a Process Engineer / Commissioning Engineer RESPONSIBILITY :1. Develop commissioning and start-up procedure.2. Prepare readiness commissioning per subsystem.3. Develop performance test procedure.4. Develop Piping & Instrument Diagram (P&ID) and Process Flow Diagram (PFD).5. Develop Heat Mass Balance (HMB).6. Develop Hydraulic Simulation.7. Develop Process Data Sheet i.e., Pump Sizing, Tank Sizing, PT, FT, TT, LT, Line Sizing, etc. -
Lpg Tank Pulau Layang ProjectPt. Rekayasa Industri Nov 2018 - Mar 2019Plaju, Palembang, South Sumatera, IndonesiaAs a commissioning leader I have to conduct mechanical team, electrical team and instrument team to complete all preparation base on process sequence. Commissioning leader should be able to prepare a commissioning & start-up procedure and schedule base on work sequence. -
Banggai Ammonia Project ( Pau )Pt. Rekayasa Industri Jul 2017 - Nov 2018Banggai, Central SulawesiAs a Commissioning EngineerBasically the priority of my job is to make sure the system in the Plant ready for start up. Commissioning engineer have responsibility to prepare equipment and the auxiliary support for completion of system. Commissioning contains some dicipline such as mechanical, electrical, instrument and process. As a commissioning engineer I have to conduct mechanical team, electrical team and instrument team to complete all preparation base on process sequence. Commissioning engineer should be able to prepare a schedule base on work sequence.RESPONSIBILITY :1. Planning and execution commissioning system/subsystem in plant. (Sea water intake subsystem, Chlorination subsystem, Desalination Subsystem (Sea water ultra filtration, Sea water reverse osmosis, Brackish water reverse osmosis), Mixed bed polisher water subsystem, Boiler feed water subsystem, Natural gas fired boiler subsystem, Medium pressure steam turbine generator subsystem, Plant air / Instrument air subsystem, Closed cooling water subsystem, Gas engine generator / Dual fuel engine generator subsystem, Nitrogen generation subsystem, Ammonia storage and Ammonia loading arm subsystem.2. Prepare documentation of Application For Inspection for completeness of commissioning activities.3. Prepare work permit and job safety analysis for commissioning activities4. Perform coordination between department Electrical, Mechanical and Instrument Team for testing equipment in plant5. Monitoring progress pre-commissioning to Progress commissioning.6. Planning for schedule commissioning activity7. Support mechanical running test in conjunction with Vendor. 8. Supporting plant operation for plant commissioning activity -
Reactivation Ammonia PlantPt. Rekayasa Industri Feb 2017 - Jul 2017Lhokseumawe, North AcehAs a Commissioning EngineerRESPONSIBILITY :1. Define system/subsystem wise ammonia plant.2. Mechanical Running Test equipment for performance evaluation.3. HTRI simulation for measuring Heat Exchanger capacity.4. Perform coordination between department Electrical, Mechanical and Instrument Team for testing equipment in plant5. Monitoring progress repair equipment to progress pre-commissioning.6. Planning for schedule commissioning activity7. Support utility Commissioning in conjunction with ammonia commissioning. 8. Supporting plant operation for plant commissioning activity -
Lahendong Unit 5&6 Geothermal Power ProjectPt. Rekayasa Industri Dec 2014 - Feb 2017Manado Area, North Sulawesi, IndonesiaAs a Process Engineer and a Commissioning EngineerRESPONSIBILITY :1. Check BEDD based on ITB (Client Requirement) and Contractual clarification.2. Check Utility Consumption for Plant.3. Perform simulation of hydraulic calculation for SAGS (Hysys Simulation) 4. Design and sizing Atmosferic Flash Tank, line (two phase and single phase), Steam separator, control valve, flow meter, Pressure Safety Valve.5. Surge analysis for Main Steam Pipe from Separator to Steam Turbine.6. Develop Operation and Maintenance, and start-up procedure for Steamfield Above Ground System.7. Scale Analysis study for Brine and Condensate reinjection pipeline.8. Review Laboratory Equipment Technical Bid Evaluation for Geothermal Power Plant.9. Hazop Study for SAGS and Utility area Lahendong unit 5 &6 Geothermal Power Plant10. Develop PFD / UFD / P&ID and perform Mass and Heat Balance.11. Define system/subsystem wise geothermal power plant.12. Planning and execution commissioning system/subsystem in plant. (Steamfield Above Ground System, Utility System, Power Plant System).13. Prepare documentation of Application For Inspection for completeness of commissioning activities.14. Perform coordination between department Electrical, Mechanical and Instrument Team for testing equipment in plant15. Monitoring progress pre-commissioning to Progress commissioning.16. Supporting plant operation for plant commissioning activity. -
Pembangunan Pabrik Gula GlenmorePt. Rekayasa Industri Oct 2013 - Dec 2014Banyuwangi, East JavaAs a Process Engineer and a Commissioning EngineerRESPONSIBILITY :1. Check BEDD based on ITB (Client Requirement) and Contractual clarification.2. Design Water Treatment Package.3. Perform simulation of Heat and Mass Balance. 4. Design and sizing positive displacement pump, tank, IA receiver5. Check utility consumption for plant. 6. Develop Operation and Maintenance, and start-up procedure.7. Review Laboratory Equipment Technical Bid Evaluation for Geothermal Power Plant.8. Develop PFD / UFD / P&ID.
Frequently Asked Questions about Nafis M
What company does Nafis M work for?
Nafis M works for Pt Patra Badak Arun Solusi
What is Nafis M's role at the current company?
Nafis M's current role is Process Engineer/Commissioning Engineer at PT. Patra Badak Arun Solusi (PBAS).
Who are Nafis M's colleagues?
Nafis M's colleagues are Zulfikar Abdullah, Astuti Jamaluddin, Ramdhan Yusril, Jumadil Awal, Meizar Ramdhan, Efri Aji Cahyadi, Lingga Alvianto.
Not the Nafis M you were looking for?
-
-
-
Nafis S. Sos., M. Pd
Sukses Membutuhkan Proses Dan Kerja Keras Dan Do'A Yakin Semua SampaiLampung, Indonesia
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial