Engineering Project Manager
CurrentManaged/managing projects ranging from equipment retrofit to full-scale fluidized bed reactor systems.● Managed design through construction of electrically-heated skid-mounted laboratory-scale Inconel 601 fluid bed reactor system for CVD at 980° C. Created original, aesthetic design of easily insertable reaction canister within open-bottom retort. Oversaw fabrication of process unit and specification/purchase of materials & instruments. Supervised assembly of skid & power panel and conducted successful commissioning of unit. Responsible for large after-market sale of additional reactor components. ● Led R&D work to develop a fluid bed dehydration process for a high-temperature coating compound that led to a full-scale process system purchase. Designed complete full-scale process system including 84” diameter x 27’ thermal fluid heated reactor vessel. Specified/procured all equipment including thermal fluid heating/circulation system and gas preheater, directed purchasing of equipment, instrumentation, and materials, and supervised fabrication of reactor, piping, and control system. Oversaw project through PLC programming and factory acceptance testing. Responsible for large after-market sale of piping system. ● Facilitated & negotiated buyback of reactor system to be retrofitted from former client for use in Procedyne's toll processing facility. Managing fabrication/manufacturing/assembly of 50-foot high processing facility containing 48” diameter fixed bed reactor for catalyst reduction and all piping/instrumentation and equipment such as air dryer, hydrogen recycling system, heat exchangers, cooling tower, filtration systems and loading/discharge system. ● Managing system design plus fabrication, manufacturing, and assembly of waste-to-energy prototype of full-scale facility for conversion of 800 metric tons per year of plastic waste to fuel oil. Responsible for design of fluid bed oil heater plus specification/procurement of offgas abatement system.