Electrical Engineer
CurrentProject 1-: MODIFICATION OF QG1 FRESH COOLING WATER (FCW) SYSTEMProject 2-: HVAC MODIFICATION PROJECT CSP-RLTOProject 3-: SIDE STREAM FILTERATION UNIT FOR TRAIN 6&7.Project 4-: UPGRADATION OF BERTH-4, BERTH-5 & BERTH-6 LASER DOCKING MOORING SYSTEM (VELOCITY APPROACH SYSTEM, MOORING LINE TENSION MONITORING SYSTEM, QUICK RELEASE SYSTEM & SSL COMMUNICATION).Project 5-: INSTALLATION OF FILTERS IN (REFINING) LR-1 & LR-2 FEED CONDENSATE LIN.Project 6-: REPLACEMENT OF OBSOLETE AIR BLOWERS UNIT(08-Y8201-K A/B IN QG1).Project 7-: DEVELOPING TEMPORARY REFUGE (TR) FOR PLANT AND NON-PLANT BUILDINGS (QG NORTH).Project 8-: UPGRADE OF THE OBSOLETE BATTERY CHARGER FOR GTGS IN OFFSHORE.Project 9-: EPC FOR HOOK UP AND MODIFICATIONS AT QG2 SPARE SLOTS (QG2SS) WELLHEAD PLATFORM (WHP) 5 AT QG NORTH OFFSHORE.Project 10-: ENGINEERING, PROCUREMENT & CONSTRUCTION CONTRACT FORAKG SALES GAS DIVERSION PROJECT.Main Accountabilities:• Site survey onshore / offshore for data retrieval.• Design of main SLD and auxiliary distribution schemes.• Protection & relay coordination.• Load calculations.• Power system study ETAP.• Earthing calculations.• Cable sizing calculation.• AC & DC UPS, DG set sizing calculations.• Equipment sizing & selection.• Familiar with Hazardous area classifications & layout.• Preparation of technical specifications of electrical equipment such as generator, transformer, medium voltage/ low voltage switchgear, cables, lighting packages, etc. • Technical bid evaluation.• Cable schedule, cable interconnection/ termination, and cable routing.• Lighting calculations and layouts.• Lightning protection design.• Layouts for electrical rooms.• Vendor drawings review.• Field engineering support.• Familiar with International standards.