Engineering And Maintenance Fmdp
Current- Achieved $3.7MM cost savings through process control, tooling redesigns, and lost time prevention across two product categories; refrigerated cookie dough and chocolate morsels.- Managed and executed $1.31MM of capital equipment and infrastructure improvement projects.- Championed statistical process control (SPC) projects with a total actualized 3.28%.