Nelson Velazco

Nelson Velazco Email and Phone Number

Mechanical Designer at ALLPAINT S.R.L. @
Nelson Velazco's Location
Bari, Apulia, Italy, Italy
Nelson Velazco's Contact Details

Nelson Velazco personal email

About Nelson Velazco

Venezuelan Mechanical Engineer with Italian citizenship. I have extensive experience working as a Project Engineer for the Petroleum and Petrochemical industry in Venezuela. My work has always demanded: strong problem-solving attitude, confront unexpected situations, good communication and interpersonal skills, teamwork and logical analysis. Proficient in technical areas as: reading and interpretation of procedures, isometric layouts and manuals.Highly proficient in using mechanical design software as Autodesk AutoCAD, Solid Edge and Solidwork.I speak Spanish perfectly, English and Italian at a high level, both of them certificated B2.

Nelson Velazco's Current Company Details
ALLPAINT S.R.L.

Allpaint S.R.L.

Mechanical Designer at ALLPAINT S.R.L.
Nelson Velazco Work Experience Details
  • Allpaint S.R.L.
    Product Designer
    Allpaint S.R.L. Jan 2020 - Present
    Locorotondo, Ba. Italy
    Study and development of new products. Evaluate the possible modifications of existing products to guarantee better performance and use. To create detailed 3D models and simulations to effectively communicate design intent. To create physical prototypes using 3d printers.
  • Faena Construcciones (Petroleos De Venezuela, S.A. Centro De Refinacion Paraguana)
    Logistics Coordinator
    Faena Construcciones (Petroleos De Venezuela, S.A. Centro De Refinacion Paraguana) Oct 2014 - Jun 2015
    Falcón Area, Venezuela
    - To coordinate the corrective and preventive maintenance of vehicles and machinery.- Managed inventory levels to verify availability of stocks for customer requirement.- Monitored performance of logistics operations to identify areas for improvements.- Negotiated freight rates with third-party vendors to acquire cost-effective contracts.
  • Odebrecht
    Encargado Iii
    Odebrecht Jan 2013 - Aug 2014
    Maracaibo
    Plant and Industrial Process. Project: Second crossing of Lake Maracaibo, Bridge Nigale. Member of the industrial plant department. - To coordinate the assembly, commissioning and operation of a concrete plant. Brand: Schwing Stetter Model: HN-3.0. with production capacity of 120 mt3 / hr.- Responsible for coordinating the production and distribution of concrete of a brand plant: ALTRON model: AD-100 with production capacity of 80mt3 / hr.- Supply Chain responsibilities such as: * Logistics and Transportation. * Inventory Control and Optimization. * Process Improvement. * Demand Forecasting and Planning. * Cross-functional Collaboration.
  • Faena Construcciones
    Logistics Coordinator
    Faena Construcciones Mar 2011 - Dec 2012
    Punto Fijo, Edo. Falcon
    Responsible for the control, deliver and maintenance of scaffolding material. To control the preventive and corrective maintenance of equipment and vehicles.
  • Empresas Norte Sur C.A. (Petroleos De Venezuela, S.A.) (Pdvsa Gas)
    Construction Coordinator
    Empresas Norte Sur C.A. (Petroleos De Venezuela, S.A.) (Pdvsa Gas) Mar 2009 - Nov 2010
    Punto Fijo, Edo Falcon
    - Responsible for the construction of 2 new service stations to supply Liquefied Natural Gas (LNG).- Study the scope of the project and notify possible deviations regarding the contract.- Study the technical specifications and quality requirements demanded by the client in order to control their implementation during the development of the project.- Coordinate civil, mechanical and electricity works.- Analysis and interpretation of procedures and construction plans.- Coordinate the works of excavation, welding and installation of more than 3 km of underground process piping.- Make weekly progress report.
  • Zuliana De Materiales Térmicos C.A.
    Plant Chief
    Zuliana De Materiales Térmicos C.A. 2007 - 2009
    Maracaibo, Edo Zulia
    - Managed supply chain operations, including logistic, manufacturing and inventory of the thermal insulation products.- Reading of isometric drawings to determine the amount of insulating material to be used (Take-off).- Analysis of technical specifications.- Personnel management.
  • Panamericana De Aislamientos Térmicos S.A.
    Engineering Project Coordinator
    Panamericana De Aislamientos Térmicos S.A. 2004 - 2007
    Various
    Project Coordinator Engineer: Oct 2006 - Apr 2007Major Repair of Boiler F-101 from "PETROLEOS DE VENEZUELA, CARDON REFINERY”. - To coordinate the replacement of pipes, insulation and refractory material of the Boiler.- Enabled to sign cold and hot work permits.Project Coordinator Engineer – Petroquimica de Venezuela S.A. (PEQUIVEN-El Tablazo), 2005- To study the technical specifications and quality requirements demanded by the client.- To Coordinate the installation of thermal insulation over pipes and equipment.- Reading of isometric drawings to determine the amount of insulating material to be used (Take-off).- Daily planning of jobs to be executed.Construction Coordinator - TOTAL & STATOIL (SINCOR). Jose-Anzoategui. 2004. - To Coordinate the replacement of thermal insulation (expanded perlite and polyurethane) damaged in pipes, minor equipment and major equipment.- To Make reports of deviations detected in the field that lead to a change in scope.- To Coordinate the assembly of scaffolding structures in the plant.- Responsible for signing permits for cold work.
  • Panamericana De Aislamientos Termicos S.A.
    Construction Coordinator
    Panamericana De Aislamientos Termicos S.A. 2003 - 2004
    Jose, Edo. Anzoategui. Venezuela
    Construction Coordinator - CONOCO PHILLIPS COMPANY & CHEVRON-TEXACO. Jose-Anzoategui. 2003 - 2004“HAMACA Project” (Construction phase): - To Study the scope of the project and notify possible deviations regarding the contract.- Study the technical specifications and quality requirements demanded by the client in order to control their application during the development of the project.- Reading of isometric drawings to determine the amount and type of insulating material to be used (Take-off).- To Coordinate the installation of thermal insulation in pipelines, minor equipment and major equipment.- Make reports of deviations detected in the field that lead to a change in scope.- Make requisition of necessary materials to cover the scope changes.- Make weekly progress reports.- Support to the Planning department for statistical calculations of job performance.
  • Panamericana De Aislamientos Termicos S.A.
    Project Engineer
    Panamericana De Aislamientos Termicos S.A. 2001 - 2003
    Various
    Construction Engineer, Petroleos de Venezuela S.A. - Cardon Refinery 2003Project: Reparation of the Boiler CO Catalytic's Plant .To direct the replacement of damaged internal steel walls, and the refractory brick and cement.Construction Engineer: PETROQUIMICA DE VENEZUELA (PEQUIVEN- El Tablazo). 2002Improvement of Oxicloration Process in the MVC II Plant”. - To Study the scope of the project and notify possible deviations regarding the contract.- To Coordinate the assembly of a heat exchanger.- To coordinate the Installation of thermal insulation (mineral wool) over pipes and over the heat exchanger.- Elaboration of As Built plans in AutoCAD.Plant Leader in the Contractor’s Plant. Los Puertos de Altagracia, Zulia. Venezuela 2001 - 2002- To Coordinate the preventive and corrective maintenance of vehicles and equipment of the company (forklifts, backhoe loaders, power plant, cranes).- To plan and coordinate the transformation of insulating material.- Management of inventories.- Implementation of ISO-9001 procedures to achieve certification.- Logistics of materials and equipment to be used on the different projects.Construction Engineer. 2001HOVENSA Project Assigned to Z&P. Zulia. To direct the installation of Thermal Insulation & Fireproofing over pipes and beams of 40 modules to be installed overseas.

Nelson Velazco Education Details

Frequently Asked Questions about Nelson Velazco

What company does Nelson Velazco work for?

Nelson Velazco works for Allpaint S.r.l.

What is Nelson Velazco's role at the current company?

Nelson Velazco's current role is Mechanical Designer at ALLPAINT S.R.L..

What is Nelson Velazco's email address?

Nelson Velazco's email address is nv****@****ail.com

What schools did Nelson Velazco attend?

Nelson Velazco attended Universidad Del Zulia, Vancouver English Centre.

Not the Nelson Velazco you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.