Assistant Planning Engineer
New Haripur 412 Mw Ccpp Project, Narayanganj, Bangladesh.
● Conducted full construction estimations, prepared and reviewed BOQs, and checked construction bills using AutoCAD. ● Developed project schedules with MS Excel, overseeing documentation such as estimates, reports, and manuals. ● Supervised the civil and architectural sections, coordinating subcontractors and ensuring project quality. ● Managed manpower and materials planning, as well as batching plant operations and RMC supply scheduling. ● Oversaw construction of RCC and steel structures, ensuring subcontractor work complied with designs. ● Conducted regular site inspections, supervising substructure, superstructure, and utility work. ● Performed quality checks on materials like soil, aggregates, cement, and rebar at third-party labs, ensuring adherence to specifications. ● Pre-concrete inspections, verifying formwork and steel bar alignment; conducted post-concrete checks for defects. ● Reviewed contractor shop drawings, materials, and method statements, initiating activities to meet project timelines. ● Coordinated health and safety management and maintained effective client and liaison relationships. ● Prepared as-built AutoCAD drawings and method statements for RCC and steel structure construction. ● Monitored junior staff, and supervised critical construction tasks, including foundation work, piling, and various structure installations. ● Managed tasks like GTG Foundation, STG Foundation, HRSG, and other major construction components for the 412 MW CCPP Project. etc.