Tunnel Engineer
Current1) Snowy Hydro 2.0:Part of design team responsible for a number of packages related to Headrace & Tailrace tunnels, Access & ventilation tunnels and Powerhouse area. 2) S.S. 340 'Regina' - Variante della Tremezzina:Part of design team responsible for design elements for Galleria Comacina, Galleria Perlana, Svincolo di colonno e gli altri cunicoli. Design elements: Temporary lining design (Shotcrete, rockbolts & steel ribs), Final lining design (Cast insitu & Segmental), Ground reaction curves, Face stability, Wedge stability, Steel frames.