Nirendhira Kumar Neelamegam Email and Phone Number
•Upgrading of Substation-Equipment installation, Cable routing, Conduits routing, cable tray routing and installation•Installation of Cable duct Bank and trench, civil enhancement.•Prepare the Material Technical Approval (MTA), Material Take of List (MTL), Method of Statement (MOS), Bill of Quantity (BOQ).• Preparation of Substation grounding system & Power, Control and Instrument cable schedule.•Laying of Fiber optic Cable (FOC) laying (Single & Multi mode-24 & 48 Fiber)• Instrument cable routing and equipment installation ( Transmitter, Indicator, level gauge)• Installation of Telecom pedestal, Fiber patch panels & RIO panels•Testing and Commissioning of GIS (Gas Insulated Substation) Equipment & LCC Panels.•Testing & Commissioning of 33kV, 13.8Kv, 6.6Kv and 0.415 kV switchgear panel and PCC& MCC LT panels including CT, PT, Circuit Breaker, Control Logic etc.•Testing and Commissioning of Control& Relay Panel’s which includes Transformer differential, Generator differential, Motor differential, Restricted earth fault protection schemes.•Transformer testing up to 270 MVA– 400 kV Step Up Transformers.•Testing and Commissioning of Generator Control & Relay Panel and Generator testing up to 20 MW.•Testing Report preparation and Submission.
Nesma Infrastructure & Technology
View- Website:
- nesma-nit.com
- Employees:
- 890
-
Lead Engineer-ElectricalNesma Infrastructure & TechnologySaudi Arabia -
Electrical EngineerNesma Infrastructure & Technology Jun 2023 - PresentSaudi Arabia1. Perform detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications such as calculation, cable sizing, earthing, load schedule calculations.2. Prepare the Bill of Materials (BOM), Material Take Off (MTO), Method of statement (MOS), Material technical approval (MTA), RFI documents, job safety analysis (JSA).3.Review the Single Line Diagram (SLD), equipment layouts, earthing, lighting & small power, conduit, cable tray, cable route layouts, equipment typical installation drawings etc. for client approval.4.Installation of AC UPS and battery charger for the AC/DC auxiliary system.5.Installation & testing of MV & LV switch gear, motors, PCC, MCC, LCC & LV power panel.6.Interfacing of Power System Automation (PSA) &Power Management System (PMS).7.Installation of Fire alarm control panel (FACP), smoke detector-transmitter & receiver, manual pull station, horn & beacon.8.Installation of Instruments such as ESD (Emergency Shutdown) system, Pressure Transmitter & Indicator, Level Transmitter & Indicator, Flow Transmitter, analogue and digital junction boxes.9.Arrange the QA/QC for the Inspection (RFI) upon material receiving and completion of installation activity. -
Project Engineer (Commissioning)Energia Mtc Llc Aug 2019 - Jul 2022Al Jubail-Saudi Arabia1.Installation of power transformer, RMU, Diesel generator & cable tray.2.Commissioning of diesel generator up to 2500 KVA- 13.8 kV.3.Perform the MV & LV cable pulling (Under Ground/ Above round) , Splicing and termination.4.Installation of NGR , equipment and system grounding, grounding grid.5.Preparation of Cable and conduit schedule, Bill of Quantity (BOQ) & Material Take Off (MTO).6.Perform the synchronizing, Power transfer and isolation switching with the grid.7.Prepare the daily, weekly and monthly power generation and fuel consumption report.8.Testing and commissioning Transformer and perform the oil filtration, BDV & DGA test.9.Testing of instrument transformers, CB, Earthing Switch & protection relays- 33 kv switchgear.
-
Sr.Testing And Commissioning EngineerReltec Engineers Aug 2012 - Jun 2018Bengaluru, India1.Testing and commissioning of protective equipment of CT,CVT,CIRCUIT BREAKERS,ISOLATORS in substation up to 400 kV (GIS & AIS)2.Testing and configure of protection relays such as Transformer protection, Generator protection, Motor protection, Feeder protection, Busbar protection.3.Testing and commissioning of Power transformer up to 315 MVA and Generator up to 20 MW.4.Protection Scheme checking for different busbar schemes, Function block checking in protection schemes.5.Testing and commissioning of GIS LLC, Control & relay panel up to 400 kV.6.Testing of switchgear panel- 33/11/6.6/0.415 kV.7.Testing and commissioning of Battery charger, UPS, AC/DC distribution board.
Nirendhira Kumar Neelamegam Education Details
Frequently Asked Questions about Nirendhira Kumar Neelamegam
What company does Nirendhira Kumar Neelamegam work for?
Nirendhira Kumar Neelamegam works for Nesma Infrastructure & Technology
What is Nirendhira Kumar Neelamegam's role at the current company?
Nirendhira Kumar Neelamegam's current role is Lead Engineer-Electrical.
What schools did Nirendhira Kumar Neelamegam attend?
Nirendhira Kumar Neelamegam attended Anna University Chennai.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial