Engineering Intern
Analyzed the manufacturing processes, applying Six Sigma in order to identify keyareas of material waste and improve efficiency.Developed a program predicting tube lengths through the annealing and drawing processes.Optimized the number of sellable pieces produced from raw tubing after the CNC and fabrication process.Achieved an 4.45% additional yield in material scrap, saving the company over $325,000 annually.Coordinated and discussed acid filtration solutions with third party companies for pickling tanks.Actively engaged in engineering and safety committee meetings, contributing to process improvements and workplace safety initiatives.Assisted in laboratory testing of materials.