Manager
CurrentProject:1. DORAD (ISERIEL) - 800 MW CCPP with two identical units each of 400 MW and comprises 6 GTG, 6 OTSG and 1 STG.Responsibility:• Stress Analysis for all critical systems.• Issuing Support specification and support design review for critical systems.2. QURAYYAH IPP (SAUDI ARABIA) - A 3927 MW Independent Power Project with 6 units each of 654.5 MW with 2 GTG, 2 HRSG and 1 STGResponsibility:• Issuing Stress Analysis Design Criterion Document.• Stress Analysis of HP Steam & HP Drain System.• Issuing Support specification and support design review.