Palka Adripta

Palka Adripta Email and Phone Number

Divison Head and Sr.Manager(HSSE Performance and Operation) @ Elnusa Petrofin
Indonesia
Palka Adripta's Location
Indonesia, Indonesia
Palka Adripta's Contact Details

Palka Adripta work email

Palka Adripta personal email

About Palka Adripta

He has exposured from upstream to downstream oil & gas business. He hold a Certification as Professional Engineer in pipeline/subsea/marine, mechanical/piping engineer/estimator and platform T&I. Specialication offshore deep water pipeline, subsea system/equipment , topside plant process design/modification, downstream facilities and project management for onshore and offshore project.He involved various project in some brown field project not limited to plant process upgrading, Onshore development facilities for a number of internatinal Oil and Gas Operator such as Exxon Mobil, Conoco Phillps, Premier Oil, Pertamina, Hess, Pemex, ONGC, Total EP, MOGE etc. He also actively involved in the new green field development for Offshore business expansion such as FPSO Development, the Deep water development for oil and gas exploration.Specialties: Technical aspect: -Specialize in subsea system, deep water pipeline, piping and mechanical engineering.-Specialize in metallurgy, material, fitness for service, risk based inspection and failure analysis.- Maintenance and Reliability-Jetty/marine engineering.-Renewable energy(Full cell,Latent Heat Thermal Energy Storage)- Green energy and clean roomCommercial/project management:-Specialize in contractor/vendor enggagement, cost estimating, project schedule, project bidding, local content study, contract management, feasibility study, risk assesment, business development and project management.Software Skills:Mathcad, Nastrans(FEA), Deeplines, Offpipe, Caesar II, Autopipe, Maxsurf, Diodore, Plaxis, Abaqus, Phyton, Microsoft Project

Palka Adripta's Current Company Details
Elnusa Petrofin

Elnusa Petrofin

View
Divison Head and Sr.Manager(HSSE Performance and Operation)
Indonesia
Employees:
1587
Palka Adripta Work Experience Details
  • Elnusa Petrofin
    Divison Head And Sr.Manager(Hsse Performance And Operation)
    Elnusa Petrofin
    Indonesia
  • Elnusa Petrofin
    Divison Head(Hsse Performance & Operation)
    Elnusa Petrofin Jan 2024 - Present
    Jakarta, Indonesia
    Drive the new roles for safety commitment in operation and drive the excellent performance. Direct reporting to President Director.Maintain and monitoring several business unit comprises to Joint operation infrastructure, fuel petrochemical services, industrial marine, upstream chemical and fleet management.Hold certificate as Deputy Chief Engineer (Wakatek) by the Directorate General of Oil and Gas (Ditjen Migas).
  • Elnusa Petrofin
    Dept Head(Asset Management, Technical And Maintenance Matters)
    Elnusa Petrofin May 2023 - Jan 2024
    Jakarta, Indonesia
    A subsidiary of PT.Elnusa Tbk and part of subholding upstream PT.PertaminaDirect reporting to operation and marketing directorManage for several key activies comprises to engineering, asset management, project monitoring, infrastructure and fleet maintenance.
  • Elnusa Petrofin
    Head Of Technical Dept(Engineering, Construction, Pmo And Facilities Maintenance)
    Elnusa Petrofin Mar 2019 - May 2023
    Greater Jakarta Area, Indonesia
    Manage and lead the Engineering department for engineering activities(FEED and Detailed Design), direct monitoring for EPCI Project and facilities maintenance management. In part of management to ensure quality and performance of Contractor along the project journey.Apart of Engineering and EPCI work activity, He also dedicated as focal point of maintenance, reliability and integrity the Own facilities(Oil storage tank, LPG Pressurized facilities, Jetty, fleet truck) and technical… Show more Manage and lead the Engineering department for engineering activities(FEED and Detailed Design), direct monitoring for EPCI Project and facilities maintenance management. In part of management to ensure quality and performance of Contractor along the project journey.Apart of Engineering and EPCI work activity, He also dedicated as focal point of maintenance, reliability and integrity the Own facilities(Oil storage tank, LPG Pressurized facilities, Jetty, fleet truck) and technical advisor for Marine Vessel operation includes Single Point Mooring/Conventional Buoy Mooring for loading and unloading activities. He also commence to develop maintenance program for the aging facilities through Residual Life Assesment(RLA), Risk Based Inspection(RBI) and Fitness for Service(FFS).Highly committed for HSSE matters along the EPCI project and Oil and gas operation activity. Show less
  • Techno Engineering(Technical Consultant For Oil&Gas And Power Plant Business)
    Business Development And Project Manager
    Techno Engineering(Technical Consultant For Oil&Gas And Power Plant Business) Nov 2014 - Present
    Indonesia, ,Kuala Lumpur,Singapore, Lagos, Australia, Brunei And Philliphines
    Manage engineering activities and put highest effort for technical assistance on site location. Actively seek new opportunity and market in the oil and gas project(onshore and offshore development project), renewable energy, mining, warehouse and asset management, power plant project(Including for Independent Power Producer) and approach to new area of Biomass development project.Scope of engineering and PMC service covers:1. Front End Engineering Design/Detailed Design -… Show more Manage engineering activities and put highest effort for technical assistance on site location. Actively seek new opportunity and market in the oil and gas project(onshore and offshore development project), renewable energy, mining, warehouse and asset management, power plant project(Including for Independent Power Producer) and approach to new area of Biomass development project.Scope of engineering and PMC service covers:1. Front End Engineering Design/Detailed Design - Hydraulic Analysis, Corrosion Assesment, Over Field Layout, Pipeline Allignment Sheets, Stress Analysis, Expansion Analysis, Buckling Analysis, Transportation & Installation Analysis, Lowering Analysis, Marine Engineering) -Platform structure and Subsea Equipment: Inplace analysis, Lifting Analysis, T&I analysis)2. Risk Assesment Study: Case study of Dragged and Dropped Anchor, Mapping of Hazardous area and aging facilities3. Environmental Study and Waste management4. Warehouse, asset and procurement assistance5. Supervising of Construction Activity(Soil investigation, measuring of existing faciliting)Client: Anantarupa Mooring Limited Nigeria, Corinthian Energy Resources Pty Ltd, PT.PHE ONWJ, PT.Enerkon, PT.Lemtek, , PT.Exatra Enjiniring, PT.Gemilang Jabung Energy, PT.SCG, PT.Surveyor Indonesia, PT.Pertamina(Persero), EMP Bentu, Pandawa Prima Lestari.
‬ Show less
  • Universitas Pertamina
    Industrial Internship And Sessional/Final Project Lecturer
    Universitas Pertamina Jan 2020 - Present
    Jakarta, Indonesia
    A member of committe and actively involved in the curriculum review in the mechanical engineering department. Supervise and guide Undergraduate students for the following industrial oil and gas thesis topics: -Stress Analysis and remaining life assesment of storage tank on 16 kL fleet truck in the end of operation phase. -Remaining life assesment of spherical pressure vessel. -Design of spherical pressure vessel Liquified Petroleum gas(LPG) with… Show more A member of committe and actively involved in the curriculum review in the mechanical engineering department. Supervise and guide Undergraduate students for the following industrial oil and gas thesis topics: -Stress Analysis and remaining life assesment of storage tank on 16 kL fleet truck in the end of operation phase. -Remaining life assesment of spherical pressure vessel. -Design of spherical pressure vessel Liquified Petroleum gas(LPG) with capacity of 3000MT. -Stress evaluation and remaining life calculation of vertical cylinder tank using Finite Element Method. - Global buckling analysis of Offshore Pipeline using Finite Element Method(Abaqus&Phyton Programming) - Buoyancy Control of Pipeline(river crossing) During Push Pull Activity. - A comparision study of 16" Subsea Pipelaying analysis using Orcaflex. - Qualitative and quantitative risk assesment of 16" subsea pipeline at shallow water as per DNV-RP-F107. Show less
  • Atma Jaya Catholic University Of Indonesia
    Industrial Internship And Final Project Lecturer
    Atma Jaya Catholic University Of Indonesia Jan 2020 - Present
    Jakarta, Indonesia
    Supervise and guide undergraduate students for the following cases: -Fuel Cell as an alternative the renewable energy for automotive industry(Market and conceptual study).-Modelling of gas piping system as per ASME B31.3 and FEA(Caesar II), Stress Evaluation and Remaining life calculation of gas piping system(Case study: LPG Station)
  • Pt. Meindo Elang Indah
    Project Engineering Manager
    Pt. Meindo Elang Indah Mar 2018 - Mar 2019
    Greater Jakarta Area, Indonesia
    Manager of engineering activity and has participated during Offshore construction activity for accomplishement of Pipeline Repair and Replacement Project 2018(Owned by Pertamina Hulu Energi ONWJ).Apart of this also been assigned for another project such as:1. Client: Jawa Satu Project(Owned by Pertamina, Marubeni, Sojitz). The main scope of this project in order to upgrade power plant 1760 MW through construction phase which has been involve several equipments comprises to FPSO,… Show more Manager of engineering activity and has participated during Offshore construction activity for accomplishement of Pipeline Repair and Replacement Project 2018(Owned by Pertamina Hulu Energi ONWJ).Apart of this also been assigned for another project such as:1. Client: Jawa Satu Project(Owned by Pertamina, Marubeni, Sojitz). The main scope of this project in order to upgrade power plant 1760 MW through construction phase which has been involve several equipments comprises to FPSO, Offloading platform, Marine Jetty, Onshore/offshore pipeline both gas pipeline, seawater intake/discharge pipeline and ORF station to support Combined Cycye Gas Turbine..2. Client: PHE ONWJKLD Field Development as part of EPCI work for fabrication/installation of New Platform and Subsea Pipeline 10"-3.5km.3. Horizontal Directional Drilling of Cable installation at Juanda International airport(Tendering stage) Show less
  • Reliable Controls Corporation
    Project Manager At Pt.Dms For Mech/Piping/Hvac And Structure/Civil(Contractor Representative)
    Reliable Controls Corporation Sep 2016 - Mar 2018
    Jakarta, Thailand
    As contractual awarded for upgrading the HVAC system of clean room facilities from one of the biggest the State Owned Enterprises . Collaborate and supervise Site Managers, HSE Manager, Lead Discipline Engineers to coordinate on-going project which comprises of various interdisciplines:.:Mechanical and Piping system work: installation of Chiller Unit, Pump Unit, Expansion Tank, Air Handling Unit,Dust Collector, Hot water generator/tank, Heat Exchanger and Piping interconnecting System in… Show more As contractual awarded for upgrading the HVAC system of clean room facilities from one of the biggest the State Owned Enterprises . Collaborate and supervise Site Managers, HSE Manager, Lead Discipline Engineers to coordinate on-going project which comprises of various interdisciplines:.:Mechanical and Piping system work: installation of Chiller Unit, Pump Unit, Expansion Tank, Air Handling Unit,Dust Collector, Hot water generator/tank, Heat Exchanger and Piping interconnecting System in accordance with ASME B31.3 and ASME Sec VIII. .:Civil and Structure Work: Fabrication of WF/CNP, foundation and civil work.: Electrical and Plant Automation System: Installation of cable/panel and set up plant automation monitoring system.Apart from his involvement in the project management aspect, He also able to advise for problem solving of mechanical and Instrumentation(SCADA) issue. He has proven the proposed design in accordance familiar with international code and standard which relevant with mechanical static and rotating equipment such as:.:ASME Sec VIII for Boiler and Pressure Vessel.:API standard 660 for shell and tube heat exchanger.:ASME B73 for Pump StandardAs Project Manager(Contractor Representative) also report for report to President Director and liaise with Client and supervise subcontractor’s performance for supporting activity such as Civil and structure Work, Balancing ,Adjusting,testing(Leakage test, vibration test, Noise measurement) and Commisioning activities.Monitor and working very closely with Some vendors to ensure delivery of package, conduct FAT, SAT as a series of Quality Control procedure. As focal point also have to coordinate with some staff at Head office for Engineering Activity, Procurement Activity and Finance Department for claiming purpose of Invoice. Show less
  • Pt. Ejjv Engineering Indonesia
    Engineering And Tender Manager
    Pt. Ejjv Engineering Indonesia Jun 2015 - Aug 2016
    Greater Jakarta Area, Indonesia
    Position held : Engineering and Tender ManagerProject/tendering stage Involved:• Provision of Pre FEED mooring and marine terminal services(Genting Oil)• FEED Study for MAC Development(HCML)• Provision of EPCI Service for infill well facility tie-in project KRA south 2(Star Energy Kakap)• Blanket engineering service(Star Energy Geothermal Wayang Windu)• Call out engineering design and technical support contract(Santos)• Provision of fabrication and installation… Show more Position held : Engineering and Tender ManagerProject/tendering stage Involved:• Provision of Pre FEED mooring and marine terminal services(Genting Oil)• FEED Study for MAC Development(HCML)• Provision of EPCI Service for infill well facility tie-in project KRA south 2(Star Energy Kakap)• Blanket engineering service(Star Energy Geothermal Wayang Windu)• Call out engineering design and technical support contract(Santos)• Provision of fabrication and installation services for kakap production facilties maintenance(Star Energy Kakap)ResponsibilitiesAs Engineering/construction manager Manager to supervise All activities from biding stage, engineering up to yard supervision.DUTIES & RESPONSIBILITIES: • Coordination of all disciplines for a project and interface to yard manager/PM • Schedule and Budget for project • Approval of engineering/tender/construction/installation document for project to comply PTK 007 • Engineering/tender deliverable register • Project engineering quality plan • Technical assistance and support during project/fabrication activity • Completion of as-built documents • Technical liaison with Clients, Subcontractors and Vendors • Engineering Progress Monitoring , identification of Shortfalls & implementation of Recovery Plans • Contribute to review and updating of departmental and project procedures • Implementation of Management of Change Process • Compliance in accordance with HSE• Prepare change order of Engineering service • Review contract of fabrication and engineering service• Prepare variation order of additional engineering/fabrication works • Annual reporting to presiden director for oil and gas market and future opportunity(Subsea and marine works) • Approach to the client for segmenting future market in offshore/Subsea project. Show less
  • Pape Engineering
    Discipline Engineering Manager(Pipeline, Surf, Offshore Platform And Transportation & Installation)
    Pape Engineering Aug 2014 - May 2015
    Jakarta, Singapore
    As Engineering Manager to lead engineering activity, monitor installation activity and approach to solve contractual issue. Technical and commercial reporting to COO and SURF Director at Headquarter.Project Involved:1. Client: Pertamina PHE ONWJPertamina EA-EJ Pipeline Replacement Project(Engineering Manager).2. Client: Total E&PSouth Mahakam Phase III(Engineering Manager)3. Client: CNOOC SESMila A-AstiA and Banuwati EPCI for Platform and Pipeline Installation… Show more As Engineering Manager to lead engineering activity, monitor installation activity and approach to solve contractual issue. Technical and commercial reporting to COO and SURF Director at Headquarter.Project Involved:1. Client: Pertamina PHE ONWJPertamina EA-EJ Pipeline Replacement Project(Engineering Manager).2. Client: Total E&PSouth Mahakam Phase III(Engineering Manager)3. Client: CNOOC SESMila A-AstiA and Banuwati EPCI for Platform and Pipeline Installation Project(Engineering Manager)3. Client: Total E&PTotal Astral Argentine-Vega Pleyade Project for Platform and Piggy back Pipeline Installation Project(Engineering Manager)4. Risers Flowlines Installaion EPCI Package-Bidding Purpose for Technip(Engineering Manager)5. Client: Star Energy(Kakap)EPCI Service for KG and KH Risers Replacament-Bidding Purpose for Star Energy(Engineering Manager)6. Client: Husky Cnooc Madura LimitedEPCI for MDA and MBH Fields Development-Bidding Purpose for HCML(Engineering Manager)ResponsibilitiesAs Engineering Manager day to day to monitor supervise All engineering activities(Supervise and involve for the On going Project, Bidding project, conduct the lesson learnt session). Engineering department consist of (10 Pipeline Engineers, 6 Structure Engineers, 5 Pipeline Designers,4 Structure Designers,1 Project Controller and 3 Document Control Staff) Show less
  • Pape Engineering
    Lead Surf And Marine/Pipeline Engineer
    Pape Engineering Nov 2013 - Jul 2014
    Jakarta, Indonesia
    As Engineering Lead had responsibily to run and coordinate some Indonesia Project. Apart from that as representative engineering office in Indonesia also participate in the bidding stage to involve and follow the Oil and Gas market in Indonesia.
  • Pape Engineering
    Lead Marine/Pipeline And Surf Engineer
    Pape Engineering Nov 2012 - Oct 2013
    Jakarta, Balikpapan, Singapore
    Fully dedicated as Lead Marine and SURF Engineer to supervise 8 Engineers and 7 Designers, which is a corporate role. I am tasked with building and heading-up the capacity and capabilities of the marine and SURF engineering division such that it can support at least 4 on-going projects (conventional and SURF) at one time, as well as to ensure that all the systems are in place.Role as Marine and SURF Lead Engineer as follows:.: Participate in weekly technical meeting.:… Show more Fully dedicated as Lead Marine and SURF Engineer to supervise 8 Engineers and 7 Designers, which is a corporate role. I am tasked with building and heading-up the capacity and capabilities of the marine and SURF engineering division such that it can support at least 4 on-going projects (conventional and SURF) at one time, as well as to ensure that all the systems are in place.Role as Marine and SURF Lead Engineer as follows:.: Participate in weekly technical meeting.: Prepare deliverable list,Master Document Register,and Man-hours estimation .: Prepare weekly and Monthly report.: Review and checking engineering calculations to satisfy Client's requirements.: Maintain quality and progress as per planned Schedule in the S-Curve.: Inter-discipline coordination with operation team.: Interfacing and Consulting with client or 3rd party.: Prepare Variation Order Show less
  • Pape Engineering
    Lead Pipeline Engineer
    Pape Engineering Jul 2012 - Nov 2012
    Jakarta, Singapore
    Starting point career as entity of JV Swiber and Pricipia France. I have been assigned to run and develop the Pipeline Engineering Department in Jakarta. As Representative of the Headquarter in Singapore that Principia Asia Pacific Engineering Jakarta will act for some Indonesia Projects
  • Worley
    Subsea Umbilical Riser Flowline Engineer
    Worley Apr 2012 - Jul 2012
    BP TANGGUH PIPELINE AND SUBSEA TIE-BACK EXPANSION PROJECTThe development comprises the Wiriagar(WDA), Ofaweri(OFA) and Roabiba(ROA) offshoregas fields. Production from these fields will be from production platform and transportedthrough flowlines to Tangguh ORF.All subsea facilities/ pipelines systems will be designed/installed on the Tangguh developmentcan be followed as:• Subsea pipeline 24” WDA-ROA(15.7km)• Subsea pipeline 24” ROA-ORF(11.4km)• Main subsea… Show more BP TANGGUH PIPELINE AND SUBSEA TIE-BACK EXPANSION PROJECTThe development comprises the Wiriagar(WDA), Ofaweri(OFA) and Roabiba(ROA) offshoregas fields. Production from these fields will be from production platform and transportedthrough flowlines to Tangguh ORF.All subsea facilities/ pipelines systems will be designed/installed on the Tangguh developmentcan be followed as:• Subsea pipeline 24” WDA-ROA(15.7km)• Subsea pipeline 24” ROA-ORF(11.4km)• Main subsea umbilical WDA-ROA(15.7km), ROA-ORF(11.4km) and redundant subsea umbilical WDA-ORF are designed consist of 2" methanol tube, 1" wax inhibitor, 1" corrosion inhibitor, 95mm2 electrical cable and 125 μm cladding diameter of fiber optic• Subsea wye, SUTU,SUDU,SUTA,master control station• Shore approach pipeline design/engineering• Feasibility study of Horizontal Directional Drilling near shore area Show less
  • Worley
    Subsea System And Flowline(Surf) Engineer/Estimator
    Worley Dec 2011 - May 2012
    Jakarta-Makassar Strait
    CHEVRON'S GENDALO GEHEM SUBSEA FACILITIES&FLOWLINES(SURF) PROJECTINDONESIA DEEPWATER DEVELOPMENTThe development comprises the Gendalo and Gehem offshore gas fields. Production from these fields will be from subsea wells and manifolds, transported through flowlines to twoseparate Floating Production Units. Beside development of flowline facilities ,this project has covered for subsea equipment, umbilical, flying lead, PLEM and PLET.
  • Worley
    Export Pipeline Engineer And Project Engineer/Estimator
    Worley Mar 2011 - Dec 2011
    Jakarta-Makassar Strait
    CHEVRON'S GENDALO GEHEM EXPORT PIPELINES PROJECTINDONESIA DEEPWATER DEVELOPMENTHave involved for 24143 hours in Gendalo Gehem Gas Export Pipeline Project and shall be completed end of 2011. The main scope of works consist of development 4 export pipelines that can be specified as :-20" Gas and 8" Condensate Export Pipeline(140 km) which are connecting FPU at Gendalo Hub in 1108 m water depth to Santan Terminal(ORF).-16" Gas and 8" Condensate Export Pipeline(88km) which are… Show more CHEVRON'S GENDALO GEHEM EXPORT PIPELINES PROJECTINDONESIA DEEPWATER DEVELOPMENTHave involved for 24143 hours in Gendalo Gehem Gas Export Pipeline Project and shall be completed end of 2011. The main scope of works consist of development 4 export pipelines that can be specified as :-20" Gas and 8" Condensate Export Pipeline(140 km) which are connecting FPU at Gendalo Hub in 1108 m water depth to Santan Terminal(ORF).-16" Gas and 8" Condensate Export Pipeline(88km) which are connecting FPU at Gehem Hub in 1755 m water depth to Santan Terminal(ORF).The following engineering and project management aspects are covered in this scope:Engineering aspects: a.Pipeline deepwater design/engineering b.Material selection review c.Preliminary study of flow assurance interface d.Pipeline route selection e.Prepare procedure of construction and installation phase. f.review and release materialProject management aspects: a.Project management team b.Cost Estimation c.Local content study d.Project schedule covers detailed engineering work,procurement, construction, installation and pre- commisoning work Show less
  • Pt. Lapi Itb
    Subsea Engineer And Integrity Engineer
    Pt. Lapi Itb Sep 2009 - Feb 2011
    Jakarta
    Involved for the number of new field facilities development such asProject Name :TSB Development Subsea Facilities ProjectPosition as Subsea Facilities and Flowline (SURF) EngineerClient: Kangen Energy IndonesiaProject Background:The Terang Sirasun Batur (TSB) project consists of the development of 4 offshore gas fields in a seismically active area - Terang, Sirasun East, Sirasun West and Batur in the Bali Sea.The development consists of nine (9) subsea wells… Show more Involved for the number of new field facilities development such asProject Name :TSB Development Subsea Facilities ProjectPosition as Subsea Facilities and Flowline (SURF) EngineerClient: Kangen Energy IndonesiaProject Background:The Terang Sirasun Batur (TSB) project consists of the development of 4 offshore gas fields in a seismically active area - Terang, Sirasun East, Sirasun West and Batur in the Bali Sea.The development consists of nine (9) subsea wells producing into a gas gathering flowline system in two phases. This gas will then flow to a floating production unit (FPU), a spread moored barge providing separation, compression, dehydration and supporting utilities systems. The treated gas will be fiscally metered and exported via an export pipeline to East Java Gas Pipeline (EJGP).Project Name : Integrity and Remaining Strength Analysis for Corroded Pipelines based on Code ASME B31G and DNV-RP-F101 (18” Cilamaya-Pegaden 59km Pipeline)Position held :Pipeline Integrity and Corrosion EngineerClient: Pertamina EPProject Background:Quantitative analysis for integrity and remaining strength is needed to obtain MAOP and status wheather corroded regions of along pipeline. Corrosion data which were resulted by smart pigging process was developed. Integrity and remaining strength analysis of Cilamaya-Pegaden pipeline system by using corrosion data for different location as input for calculation. Project Name :Fitness For Service of 16” Riser Pipeline WHP-A ProjectPosition held :Pipeline and Riser Integrity EngineerClient : Conoco Phillips – BelanakProject Background:Based on inspection data for WHP-A 16” pipeline WHP-A(pipeline from WHP-A to FPSO Belanak). Excessive corrosion was identified at riser splash zone. This corroded condition can reduce integrity of riser for long term operation load. To obtain the remaining strength of the corroded section it recommended to conduct stress and strength analysis due to internal and external loading. Show less
  • Sembcorp Industries Ltd
    Mechanical/Piping And Pipeline Engineer(Project Engineer)
    Sembcorp Industries Ltd May 2008 - Aug 2009
    Greater Jakarta Area, Indonesia
    During that times have been involved for the number of project which has been started from tendering stage,engineering supervision till construction stage.On that period has been assigned and supervise as following projects including onging projects and tendering stage:-Corridor Mercury Removal-EPCI Work(Conoco Phillips)-Gajah Baru Development Project-Tendering stage(Premier Oil)-Eastern Hub Mercury Removal FPSO Belanak-Tendering stage(Conoco Phillips)-Betara Complex… Show more During that times have been involved for the number of project which has been started from tendering stage,engineering supervision till construction stage.On that period has been assigned and supervise as following projects including onging projects and tendering stage:-Corridor Mercury Removal-EPCI Work(Conoco Phillips)-Gajah Baru Development Project-Tendering stage(Premier Oil)-Eastern Hub Mercury Removal FPSO Belanak-Tendering stage(Conoco Phillips)-Betara Complex Development 4-Tendering stage(Petrochina Jabung International)-CPP/AUP Platform Installation Package-Tendering stage(Hess Pangkah) Show less
  • Sembcorp Industries Ltd
    Topside Piping And Subsea Pipeline Engineer
    Sembcorp Industries Ltd Dec 2007 - May 2008
    Jakarta, Malaysia, India
    Involved as Topside Piping and Subsea Pipeline Engineer in the Heera’s project scope of work includes surveys (pre-engineering, pre-construction/pre-installation and post-installation), design, engineering procurement, fabrication, loadout, tie down/sea fastening, transportation, installation, hook-up, testing, pre-commissioning and commissioning of 4 unmanned platforms, 70 km of submarine pipeline (rigid & flexible), laying of 25 km of composite cables, modifications of 7 existing platforms… Show more Involved as Topside Piping and Subsea Pipeline Engineer in the Heera’s project scope of work includes surveys (pre-engineering, pre-construction/pre-installation and post-installation), design, engineering procurement, fabrication, loadout, tie down/sea fastening, transportation, installation, hook-up, testing, pre-commissioning and commissioning of 4 unmanned platforms, 70 km of submarine pipeline (rigid & flexible), laying of 25 km of composite cables, modifications of 7 existing platforms and installation of a new SBM in Mumbai High South. The work is scheduled to be completed within 16 months. Show less
  • Tripatra
    Piping And Pipeline Engineer
    Tripatra 2006 - 2007
    Greater Jakarta Area, Indonesia
    As Piping and Pipeline Engineer who was providing service to Chevron Pacific Indonesia for NDD project was executed to initiate production of 3 billion barrel oil field in Duri, Indonesia. Development includes 750 production and water injection wells. Facilities also include oil separation, pump stations, and commissioning of pipeline. Also, responsible for supervision of schedule and estimate development including all key activities such as process, production facilities, water injection and… Show more As Piping and Pipeline Engineer who was providing service to Chevron Pacific Indonesia for NDD project was executed to initiate production of 3 billion barrel oil field in Duri, Indonesia. Development includes 750 production and water injection wells. Facilities also include oil separation, pump stations, and commissioning of pipeline. Also, responsible for supervision of schedule and estimate development including all key activities such as process, production facilities, water injection and gas disposition facilities, power generation, pump and compressor station, pipelines in engineering phase. Show less
  • Pt. Lapi Itb
    Stress Engineer And Material Engineer(Mechanical/Piping)
    Pt. Lapi Itb Feb 2006 - Oct 2006
    Responsible for design engineering(stress analysis) and material testing. Development research includes numeric method (Finite Element Method Analysis) and experimental method. Facilities experimental also include strain gage, wheaston bridge, Linear Variabel Diferential Transducer(LVDT) to calculate strain of material. Also, responsible for supervision of schedule and estimate development research including all key.
  • Gmf Aeroasia
    Inspection And Leightweight Structure Engineer(Design Engineer)
    Gmf Aeroasia May 2005 - Dec 2005
    Greater Jakarta Area, Indonesia
    Since involving at PT.Garuda Maintenance Facilities-AeroAsia my responsibilities encompassed the following tasks: • Clarify and analysis type of corrosion damage on the fuselage Boeing 747-400• Clarify necessary of material base on mechanical properties and review design • Liaise for replacement corroded material with new material through the procedure of material testing• Prepare design and stress analysis for bid concept of repair • Calculate strength of material fitting… Show more Since involving at PT.Garuda Maintenance Facilities-AeroAsia my responsibilities encompassed the following tasks: • Clarify and analysis type of corrosion damage on the fuselage Boeing 747-400• Clarify necessary of material base on mechanical properties and review design • Liaise for replacement corroded material with new material through the procedure of material testing• Prepare design and stress analysis for bid concept of repair • Calculate strength of material fitting (rivet) among skins using analytical method.• Measure of weight balance analysis on the Boeing 747-400. Show less

Palka Adripta Skills

Pipelines Engineering Subsea Engineering Piping Project Engineering Oil And Gas Feed Project Management Finite Element Analysis Epc Flow Assurance Offshore Drilling Oil/gas Analysis Mechanical Engineering Procurement Pipeline Analysis Cost Estimating Welding Mechanical And Piping Analysis Corrosion Factory Metallurgy Deep Water Development Installation Engineering Materials Science Advanced Welding Mechanical Static Material Engineering Subsea Equipment Design Mooring Analysis

Palka Adripta Education Details

Frequently Asked Questions about Palka Adripta

What company does Palka Adripta work for?

Palka Adripta works for Elnusa Petrofin

What is Palka Adripta's role at the current company?

Palka Adripta's current role is Divison Head and Sr.Manager(HSSE Performance and Operation).

What is Palka Adripta's email address?

Palka Adripta's email address is pa****@****ring.sg

What schools did Palka Adripta attend?

Palka Adripta attended Institut Teknologi Bandung, The Institution Of Engineers Indonesia, Institut Teknologi Bandung, Lambert Consult - Laboratory For Management And Business Expert.

What are some of Palka Adripta's interests?

Palka Adripta has interest in Deep Water Development, Project Engineering And Cost Estimating, Subsea Facilities, Science And Technology, Arts And Culture.

What skills is Palka Adripta known for?

Palka Adripta has skills like Pipelines, Engineering, Subsea Engineering, Piping, Project Engineering, Oil And Gas, Feed, Project Management, Finite Element Analysis, Epc, Flow Assurance, Offshore Drilling.

Who are Palka Adripta's colleagues?

Palka Adripta's colleagues are Musri Al Mahfudz, S.k.m, Yuda Alfarizi, Reza Kurniawan, Gustian Afriza, Aulia Ika Pratiwi, S. Ak, Laras I., Alfi Fadhila Sunardi Awari.

Not the Palka Adripta you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.