Assistant Manager Utility
CurrentBOILER,COOLING TOWER,CHILLER,NITROGEN,ETP,STP ERECTION AND COMMISSIONING PROJECT WORK, AIR, STEAM, WATER LINE ERECTION WORK, HAVING KEEN INTEREST IN ENERGY SAVINGS WITH CALCULATIONSJob Responsibilities: Boiler: Thermax Boiler (06 TPH) and (08TPH) water tube (A.F.B.C).D.M Plant: Cation And Anion Unit with degassifier (5m3/hr).Compressor: 1073 CFM- Screw type (02 nos.), 523 CFM-Screw type(04 nos.) .Compressor: 283 CFM-Screw type (02 nos.) High pressure compressor.Cooling Tower: Capacity-248TR(06 nos.) & 400TR (02 nos ) with induced draft cross flow type.STP PLANT : Capacity-150kl/day & 40kl/day.Chiller Plant: Chiller water cooled capacity(52TR).Nitrogen Plant: Nitrogen plant (120Nm³/hr)Boiler: Thermax Boiler (08 TPH), water tube (A.F.B.C) erection and commissioning work.Nitrogen Plant: Nitrogen plant (120Nm³/hr) erection and commissioning work.Cooling Tower: Cooling Tower (150 TR to 400 TR) erection and commissioning work.Chiller Plant: Chiller water cooled capacity(52TR) erection and commissioning work.Vacuum pump: Dry and water ring vacuum pump. CTO Air and CTO Water, Boiler renewal certificate workNew Moulded tube plant,tyre plant, cooling tower, steam, air, water pipe line project work.