Specialist- Mechanical Maintenance
Current• Managed complete plant mechanical maintenance activities (normal operations, outages, unscheduled maintenance, and overhauling) of two 60 MW Dong Fang steam turbine generators and one 150 MW GE steam turbine. • Managed plant modification projects of existing system to make continuous. Improvement for process development and equipment reliability. • Monitored and improved team performance through training peers and young technicians. • Managed and led a team that executed major overhauling of Dong Fang steam.• turbines (2 x 60MW) in 2018 and 2019. • Managed and led a team that executed inspection of turbine main stop valve and control valve, intercept stop valve, control valve, and STG bearings of GE steam turbine (150MW) in 2022. • Led teams and executed major overhauling projects for auxiliary equipment including. Vertical pumps, boiler feed pumps, blower, centrifugal fans, etc.