Quality Manager
中国 辽宁省 大连市
2008.07-2011.101. The production plan, tracking production progress, to do a good job of production scheduling.2. Making human load analysis, production data entry, file finishing production.3. Using ERP system to the material application, and tracking management, ensure the material delivery on schedule.4. Coordinate with other each production department, ensure production task to complete.5. Ensure that the scene according to the production process of construction, site quality management.6. 5 s management;Production department kpis;Solving other emergencies.2011.10-2013.071. As the part leader, lead the team to do the quality control in the process of shipbuilding.2. Production of ITP, shipbuilding before welding, after welding inspection at each stage;The gas-tight test, strength test, and participate in the trial.3. Coordination of the owner, classification society and outsourcing companies, to ensure that the work can according to the specification and complete plan.4. Make training materials, outsourcing for quality education;And the department inspector training.5. Review all inspection report and make the delivery documents.Such as: NDT reports, airtight drawings, inspection table, equipment certificate, etc.6. Statistics weekly inspection pass rate and field quality problem, report to the superior leadership do quality every week.