Project Manager
Schedule, track, status, and coordinate with engineering and construction the installation of all AP1000 Nuclear Power Plant I&C instruments, PLC, skid mounted packages (e.g., chemical analysis, water treatment, air compressors, auxiliary boiler, etc.), and Distributed Control System (DCS) cabinets and network infrastructure. Interface between vendor and on-site craft labor to receive drawings, procedures, and components for Field Change Notices (FCN) to ensure FCN implementation on site prior… Show more Schedule, track, status, and coordinate with engineering and construction the installation of all AP1000 Nuclear Power Plant I&C instruments, PLC, skid mounted packages (e.g., chemical analysis, water treatment, air compressors, auxiliary boiler, etc.), and Distributed Control System (DCS) cabinets and network infrastructure. Interface between vendor and on-site craft labor to receive drawings, procedures, and components for Field Change Notices (FCN) to ensure FCN implementation on site prior to construction installation milestones. Analyze, develop, and document test acceptance criteria for fiber optic cable installation and termination and network operability acceptance. Show less