Area Construction Manager - Facilities
Irving, Texas, Us
As the Facilities & Tanks Area Construction Manager, my main responsibilities include but are not limited to the oversight of the safe execution of all construction activities, schedule, cost, and resource allocation for this contract. Facilities are comprised of six separate work locations which are: Screening Plant & Process Water, MLSB (Recycle Water) Pump House, Trim Heater, Chemical Injection, 3rd Stage (Hydro Transport) Pump House, and Caustic Plant. Tanks are comprised of two locations; which are: Process Water – 3,170,000 gallon hot water tank and Caustic tank – 193,000 gallon. To date, the facilities contractor, the tanks contractor and multiple sub-contractors have successfully mobilized and/or demobilized, commenced and continue construction execution to a high safety and quality standard while mitigating all construction obstacles, schedule impediments and clients requests for changes and additional scope. Currently maintain project required progress reporting, communicating updates to the Construction Director and Client, while streamlining interfaces with all other project contractors to prevent schedule delays for Facilities and the project. Positively developed relationships with the client and the contractor, allowing the Facilities group to integrate with the ongoing commissioning group to achieve schedule expectations and demobilization requirements. When called upon, the ‘delegation of authority’ has been an honored responsibility requested by the Project Construction Director’s when absent from site.