Summer Engineering Intern
Department: Technical Team (Method)Project: Trunk Road T2 and Infrastructure Works for Developments at the Former South Apron-Investigated the discrepant level difference at the interface between cross passages and parapets as well as prepared the CAD drawings to show the constraints-Investigated the Internal Slab Structure Gantry (ISSG) dismantling area.