Paul Van Dorst personal email
- Valid
Aeronautical Engineer with experience in project management, project execution, proposal management, maintenance solutions and technical commercial activities in the offshore and dredging industry. Eager to learn and improve every day.
-
Owner Crossfit Gold PactCrossfit Gold Pact Jan 2020 - PresentRotterdam, South Holland, Netherlands -
BestuurslidJeugdfonds Sport & Cultuur Rotterdam Dec 2023 - PresentRotterdam, Zuid-Holland, Nederland -
BestuurslidD66 Rotterdam Mar 2023 - PresentRotterdam, Zuid-Holland, NederlandAlgemeen bestuurslid. Verantwoordelijk voor Talentontwikkeling & Opleidingen, en Baas aan de Maas. -
ChairmanRoze Kameraden Aug 2021 - PresentRotterdam And The Hague
-
Product ManagerFokker Services Jun 2019 - Jan 2020Oude Meer, Provincie Noord-Holland, NederlandProduct Manager Avionics -
Proposal ManagerRoyal Ihc May 2017 - Jun 2019Kinderdijk, Provincie Zuid-Holland, Nederland- Responsible for reviewing and improving the Spare Part Management process within IHC. - Proposing spare part packages and other maintenance solutions to our clients, based on a maintenance strategy as discussed and as set up with the client. -
Sales EngineerRoyal Ihc Sep 2016 - May 2017Kinderdijk, Provincie Zuid-Holland, Nederland -
ProjectwerkvoorbereiderHollandia Corporate Sep 2015 - Sep 2016Project preparation and coordination for service project in the infrastructure industry. Projects:Renovation Hartelkering: preparation of the project, delivery of the execution plans. -
Work Preparation&Subcontracting EngineerHuisman Equipment B.V. Dec 2011 - Sep 2015SchiedamProject coordination and subcontracting engineer within the supply chain. The main scope of work is the subcontracting of steel (sub)assemblies, both inhouse and to external (inter)national parties. The highest priorities for subcontracting are attention to quality, planning, budget and feasibility, which are combined in a projectplan.Other activities consist of giving feedback and advice to engineering to create better shopdrawings and working together with several departments in the… Show more Project coordination and subcontracting engineer within the supply chain. The main scope of work is the subcontracting of steel (sub)assemblies, both inhouse and to external (inter)national parties. The highest priorities for subcontracting are attention to quality, planning, budget and feasibility, which are combined in a projectplan.Other activities consist of giving feedback and advice to engineering to create better shopdrawings and working together with several departments in the most efficient way. Futhermore, estimations have to be created to be able to assess quotations. More irregularly, electrical and hydraulic subcontracted items pass my desk. Projects:Subsea7 Seven Waves - tillable pipe lay system and offshore mast crane.CEONA Amazon - multi pipelay system and offshore mast cranes.HELIX SIEM 1&2 - multi purpose tower/well intervention system.Tocardo Tidal Power Plant - Oosterschelde kering. Show less -
Jr. Structural EngineerHuisman Equipment B.V. Sep 2011 - Dec 2011SchiedamJr. Structural Engineer at the pipelay departement. -
StudentassistantInholland University Of Applied Sciences Oct 2010 - Mar 2011Assistant of the lecturer at Inholland Delft for Aeronautical Engineering CATIA courses. -
Final InternshipDutch Space Sep 2009 - Feb 2010Final internship in order to finish the Bachelor study Aeronautical Engineering. I spent 6 months on designing an engine thrust frame for the second stage of the Ariane 5. Due to a new engine on the second stage for the Ariane 5 rocket, the thrust frame had to be redesigned. Criterium for the frame was to be made of CFRP, with layer angle optimized for the specific part of the thrust frame; the top and bottom of the frame had to be more elastic, while the middle of the frame had to… Show more Final internship in order to finish the Bachelor study Aeronautical Engineering. I spent 6 months on designing an engine thrust frame for the second stage of the Ariane 5. Due to a new engine on the second stage for the Ariane 5 rocket, the thrust frame had to be redesigned. Criterium for the frame was to be made of CFRP, with layer angle optimized for the specific part of the thrust frame; the top and bottom of the frame had to be more elastic, while the middle of the frame had to remain its stiffness. Show less -
InternshipUniversity Of The Witwatersrand Sep 2008 - Feb 2009Internship at WITS University, Johannesburg, South-Africa. Worked on an electrical car, with a focus on the electric design (battery packs, solar array).
Paul Van Dorst Skills
Paul Van Dorst Education Details
-
Aeronautical Engineering
Frequently Asked Questions about Paul Van Dorst
What company does Paul Van Dorst work for?
Paul Van Dorst works for Crossfit Gold Pact
What is Paul Van Dorst's role at the current company?
Paul Van Dorst's current role is Social Entrepreneur.
What is Paul Van Dorst's email address?
Paul Van Dorst's email address is pa****@****ail.com
What schools did Paul Van Dorst attend?
Paul Van Dorst attended Hogeschool Inholland.
What are some of Paul Van Dorst's interests?
Paul Van Dorst has interest in Football, Technology, Cycling, Sports, Running, Space, Crossfit.
What skills is Paul Van Dorst known for?
Paul Van Dorst has skills like Catia, Engineering, Nastran, Ansys, Finite Element Analysis, Msc.patran, Solidworks, Project Engineering, Aerospace, Patran, Autocad, Mechanical Engineering.
Not the Paul Van Dorst you were looking for?
-
1rauwcoaching.nl
-
Paul van Dorst
Forensisch Arts At Farr (Forensisch Artsen Rotterdam Rijnmond)The Randstad, Netherlands1hotmail.com -
2olco.nl, telfort.nl
-
1arcadis.nl
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial