I am a result-driven management professional with nearly 3 decades of experience in Instrumentation & Control, Operations & Maintenance, Erection & Commissioning and so on for Thermal Power Plants. I spearheaded Operations & Maintenance operations for Jindal India Thermal Power Plant, Derang, Angul, Odisha. (HOD), Reliance Energy Ltd. (Formerly BSES Ltd.), Dahanu Thermal Power Plant (MS) as Manager C&I (HOD) and Adani Power Limited, Kawai, Rajasthan. General Manager (HOD C&I).During my professional stint, I gained experience in heading Instrument Section to ensure the reliability of the instrument systems and their efficiency in the control and troubleshooting of control panel, pneumatic panel, and automation of process lines; champion of the Six-Sigma Project attained 95% Availability of Auto Control Loops. I have proven skills in surpassing production targets within deadlines and improving quality & process efficiency through implementation of tools such as ISO 9001, 14001 & 18001, 5S, Lean, TPM, TQM and Kaizen.I drove business excellence and C&I initiatives & maintenance of 2 X 250 MW, 2 X 300 MW, 2 X 600 MW and 2 X 660 MW Thermal Power Stations which includes driving cost reductions, cost controls, reduction in rejection/ rework, productivity improvements, identifying breakthrough projects, energy savings and sustenance programs. I delivered competitive advantage by enhancing operational effectiveness of plants, driving process transformations, energy conservation & cost savings, uncovering underlying issues at plant level and eliminating rejections.People Engagement Professional, with an ability to foster a collaborative professional network with cross-functional teams while ensuring an employee-centric approach and addressing priorities as well as delegating and prioritizing complex tasks effectively to track and ensure compliance with deadlines. Feel free to contact me at: pavanshinde@hotmail.com
-
Addl. Vice PresidentJindal (India) LimitedPune, Mh, In -
Addl. Vice PresidentJindal (India) Limited Jun 2015 - PresentDerang, Kaniha, Angul, Odisha 2X 600 MwMaintaining the PM's maintenance cycle, including running defects, breakdown defects, shutdown defects, AOH work, etc. budget management, activity planning, and task distribution for attainable targets, equitable distribution of resources, successful completion of assigned tasks, and efficient administration of personnel resources. Timeliness and accurate cost estimates must be maintained as per all contractual obligations, as well as all applicable quality, health, safety, and environmental laws and regulations, and the specifications of the contractor. Identified areas for improvement and recommended process improvements to boost operational efficiencies of the project; acted as essential link between various departments. Implementing continuous improvement to raise the quality of work practises, procedures, and standards as well as the output of machines to cut down on wasteful downtime and maximise the useful life of such tools. Leadership in C&I System analysis; Preventive and predictive maintenance; Root cause analysis (RCA); Equipment-specific availability; Preventive Maintenance Compliance; Spares and Consumables trend; Breakdown data; Condition-based Monitoring (CBM); Contractor Performance Score Card; Housekeeping (5S); Training; and Documentation. Standard Operating Procedures (SOP) and Standard Maintenance Procedures (SMP) for maintenance systems must be reviewed on a regular basis to verify that work is being carried out effectively in terms of time, money, resourcesOUTCOMEo Improved operating efficiency by implementing Just-in-Time (JIT) Methodology thereby controlled minimum generation loss and minimum oil consummation due to maintenance problem.o Implemented latest Reliability improvement maintenance techniques such as FMEA and Six Sigma Methodologyo Successfully implemented Spares development from OEM instead of purchasing from BHEL which resulted in saving INR 148 Lakhs -
Senior General Manager – Moserbaer Power Ltd.Lanco Jun 2014 - Jun 2015IndiaSupported new technology acquisition, other strategic growth initiatives and maintained a momentum of improvement by increasing the number of modifications and effectively performed 23 Nos. Headed the development of 4 crucial Chinese spare part parties in India which resulted in saving INR 82 Lakhs. Spearheaded the implementation of various cost saving policies like salvation of the material from scrap, card repairing which resulted in saving INR 42 Lakhs and INR 4 Lakhs respectively. -
General Manager, (2X660 Mw) O&M, Kawai, RajasthanAdani Power Limited Jul 2012 - Jun 2014Kawai, Baran, RajsthanReviewed the management systems like IMS, SA, ISMS, EnMS and so on. Led plant maintenance operations and ensured the review of daily defects, preventive maintenance orders, environmental aspects, hazard identification & risk assessment of C&I Maintenance. Expressed exceptional relationship management skills which resulted in establishing connection with Site Office, Chinese EPC Agencies SEPCO-III (Qingdao) & SCMEC (Chengdu) and their Design Institutes SWEPDI (Chengdu) & NWEPDI (Xi’an) and Sub-contractors. Developed 6 Chinese spare part parties in India and saved INR 56 Lacs. Implemented salvation of the material from scrap and card repairing which resulted in saving INR 12 Lakhs and 8 Lakhs respectively. -
Assistant General Manager, (5 X 660 Mw) Project, Mundra, GujaratAdani Power Aug 2009 - Jun 2012 -
Deputy General Manager, (5 X 660Mw) Pmg, AhmedabadAdani Power Mar 2008 - Jul 2009 -
Manager Epc For 2 X 300 Mw Thermal Power PlantReliance Energy Limited Aug 2007 - Apr 2008Yamunanagar, Haryana, India -
Manager C&I (Hod) 2 X 250 Mw Dahanu Thermal Power Plant, Dahanu (Ms)Reliance Energy Apr 2003 - Jul 2007Dahanu Thermal Power Plant MsSuccessfully achieved the target date by performing 28 modifications at site. Spearheaded and excelled at the Unit # 1 erection & commissioning within record time of 27 months without a single day delay due to C&I problem. Developed critical missing items for China. Achieved 95% availability of Auto Control Loops and acted as champion of the Six-Sigma Project. -
Sr. Engineer (C&I), Additional Manager (C&I) – 2 X 250 Mw Dtps, Control & Instrumentation DeptReliance Energy Jun 1994 - Mar 2003Supervised C&I Team and coordinating in C&I maintenance cycle of the PM, Running Defects, Break Down Defects, Shutdown Defects, AOH work and so on. Managed C&I Budget, activity scheduling and work allocation to ensure measurable goals, proper workload distribution, goal satisfaction and effective staff management. Served as champion of the Six-Sigma Project and achieved 95% availability of Auto Control Loops. -
Sr. Engineer | (2 X 250 Mw Engineering Division)Bses Jul 1991 - May 1993Mumbai, Maharashtra, India -
Project EngineerJay Computers - India Jan 1991 - Jun 1991Navi Mumbai, Maharashtra, India -
Production EngineerAchep Electronics Jul 1987 - May 1989Sangli, Maharashtra, India
Pavan Shinde Education Details
-
Bureau Energy EfficiencyEnergy Manager -
Instrumentation -
Computer Science -
Distinction
Frequently Asked Questions about Pavan Shinde
What company does Pavan Shinde work for?
Pavan Shinde works for Jindal (India) Limited
What is Pavan Shinde's role at the current company?
Pavan Shinde's current role is Addl. Vice President.
What schools did Pavan Shinde attend?
Pavan Shinde attended Bureau Energy Efficiency, Doctor Babasaheb Ambedkar Marathwada University, Shivaji University, Shivaji University, Shivaji University.
Not the Pavan Shinde you were looking for?
-
PAVAN SHINDE
Bengaluru -
Pavan Shinde
Pune -
1druva.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial