Test Engineer
Project Name: B787 ECS and NGS Requirement Based Testing; Team Size: 15Testing Style: Manual TestingTool Used: EPACS Tools, Iniman, RTD, Test Sequencer and Ms-OfficeCM Tool: Serena Change Man Dimensions; Brief Description:The objective of the project is to perform Requirement Based Testing (RBT) for Boeing 787 Environmental Control System (ECS) and Nitrogen Generation System (NGS).The Requirement Based Testing (RBT) activities are carried out as per software verification plan of B787 ECS and NGS program. Aircraft Air management systems consists of ECS and NGS. Environmental Control System of an aircraft provides air supply, thermal control and pressurization for the passengers and crew. Avionics cooling, smoke detection and fire suppression are also commonly considered part of the Environmental Control System. Nitrogen generation system enriches the Nitrogen content in the air which protects the aircraft fuel control system from fire.Responsibilities:B787 Air Management System target test environment for executing the test scripts.Performing the requirement analysis and preparing the Test Procedures.Setting up the target test environment for executing the Test Scripts.Preparing the Test Scripts and executing using EPACS environment.Performing Peer Review of the work products and reporting the problems to the customer.Defect Reporting and Defect Logging in Defect Management Tool.Project Name: B787 EPGSS Desktop Simulator SupportTeam Size: 20