Paulo Brandão Email and Phone Number
Paulo Brandão work email
- Valid
Paulo Brandão personal email
Experience and qualifications on Oil Platforms, Refineries and Utilities Plants Design:• Solving of technical issues related to project as a Job Leader or Package Engineer, within the mechanical discipline and with others disciplines, client and classification society, • Execution of Mechanical and thermal calculation of process equipment,• Preparation of equipment data-sheets, specifications and equipment requisitions,• Involvement with Vendors during bid clarification, document analysis and HAZOP,• Plan and co-ordinate activities of a team of engineers for providing technical services to project executing departments, including review of project execution strategies,• Participate in technical assurance and standardization activities to ensure compliance to approved discipline standards,• Checking compliance of design with design codes, contractual documentation standard and practices,• To assist the Contract Manager/Engineer in defining new prices, in preparing amendments to subcontracts and in analyzing and discussing claims,• Support to manufacture, field assembly and commissioning.
Elecnor Do Brasil
View- Website:
- elecnor.com.br
- Employees:
- 507
-
Coordenador De MecânicaElecnor Do Brasil Jun 2024 - PresentSão Paulo, São Paulo, BrasilEneva - Projeto Azulão 950 Mw - Implantação de uma Unidade de Tratamento de Gás (UTG) que vai abastecer o Complexo Termoelétrico de Azulão, no município de Silves, no Estado do Amazonas. -
Senior Mechanical EngineerToyo Setal Jul 2022 - May 2024São Paulo, São Paulo, BrasilStatic equipment engineer in the project to build a diesel hydrotreatment unit (HDT) and refurbish existing units at the Paulínia Refinery (Replan). With this project, all diesel production at this refinery will be of the S-10 type, whose sulfur content is lower than that of S-500 diesel, which will no longer be produced. -
Senior Equipment EngineerDbr Energies Sep 2021 - Jul 2022Rio De Janeiro, BrasilResponsible for the Hydrogen Dew Point Control Unity package and for the supervision of the static equipment packages in the project of Petrobras Platform P-78 - Búzios 7 project, with a production capacity of 180,000 barrels of oil per day (bopd) and 7.2 million cubic meters of gas (mcbm) per day. Platform to be built by Keppel Shipyard’s shipyard which belongs to Keppel Offshore & Marine (Keppel O&M). -
Senior Equipment EngineerKempetro Engenharia Oct 2020 - Aug 2021Macaé, Rio De Janeiro, BrasilSupport the execution of mechanical equipment projects for Petrobras production platforms in the Campos Basin. -
Senior Mechanical Project EngineerIntertechne Jan 2019 - Oct 2020Rio De Janeiro E Região, BrasilServices in the field of Equipment Engineering for Braskem in Rio de Janeiro, São Paulo e Rio Grande do Sul. -
Senior Mechanical EngineerProcald Engenharia Aug 2017 - Dec 2018Rio De Janeiro Area, BrazilConsulting firm in the field of mechanical engineering and project of process equipment, piping and structures for chemical and process units.2017 - 2018 - Intertechne Consultores S.A - Detailing design and analysis of Technical Proposals and documentation of equipment suppliers for the new Oxygenate Removal System, that was added to the UNIB 4 (DCX) Ethylene Plant of Braskem in Rio de Janeiro. 2018 - Intertechne Consultores SA - Braskem - Technical Analisys for the Industrial Cogeneration Package of UNIB3 and attendance to several other demands for Technical Specifications, Material Requisitions, Analysis of Proposals and documentation of Suppliers of equipment for units in Rio de Janeiro and São Paulo. -
Senior Mechanical EngineerPlanave S.A. Estudos E Projetos De Engenharia / Sondotécnica Engenharia De Solos S.A. Jan 2016 - Aug 2016Rio De Janeiro E Região, BrasilTechnical Proposal - Lobito Refinery Project - Angola - Odebrecht Engenharia & Construção Internacional - Material Requisition and vendor's bid analysis of Mechanical Equipment and Packages for Process and Utilities Units. -
Senior Mechanical EngineerDoris Engenharia Ltda Oct 2015 - Dec 2015Rio De Janeiro E Região, BrasilTechnical Proposal - Libra & Sepia Floating Production Storage and Offloading Platforms - Bluewater - Data Sheet, Material Requisition and vendor's bid analysis of Mechanical Equipment and Packages for Hull and Topsides. -
Senior Mechanical EngineerConsorcio Queiroz Galvão - Iesa - Tecna - Qgit Apr 2014 - Sep 2015Rio De Janeiro E Região, BrasilEPC - COMPERJ - UPGN - UNIDADES DE GÁS NATURAL - ROTA 3 - Leader of Mechanical Design Team of Process Skids and execution of technical bid evaluation and technical documentation analysis of Mechanical Equipment and Packages for Process Units.
-
Senior Mechanical EngineerConsórcio Pedra Bonita Mar 2012 - Mar 2014Rio De Janeiro E Região, BrasilEPC - COMPERJ - Utilidades - TUC Construções (Toyo / UTC / Odebrecht) - Leader of Static Equipment Mechanical Design team - vendor's bid and project analysis of static process equipment (Boilers, HRSG, Pressure Vessels, Deaerator, API Storage Tanks, Heat exchangers) on Steam Generation, Water and Effluent Treatment Utilities Project -
Senior Mechanical EngineerHemisul.Scet Oct 2011 - Feb 2012Rio De Janeiro Area, BrazilTechnical Proposal - GUARA BV / TUPI BV - MODULES PACKAGES & INTEGRATIONS FOR FLOATING PRODUCTION STORAGE OFFLOADING PLATFORMS - Odebrecht / UTC / OAS - Data Sheet, Material requisition and vendor's bid analysis of mechanical equipment.
-
Senior Mechanical EngineerConsórcio Pmp Odebrecht Mar 2008 - Oct 2011Rio De Janeiro E Região, BrasilBasic Design Revision - COMPERJ - Toyo / UTC / CNO - Steam Generation, Water and Effluent Treatment Utilities Project - 2010 - 2011EPC - REPAR - CONPAR (Odebrecht / UTC / OAS ) - Technical specification, vendor's bid and project analysis of process equipment and process systems on eight industrial units: five gasoline and three coking - Petrobras - 2008 - 2009 -
Senior Engineer ConsultantScet Soluções De Engenharia E Tecnologia S.A. – Rio De Janeiro - Rj Jul 2006 - Feb 2008Rio De Janeiro E Região, BrasilMaterial requisition, vendor's bid and project analysis of process equipment and process systems - Gasoline / Diesel / Coke Projects - RNEST / RECAP / REFAP / REVAP / RDUC - Petrobras -
Job Leader / Mechanical Design EngineerUtc Projetos E Consultoria S.A. / Technip Engenharia S.A. – Rio De Janeiro - Rj Dec 1997 - Jul 2006Rio De Janeiro E Região, BrasilFEED - Platform P-55 - Roncador Project – Petrobras/Cenpes - 2005 / 2006Basic Design - UTGCA (Caraguatatuba - SP) - Petrobras/Cenpes – 2005FEED - Carbocloro Factory Expansion (Cubatão - SP) - Carbocloro – 2005FEED - Delayed Coking Unit - Petrobras/REVAP – 2004 / 2005EPC - Pólo Industrial de Guamaré – Off Site, UPGN III, USG II, UTG III & ECUB VI – Petrobras – RN – 2004EPC - Peroá-Cangoá Field Development – UTGC & PPER – Petrobras / Setal Construções – ES – 2003 / 2004EPC - Gas Compression System for Platform P-50 - Petrobras / Dresser – 2002 / 2003EPC - Platform P-43 & P-48 – Barracuda & Caratinga Project - Petrobras / Halliburton – 2001FEED - HDS - On Site / Off Site – Petrobras / REPAR – PR - 2000Detailing Design - PET Lines optimization – Bayer - RJ – 2000EPC - UDS – Petrobras – Ultratec / REFAP – RS - 1999EPC - Oil Dehydration System, Fuel Gas System, Pressure Vessels and Heat Exchangers for Platform P-37 - Petrobras – 1997 / 1998 -
Mechanical Design EngineerNuclebras Equipamentos Pesados S.A. - Nuclep - Itaguaí - Rj Apr 1993 - Oct 1997Itaguai - RjSkids of Platform P-25 – Petrobras – Campos Basin - 1996 . Combined Process Tower – according to ASME Code Sec.VIII div. 1 - Petrobras / REGAP – MG - 1995Pressure vessels, heat exchangers, furnaces, atmospheric tanks, reactors and process columns , total of 75 equipment – according to ASME Code Sec.VIII div. 1 and API-650 - CNEN / CTM-SP - 1993 / 1995
-
Mechanical Design EngineerIshikawajima Do Brasil - Estaleiros S.A. Ishibras (Campo Grande Factory) – Rio De Janeiro - Rj Sep 1987 - Oct 1992Rio De Janeiro E Região, Brasil- Depropenizer and Deetanizer Towers - Unidade de Propeno Grau Polímero – according to ASME Code Sec.VIII div. 1 - Petrobras / REDUC – RJ - 1990 / 1991Polimerization Reactor - according to ASME Code Sec.VIII div. 2 – Braspol Polímeros / POLIBRASIL – RJ - 1990- Inert Gas System for oil Vessel – Petrobras – 1987 / 1988
Paulo Brandão Skills
Paulo Brandão Education Details
-
Mechanical Engineering
Frequently Asked Questions about Paulo Brandão
What company does Paulo Brandão work for?
Paulo Brandão works for Elecnor Do Brasil
What is Paulo Brandão's role at the current company?
Paulo Brandão's current role is Engenheiro mecânico Sênior.
What is Paulo Brandão's email address?
Paulo Brandão's email address is pa****@****tal.com
What schools did Paulo Brandão attend?
Paulo Brandão attended Universidade Federal Fluminense.
What skills is Paulo Brandão known for?
Paulo Brandão has skills like Engenharia De Projetos, Feed, Epc, Pressure Vessels, Engenharia, Cpe, Asme, Fpso, Engineering, Gas, Petroleum, Oil/gas.
Who are Paulo Brandão's colleagues?
Paulo Brandão's colleagues are Emerson Cunha, Jadilson Chaves, Alan Silva, Jackson Teixeira, Monclar Ribeiro Teixeira, Geirton Reis, Gelson Vasconcelos.
Not the Paulo Brandão you were looking for?
-
Paulo Brandão
Advogado | Gerente Jurídico | Coordenador Jurídico | Direito Criminal | Direito Administrativo | Direito Corporativo | Direito Penal | Direito Constitucional | Contencioso Jurídico | Defesa JurídicaJaboatão Dos Guararapes, Pe -
-
-
-
2hotmail.com, supergasbras.com.br
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial