I am currently working as a Systems Engineer at Boeing. As a Systems Engineer, I will be responsible for the design, development and maintenance of complex systems at Boeing. This may involve aircraft systems, avionics, communication systems, etc. Analyze customer requirements, translate them into detailed system requirements, and ensure that system design and development meets those requirements. Integrate individual subsystems and components into the overall system and perform system level testing and verification to ensure the integrity of system functionality and performance, you will provide technical support, resolve system related issues, and participate in troubleshooting and repair efforts. Participate in project management activities, overseeing project progress, resource allocation, and delivery schedules to ensure projects are completed on schedule.As a Systems Engineer at Boeing, I will work on the design, development, testing and verification of complex systems in the aerospace field and work with teams to ensure system reliability, safety and performance. This requires technical expertise, innovative thinking, problem solving skills, and teamwork.
Architecture Northwest P.C.
-
ArchitectArchitecture Northwest P.C. Feb 2001 - PresentGresham, Oregon, United StatesCommercial, retail and fuel system designs
-
System EngineerBoeing May 2016 - May 2024United StatesSupporting ASC2 programs on Flight Deck Integration. Support B-52 1760 program by answering technical and non-technical questions regarding B-52 weapons systems capability and limitations. Serve as the point of contract for all interface activities involving weapons on B-52 aircraft.Coordinate with applicable engineering organizations (hardware and software groups) whenever there is an interface issue that needs to be resolved or a proposed interface change that needs to be reviewed.Coordinator on the CRL Handling Fixture supporting the engineering design of the tooling fixture. Delivered result to customer ahead of schedule. Support the IFF kit installation on the B-52. Working with customer at base location on the installation and the installation was completed on schedule.Support the effort as the System Engineer for KC-135 Adaptive Compliant Flap Tab program.Support the effort for MUSTANG IQT and FQT in the SIL. Perform formal qualification testing of the requirements as defined in the MUSTANG Software Requirements Specification (SRS). -
Industrial EngineerBoeing Dec 2013 - Apr 2015Support flight line on the 787 program, coordinating flight status and delivery of the airplanes to customers.• Develop integrated program schedules that optimize equipment, personnel, and tools for maximum efficiency.• Plan and develops tactical approaches to cross-functional process improvement projects.• Perform 5S evaluation on monthly occurrence site wide for program manager review.• Compiles labor and work requirements data to develop labor forecasts. • Analyze potential process improvements in support of lean initiatives. • Participant in an Accelerated Improvement Workshop Leadership Training Program to improve work skills. -
Industrial EngineerGulfstream Aerospace Sep 2013 - Nov 2013Lead/coordinate the implementation of projects between multiple organizations.• Implement plan layout, process flow, and material handling techniques. Design and build tooling fixtures to support the technicians. • Initiate and implement cost reduction programs. -
Industrial EngineerSpirit Aerosystems Feb 2013 - Sep 2013Initiate, coordinate, and conduct cost reductions, lean, and optimization project with Spirit suppliers. • Lead improvement projects and present project presentation to senior management. • Asset project with suppliers for cost reductions.• Working with engineering using ENOVIA CATIA V5, on design changes requested by suppliers. -
Program ManagerBeechcraft Sep 2006 - Feb 2012Program manager for contracts and proposals representing HBC in government bids.• Project manager of new products development.• Develop, analyze and monitor project schedule to track mile stones and coordination of project activities.• Establish, track, and report project progress to top level managers. • Interact with operators on the work content of the project. Give the operators an open door communication to get feedback on the status of the project. • Lead cross functional team in program execution from definition through successful release and transfer to operation to customer. -
Industrial EngineerBoeing Sep 2005 - Sep 2006
Peter K. Education Details
-
Program Management -
Industrial Engineering -
Architecture
Frequently Asked Questions about Peter K.
What company does Peter K. work for?
Peter K. works for Architecture Northwest P.c.
What is Peter K.'s role at the current company?
Peter K.'s current role is President at Architecture Northwest P.C..
What schools did Peter K. attend?
Peter K. attended Wichita State University, Purdue University, California State Polytechnic University-Pomona.
Not the Peter K. you were looking for?
-
5lifetech.com, lifetechnologies.com, yahoo.com, us.nestle.com, thermofisher.com
2 +176047XXXXX
-
Peter Nance
Austin, Tx4queadvisors.com, teknecon.com, icfi.com, gmail.com2 +151226XXXXX
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial